Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations 2005
Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations 2005
Sections
1. Short Title, Commencement and Interpretation.
Section 12. Definitions.
Section 23. Recovery of Charges.
Section 34. System of supply.
Section 45. Requisition for supply.
Section 56. Procedure for providing fresh Electricity Service Connection.
Section 67. Agreement.
Section 78. Change of Name.
Section 89. Enhancement and Reduction of Contract Demand/Sanctioned Load.
Section 910. Security Deposit.
Section 1011. Electricity Billing.
Section 1112. Restoration of supply of electricity.
Section 1213. Meters.
Section 1314. Right of licensee to enter consumer premises and to remove fittings or other apparatus of licensee.
Section 1415. Tampering, distress or damage to electrical plant, lines or meter.
Section 1516. Wiring of Consumer Premises.
Section 1617. Schedule of Charges.
Section 1718. Service of Notice.
Section 1819. Information to Consumers.
Section 1920. Saving & Interpretation.
Section 2021. Powers to remove difficulties.
Section 21
jharkhand-state-electricity-regulatory-commission-electricity-supply-code-regulations-2005.json
•
21 Sections
•
Jharkhand
{
"id": 18099,
"slug": "jharkhand-state-electricity-regulatory-commission-electricity-supply-code-regulations-2005",
"title": "Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations 2005",
"short_title": "Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations 2005",
"act_number": "Published vide Notification No. JSERC/Regulation/6",
"act_year": 2005,
"act_type": "STATE",
"location": "Jharkhand",
"law_status": "unknown",
"enactment_date": null,
"description": "Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations 2005",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "1",
"title": "1. Short Title, Commencement and Interpretation.",
"chapter": null,
"content": "Chapter 2",
"footnote": "",
"is_definition": true,
"sort_order": 0
},
{
"number": "2",
"title": "2. Definitions.",
"chapter": null,
"content": "(a) \"Act\" means the Electricity Act, 2003;\n(b) \"Commission\" means the Jharkhand State Electricity Regulatory Commission;\n(c) \"Consumption charges\" means charge payable for the consumption of electrical energy in Kwh multiplied by appropriate tariff rates and also includes Demand /Fixed charges, Fuel Surcharge Adjustment (FSA) and customer charges etc, wherever applicable.\n(d) \"High Tension (HT) (all kinds HT) consumer\" means a consumer who is supplied electricity at a voltage higher than 440 volts.\n(e) \"HT (All Kinds of HT) rates\" means the consumption charges payable by HT consumers.\n(f) \"Low Tension (LT) Consumer\" means a consumer who is supplied electricity at a voltage up to 440 volts.\n(g) \"LT Rates\" means the consumption charges payable by LT consumers.\n(h) \"Month\" means the calendar month. The period of about 30 days between the two consecutive meter readings shall also be regarded as month for purpose of billing;\n(i) \"Premises\" includes any land, building, or structure.\n(j) \"Dedicated Distribution Facilities\" means such facility not including a service line, forming part of distribution system of the licensee which are clearly and solely dedicated to the supply of electricity to a single consumer or group of consumers on the same premises or on contiguous premises.\n(k) \"Authorised Representative\" refers to all officers, staff or representative of the Distribution licensee discharging function under general or specific authority of the licensee.\n(l) \"Contract Demand\" means demand in Kilowatt (KW) or Kilo Volt amperes (KVA) or H.P (Horse Power) mutually agreed between the Distribution Licensee and the consumer as entered into agreement or agreed through other written communication.\n(m) \"Occupier\" means the person in occupation of the premises where energy is used or is proposed to be used.\n(n) \"Consumer\" means any person who is supplied with electricity for his own use by a licensee or the Government or by any other person engaged in business of supplying electricity to the public under this Act or any other law for the time being in force and includes any person whose premises are for the time being connected for the purpose of receiving electricity with the works of a licensee, the Government or such other person, as the case may be;.\n(o) All other expression used herein but not specifically defined herein but defined in the Act shall have the meaning assigned to them in the Act.\n[(p) \"Assessing officer\" means an officer of a State Government or Board or licensee or supplier, as the case may be, designated as such by the State Government as per provisions of section 126 of the Act;\n(q) \"Authorized officer\" means an officer of the licensee or supplier as the case may be, authorized in this behalf by the State Government as per provisions of section 135 of the Act;\n(r) \"Appellate Authority\" means the authority prescribed under subsection (1) of section 127 of the Act.]\nChapter 3",
