    "act_title": "Kerala Factories Rules, 1957",
    "act_slug": "kerala-factories-rules-1957",
    "section_label": "Section",
    "section": {
        "number": "31-",
        "title": "Section 31- Pressure plant",
        "chapter": null,
        "content": "Degree in Chemical or Electrical or Metallurgical\n\t\t\t\t\tor Mechanical Engineering or its equivalent.\ni. A minimum experience\n\t\t\t\t\tof 10 years in-\na. design or erection\n\t\t\t\t\tor maintenance, or\nb. testing, examination\n\t\t\t\t\tand inspection of pressure plants.\nii. He shall be-\na. conversant with the\n\t\t\t\t\trelevant codes of practices and test procedures relating to\n\t\t\t\t\tpressure vessels ;\nb. conversant with\n\t\t\t\t\tstatutory requirements concerning the safety of unfired pressure\n\t\t\t\t\tvessels and equipment operating under pressure ;\nc. conversant with\n\t\t\t\t\tnon-destructive testing techniques as are applicable to pressure\n\t\t\t\t\tvessels ;\nd. able to identify defects and arrive at a\n\t\t\t\t\treliable conclusion with regard to the safety of pressure\n\t\t\t\t\tplants.\nFacilities for carrying out hydraulic test,\n\t\t\t\t\tnon- destructive test, gauges/equipment/ gadgets for measurement\n\t\t\t\t\tand any other equipment or gauges to determine the safety in the\n\t\t\t\t\tuse of pressure vessels\n6\ni. Section 36-\n\t\t\t\t\tprecautions against dangerous fumes.\nii. Rules made under\n\t\t\t\t\tsections 41 and 112 concerning ship building and ship repairs.\nMasters degree in Chemistry, or a degree in\n\t\t\t\t\tChemical Engineering\ni. A minimum of 7 years\n\t\t\t\t\texperience in collection and analysis of environmental samples\n\t\t\t\t\tand calibration of monitoring equipment;\nii. He shall-\na. be conversant with\n\t\t\t\t\tthe hazardous properties of chemicals and their permissible\n\t\t\t\t\tlimit values;\nb. be conversant with\n\t\t\t\t\tthe current techniques of sampling and analysis of the\n\t\t\t\t\tenvironmental contaminants and\nc. be able to arrive at a reliable conclusion as\n\t\t\t\t\tregards the safety in respects of entering and carrying out hot\n\t\t\t\t\twork\nMeters, instruments and devices duly calibrated\n\t\t\t\t\tand certified for carrying out the tests and certification of\n\t\t\t\t\tsafety for working in confined spaces.\n7.\nVentilation systems as\n\t\t\t\t\trequired under various Schedules framed under section 87, such\n\t\t\t\t\tas Schedules on-\ni. Grinding of glazing\n\t\t\t\t\tof metals and processes incidental thereto\nii. Cleaning or\n\t\t\t\t\tsmoothing etc. of articles, by a jet of sand, metal shot or\n\t\t\t\t\tgrit, or other abrasive propelled by a blast of\ncompressed air or\n\t\t\t\t\tsteam.\niii. Handling and\n\t\t\t\t\tprocessing of asbestos.\niv. Manufacture of\n\t\t\t\t\tRayon by viscose process.\nv. Foundry operations\nDegree in Mechanical or Electrical Engineering or\n\t\t\t\t\tEquivalent.\ni. A minimum of 7 years\n\t\t\t\t\tin the design fabrication, installation, testing of ventilation\n\t\t\t\t\tsystem and systems used for extraction and collection of dusts,\n\t\t\t\t\tfumes and vapours and other ancillary equipment\nii. He shall be conversant with relevant codes of\n\t\t\t\t\tpractice and tests procedures that are current in respect of\n\t\t\t\t\tventilation and a traction system for fumes and shall be able to\n\t\t\t\t\tarrive at a reliable conclusion with regard to effectiveness of\n\t\t\t\t\tthe system\nFacilities for testing the ventilation system\n\t\t\t\t\tinstruments and gauges for testing the effectiveness of the\n\t\t\t\t\textraction systems for dusts, vapours and fumes and any other\n\t\t\t\t\tequipment needed for determining the efficiency and adequacy of\n\t\t\t\t\tthese systems. He shall have the assistance of a suitable\n\t\t\t\t\tqualified technical person who can come to a reasonable\n\t\t\t\t\tconclusion as to the adequacy of the system.\n[3. Approval of site, construction or extension of a factory.\n(a) A flow chart of the manufacturing process supplemented with a brief description of the process in its various stages.\n(b) Plans in triplicate drawn to scale showing :\n(i) the site of the factory and immediate surroundings including adjacent buildings and other structures, roads, drains, etc.\n(ii) the plan, elevation and necessary cross-sections of the various buildings, indicating all relevant details relating to natural lighting, ventilation and means of escape in case of fire.\n(iii) The plans of layout machinery clearly indicating the position of the plant and machinery, aisles and passageways. These shall be a minimum clearance of 50cm. between machines and fixed structures.\n(c) In the case of hazardous and polluting industries, a certificate of approval of location of the factory obtained from the Chief Town planner to Government and a no objection certificate from the Kerala State Pollution Control Board.\n(d) A Chalan receipt evidencing payment or scrutiny Fee as prescribed in Appendix II.\n(e) Such other particulars as the Chief Inspector or the Deputy Chief Inspector may require.\n(i) Educational Institution\n25 metres\n(ii) Hospitals\n30 metres\n(iii) Religious-cum-worship building\n25 metres\n(iv) Tank and Canals\n10 metres\n(b) The certificate of stability referred to in clause (a) shall be readily available in the factory for inspection by the Inspectors and Additional Inspectors.\n(b) No machinery or prime mover or a permanent fixture not shown in the plans approved shall be installed, fixed or used in any factory except in replacement provided its capacity is not different and it is not occupying more floor area than that already shown in the approved plans.",
        "footnote": "",
        "is_definition": false,
        "sort_order": 4
    },
    "prev_section": "28",
    "next_section": "4"
}