"footnote": "",
"is_definition": true,
"sort_order": 1
},
{
"number": "3",
"title": "3. Recovery of Charges.",
"chapter": null,
"content": "(a) Recovery of such expenses as may be reasonably incurred by the licensee in providing electric line or electrical plant used for giving such supply in accordance with Clause 17 of these Regulations below.\n(b) Charges for electricity supplied by licensee in accordance with the tariff order issued by the Commission.\n3.2 Cost of Service Connection/Extension/Upgradation.\n3.3 Charges of Electricity Supplied.\nChapter 4",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
{
"number": "4",
"title": "4. System of supply.",
"chapter": null,
"content": "(a) Low Tension\n(i) Single Phase: 230 volts between phases and neutral.\n(ii) Three Phase: 400 volts between phases.\n(b) High Tension (H.T) - Three Phase: 11KV or 33 KV between phases.\n(c) Extra High Tension (EHT)-Three Phase: 132 KV or 220 KV between phases.\n(d) For Railway Traction Two phase HT supply with 25 KV between phases and EHT supply with 132 KV supply between phases may be given.\nChapter 5",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "5",
"title": "5. Requisition for supply.",
"chapter": null,
"content": "5.1\n5.2\n(a) Name and address of the licensed Electrical contractor through whom the wiring/installation will be/have been carried out.\n(b) Purpose of usages of electricity and load for each such usage.\n(c) Whether application is for new connection, temporary connection, shifting of service, additional load, change of name or change of type (category) of service (tariff)\n(d) Whether the applicant wants to carry out the works of laying service line and / or dedicated distribution facility for the electricity supply requisitioned.\n5.3\n(a) Two photographs affixed one each in the duplicate copies of the application form\n(b) Proof of legal occupancy in the form of copies of sale deed or partition deed or succession certificate or power of attorney or lease/ rent agreement or allotment order or in case of agricultural connection \"Khata nakal\" giving khesar no.\n(c) In case of a partnership firm, partnership deed, authorization in the name of the applicant for signing the requisition form and agreement.\n(d) In case of Public and/or Private limited Company, Memorandum and Articles of Association and Certificate of incorporation together, with an authorization in the name of the applicant for signing the requisition form and agreement.\n5.4\n5.5\n5.6\n(a) Having distinct set up and staff, or\n(b) Owned or leased by different persons, or\n(c) Covered by different licensee or registrations under any law where such procedures are applicable, and\n(d) For domestic category households having relevant document from the local authorities, identifying the premises as separate, will be deemed to be separate establishments and each separate establishment will be given separate point of supply.\nChapter 6",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
{
"number": "6",
"title": "6. Procedure for providing fresh Electricity Service Connection.",
"chapter": null,
"content": "(i) Issue a duly authorized acknowledgement of each application form accepted.\n(ii) Inform an applicant upon request of the status of his application and the reasons if any, for non-disposal of the application.\n6.2 Processing Application and effecting Electricity supply.\nTime schedule for disposal of application for fresh electricity supply or additional supply.\nTime schedule for disposal of application for fresh electricity supply or additional supply.\nSl.No.\nSl.No.\nItem of Disposal\nItem of Disposal\nCategory of service\nCategory of service\nTime limit for disposal\nTime limit for disposal\n1\nNotice of inspection on receipt of application.\n(a) L.T service\nWithin 3 days of receipt of application.\n(b) H.T service\nWithin 7 days of receipt of application.\n(c) E.H.T service\nWithin 15 days of receipt of application.\n2\nInspection for fixing position of distribution\n\t\t\t\tline/service line and meter and accessories in consumer premises.\n(a) L.T service\nUrban\nWithin 10 days of receipt of application.\nRural\nWithin 15 days of receipt of application.\n(b) H.T service\nWithin 15 days of receipt of application.\n(c) E.H.T service\nWithin 30 days of receipt of application.\n3\nIssue of 15 days notice for deposit of charges\n\t\t\t\tand security amount and execution of agreement.\n(a) LT service without extension &\n\t\t\t\tupgradation\nWithin 3 days after inspection\n(b) LT service with LT extension &\n\t\t\t\tinstallation of D/S/S and or upgradation.\nWithin 7 days after inspection\n(c) L.T. service with extension &\n\t\t\t\tinstallation of D/S/S and /or upgradation of system.\nWithin 15 days after inspection\n(d) H.T. service\nWithin 30 days after inspection\n(e) E.H.T service\nWithin 45 days after inspection\n4\nTime allowed for deposit of charges and security\n\t\t\t\tamount and execution of agreement.\nAll categories L.T, H.T and EHT.\nWithin 15 days of issue of notice.\n5\nNotice for intimation that supply is available\n\t\t\t\tand testing consumer for installation.\n(a) L.T. service\n\t\t\t\twithout Ext. and upgradation.\n(i) Urban\nWithin 7 days of deposit of charges\n(ii) Rural\nWithin 15days of deposit of charges\n(b) L.T service with L.T line EXT only\n(i) Urban\n30 days of deposit of charges\n(ii) Rural\n45 days of deposit of charges\n(c) L.T Service with L.T extension installation\n\t\t\t\tof and Dist Sub-station and/or upgradation.\n(i) Urban\n45 days of deposit of charges\n(ii) Rural\n60 days of deposit of charges\n(d) HT without Extension\nWithin 27 days of deposit of charges.\n(e) HT with Extension\nWithin 90 days of deposit of charges.\n(f) EHT (this will necessarily entail Extension)\nWithin 180 days\n6\nEnergization and commencement of electricity\n\t\t\t\tsupply.\nL.T. service\nWithin 2 days after testing\nHT service Within\n3 days after testing\nEHT service Within\n3 days after testing\n[ Note - The time for providing new connection which does not require any extension should be limited to 30 days from the receipt of application.]\nNote\n6.3 Temporary supply.\n(a)\nPremises/site inspection and issue of notice to\n\t\t\t\tdeposit charges in advance.\nLT service within 7 days of receipt of\n\t\t\t\tapplication. H.T service within 15 days of receipt of application\n(b)\nMaximum time allowed to the applicant to deposit\n\t\t\t\tcharges.\nLT service 7 days from the date of notice. HT\n\t\t\t\tservice 15 days from the date of notice.\n(c)\nCarrying out works, testing of installation and\n\t\t\t\teffecting electricity supply.\nLT without extension within 7 days of deposit\n\t\t\t\tof charges. LT with extension within 15 days of deposit of\n\t\t\t\tcharges. HT without extension within 15 days of deposit of\n\t\t\t\tcharges HT with extension within 30 days of deposit of charges.\nChapter 7",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
{
"number": "7",
"title": "7. Agreement.",
"chapter": null,
"content": "7.1\n7.2\n7.3\n(i) Name and address of the consumer/ applicant.\n(ii) Address of the premises for which electricity supply has been requisioned and for which the agreement is being executed.\n(iii) Sanctioned load/ contract demand.\n(iv) Purpose of usage of electricity.\n(v) Declaration by the applicant/consumer.\n(a) To abide by provisions of Act and these Regulation.\n(b) To pay for the supply of electricity based on the prevailing tariff rates.\n(c) To pay for all other charges payable in accordance with these Regulations. and schedule of charges of the distribution licensee approved by the Commission.\n(d) To deposit such security money as the distribution licensee may be entitled to recover from him under the Act and these Regulations\n7.4\n7.5\nChapter 8",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
{
"number": "8",
"title": "8. Change of Name.",
"chapter": null,
"content": "8.2\n(i) Consent letter of the transferor for transfer of connection in the name of transferee. In the absence of consent letter any one of the following documents in respect of premises- (a) proof of ownership of premises (b) in case of partition, partition deed. (c) registered deed (d) succession certificate.\n(ii) Photocopy of license/permission with respect, to the purpose for which electricity is being supplied in the premises if applicable.\n(iii) Application fee and charges for the change of name as required under the schedule of charges of the Distribution Licensee approved by the commission.\n8.3\nChapter 9",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
{
"number": "9",
"title": "9. Enhancement and Reduction of Contract Demand/Sanctioned Load.",
"chapter": null,
"content": "9.2 Reduction of Contract Demand/Sanctioned Load.\n(i) Details of modification, alteration and removal of electrical installation with completion certificate and test report of the Licensed Electrical contractor.\n(ii) Any other reason for reduction of load\n(iii) Details of generator if any installed by the consumer with safety clearance certificate form competent authority as applicable.\n9.3 Change of Service (Tariff) Category, Shifting of Service Connection.\nChapter 10",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
{
"number": "10",
"title": "10. Security Deposit.",
"chapter": null,
"content": "10.2\n10.3\n10.4\n10.5\n10.6\n10.7\nChapter 11",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
{
"number": "11",
"title": "11. Electricity Billing.",
"chapter": null,
"content": "11.2 Billing in absence of meter reading.\n11.3 Billing in the event of Defective meters.\n11.4 Change of Occupancy/ Vacancy of Premises.\n11.5 The following information shall be included in the bill.\n(b) Bill Number.\n(c) Consumer No. , name and address.\n(d) Name of the sub-division / section.\n(e) Tariff/Category of consumer (i.e. domestic /commercial etc.).\n(f) Status of meter OK/defective/not available.\n(g) (i) Type supply (i.e. single phase, three-phase LT or HT).\n(ii) Contracted load/ Connected load.\n(h) Meter No. - in case replacement of energy meter is involved during the billing period, the meter number of old and the new meters, date of replacement, final reading of old meter and initial reading of new meter at the time of replacement of the meter shall also be indicated on the bill.\n(i) Billing period (dates to be mentioned).\n(j) Initial meter reading with date.\n(k) Final meter reading with date.\n(l) Multiplying Factor of the meter if any.\n(m) Units consumed.\n(n) Date of the bill and due date of payment.\n(o) Billing details: - The item wise details for the current month demand and arrears shall be furnished in the bill. A representative list is given below:\n(1) Energy / Monthly Minimum Charges.\n(2) Fixed Charges.\n(3) Capacitor surcharges\n(4) Other Charges if any\n(5) Electricity Duty\n(6) Fuel Cost adjustment charges\n(7) Surcharge for low power factor\n(8) Surcharge for delay.\n(9) Interest on installments due\n(10) Total current month demand Arrears - With details.\n(11) Others (With details)\n(12) Total amount due\n(13) Adjustment\n(14) Net amount\n(p) Mode of payment with details of collection centre including working hours.\n(q) Designation addresses and telephone no. of authorities with whom complaints or grievances can be lodged and address and telephone numbers of the Forum and Electricity Ombudsman constituted under Section 42 of the Act.\n(r) In case of cheques and bank drafts, the receiving authority in whose favour the amount should be drawn.\n11.6 Payment of Electricity Bill.\n11.7 Additional Charges for Belated Payment of bills.\n11.8 Adjustment of the Amount of paid by the Consumer.\n(1) Against arrears.\n(2) Against Delay payment surcharge.\n(3) Against current month charges\n11.9 Installment facility.\n11.10 Erroneous/Disputed Bills.\n(a) An amount equal to the sum claimed from him, or\n(b) The electricity charges due from him for each month calculated on the basis of average of amount for electricity paid by him during the preceding six months, whichever is less, pending disposal of any dispute raised by the consumer on the bills.\n11.11 Disconnection of Service.\nChapter 12",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
{
"number": "12",
"title": "12. Restoration of supply of electricity.",
"chapter": null,
"content": "Chapter 13",
"footnote": "",
"is_definition": false,
"sort_order": 11
},
{
"number": "13",
"title": "13. Meters.",
"chapter": null,
"content": "13.3 Lost, Burnt or Defective and Inoperative Meter.\n13.4 Testing and Maintenance of Meter.\nChapter 14",
"footnote": "",
"is_definition": false,
"sort_order": 12
},
{
"number": "14",
"title": "14. Right of licensee to enter consumer premises and to remove fittings or other apparatus of licensee.",
"chapter": null,
"content": "(a) Inspecting, testing, repairing or altering the electric supply-lines, meters, fittings, works and apparatus for the supply of electricity belonging to the licensee; or\n(b) Ascertaining the amount of electricity supplied or the electrical quantity contained in the supply; or\n(c) Removing any electric supply-lines, meters, fitting, works or apparatus belonging to the licensee where a supply of electricity is no longer required, or the licensee is authorized to take away and cut off such supply.\n14.2\n(a) Any premises or land referred to in Clause 14.1 for any of the purposes mentioned therein, or\n(b) Any premises to which electricity is to be supplied by him, for the purpose of examining and testing the electric wires fittings, works and apparatus for the use of electricity belonging to the consumer.\n14.3\n14.4\n(a) Enter, inspect break open and search any place or premises in which he has to believe that electricity has been, is being, or is likely to be, used unauthorizedly;\n(b) Search, seize and remove all such devices, instrument, wires and any other facilitator or article which has been, is being, or is likely to be, used for unauthorized use of electricity;\n(c) Examine or seize any books of account or documents which in his opinion shall be useful for or relevant to , any proceedings in respect or the offence under sub-section (1) and allow the person from whose custody such books of account or documents are seized to make copies thereof or take extracts there from in his presence.\n14.5\nChapter 15",
"footnote": "",
"is_definition": false,
"sort_order": 13
},
{
"number": "15",
"title": "15. Tampering, distress or damage to electrical plant, lines or meter.",
"chapter": null,
"content": "15.2\n15.3\n15.4\n15.5\n15.6\n15.7 Method for assessment of electricity charges in case of Unauthorized Use of Electricity (UUE)\n(ii) Unauthorised use of electricity shall be as defined in 'Explanation (b) 'under section 126 of the Electricity Act 2003, reproduced as under:\n(b) \"unauthorised use of electricity \" means the usage of electricity-\n(i) by any artificial means; or\n(ii) by a means not authorised by the concerned person or authority or licensee; or\n(iii) through a tampered meter; or\n(iv) for the purpose other than for which the usage of electricity was authorised; or\n(v) for the premises or areas other than those for which the supply of electricity was authorized.\n(iii) Exemption: Following activities shall not be considered as unauthorized use of electricity:\n(a) Where a consumer is billed on demand basis but the connected load exceeds the sanctioned load. In such cases one month notice is to be served by the Licensee indicating additional load to be regularised by the consumer.\n(b) Use of supply for a religious, social function or any other non-commercial activity by the consumer himself, not exceeding three days, in his own or adjoining premises, provided total operating load does not exceed the sanctioned load of the consumer.\nProcedure for booking a case of Unauthorized Use of Electricity\n(iv) The Licensee shall publish the list of Assessing officers, prominently in all the Offices and the Photo Identity Card issued to such officers shall indicate so.\n(v) An Assessing officer, suo motu or on receipt of reliable information regarding unauthorized use of electricity shall promptly conduct inspection of such premises and shall be present at the time of conducting inspection of such premises.\n(vi) The inspection team of the Licensee, headed by such Assessing officer shall carry along with them their Visiting Cards and Photo Identity Cards. Photo Identity Card should be shown and Visiting Card handed over to the consumer before entering the premises.\n(vii) The Assessing officer shall prepare a report giving details such as connected load, condition of seals, working of meter and mention any irregularity noticed (such as, artificial means adopted for unauthorized use of electricity).\n(viii) The report shall clearly indicate whether sufficient evidence substantiating the fact that unauthorized use of electricity was found or not. The details of such evidence should be recorded in the report and the material utilised for the purpose shall be kept as a proof.\n(ix) The report shall be signed by the Assessing officer, each member of the inspection team and by the consumer, if the consumer fails to sign the report then the same has to be recorded in the inspection report and the report must be handed over to the consumer or his/her representative at site immediately under proper receipt. In case of refusal by the consumer or his/her representative to either accept or give a receipt, a copy of inspection report shall be pasted at a conspicuous place in/outside the premises and photographed. Simultaneously, the report shall be sent to the consumer under Registered Post/Speed post on the day or the next day of the inspection.\n(x) Within three working days of the date of inspection, the Assessing officer shall, analyze the case after carefully considering all the evidence including the consumption pattern, wherever available and the report of inspection. If it is concluded that no unauthorized use of electricity has taken place, no further action will be taken.\nNotice to consumer\n(xi) If the Assessing officer as per clause 15.7 (x) suspects that the unauthorized use of electricity has taken place, he shall serve a provisional assessment order assessed as per clause 15.7 (xx) and (xxi) of these Regulations alongwith show cause notice to the consumer, giving reasons as to why a case of unauthorized use of electricity should not be booked against such consumer. The show cause notice should clearly state the time, date and place at which the reply has to be submitted and the designation of the person to whom it should be addressed.\n(xii) The person, on whom an order has been served under clause 15.7 (xi) of these Regulations shall be entitled to file objections, if any, against the provisional assessment before the Assessing officer, who shall, after affording a reasonable opportunity of hearing to such person, pass a final order of assessment.\n(xiii) If the provisional assessment amount is deposited within seven days of the service of such provisional assessment order on the consumer, the reply to the notice shall not be necessary.\nConsumer's reply submission\n(xiv) The consumer shall submit his/ her reply within fifteen days of receipt of show cause notice to the concerned officer mentioned in clause 15.7 (xi) of these Regulations.\n(xv) In such cases where the consumer files objections against the provisional assessment order, the process of hearing shall be as per clause 15.7 (xvi) and\n(xvii) of these Regulations.\nHearing\n(xvi) Within five days from the date of submission of consumers' reply, the Licensee shall arrange a hearing with the consumer.\n(xvii) During the hearing, the Assessing officer shall give due consideration to the facts submitted by the consumer and pass, within five working days, a speaking order as to whether the case of unauthorized use of electricity is established or not. The order shall contain the brief of inspection report, submissions made by consumer in his written reply and oral submissions during hearing and reasons for acceptance or rejections of the same.\nAssessment\n(xviii) In cases where unauthorized use of electricity is not established based on consumer's reply submission / hearing, further proceedings shall be discontinued and case of unauthorized use of electricity shall be dropped immediately.\n(xix) Where it is established that there is a case of unauthorized use of electricity based on consumer's reply submission/ hearing , the Assessing officer shall assess the energy consumption taking into consideration the following:\n(xx) The Assessing officer shall assess the energy consumption considering the following:\n(a) Period of assessment: If the Assessing officer reaches to the conclusion that unauthorised use of electricity has taken place, the assessment shall be made for the entire period during which such unauthorized use of electricity has taken place and if, however, the period during which such unauthorised use of electricity has taken place cannot be ascertained, such period shall be limited to a period of twelve (12) months immediately preceding the date of inspection.\n(b) Assessment charge: The assessment for the units assessed as per clause 15.7 (xxi) of these Regulations shall be made at a rate equal to twice (2 times) the tariff rates applicable for the consumer as per the latest Tariff order, excluding the consumption recorded by the meter or already billed during the assessment period at applicable tariffs.\n(c) If a consumer is found indulging in more than one act of unauthorized use of electricity, the charges payable by the consumer in respect of each such unauthorized use shall be separately assessed and billed accordingly.\n(xxi) The methodology for assessment of consumption for unauthorized use of electricity shall be as follows:\n= (Average Monthly consumption for the Period of assessment (units)) x (Period of assessment (in months or fraction thereof), assessed as per clause 15.7 (xx) (a) of these Regulations)\n(xxii) The final assessment order shall be served on the consumer under proper receipt. The consumer shall be required to make the payment within seven days of its proper receipt. A copy of the speaking order shall also be handed over to the consumer under proper receipt.\n(xxiii) The order of final assessment shall be served upon the person in occupation or possession or in charge of the place or premises in such manner as prescribed by the State Government under section 126(2) of the Act.\n(xxiv) Any person served with the order of final assessment, may, accept such assessment and deposit the assessed amount with the Licensee within seven days of service of assessment order upon him.\n(xxv) In case of non-payment of bill amount within seven days of serving the final assessment order, the connection will be disconnected by serving a fifteen days notice, which will not be reconnected until the assessed amount is deposited. In case of non-payment, the amount will be shown as arrear in the regular bill.\n(xxvi) When a person defaults in making payment of assessed amount, he, in addition to the assessed amount shall be liable to pay, on the expiry of thirty days from the date of order of assessment, an amount of interest at the rate of sixteen per cent, per annum compounded every six months.\n(xxvii) Appeal to Appellate Authority: Any person aggrieved by the final order served by the Assessing officer may, within 30 days of the said order, prefer an appeal in such form, verified in such manner and be accompanied by such fee as specified by the Commission in the Jharkhand State Electricity Regulatory Commission (miscellaneous provision) Order, 2003 and subsequent amendments, to an Appellate Authority.\n(xxviii) No appeal against an order of assessment under section (xxvii) above shall be entertained unless an amount equal to half of the assessed amount is deposited in cash or by way of bank draft with the licensee and documentary evidence of such deposit has been enclosed along with the appeal.\n(xxix) The Appellate Authority will dispose of the appeal after hearing the parties and pass appropriate order and send copy of the order to the Assessing officer and the appellant. The order of the Appellate Authority shall be final and shall not be appeal-able\n(xxx) The consumer will be served with a revised bill as per final order of the Appellate Authority to be paid in seven days.\n(xxxi) If a consumer defaults in making the payment within seven days of serving the final order of the Appellate Authority, the connection will be disconnected after serving a fifteen days notice which will not be reconnected until the bill amount is cleared. In case of non-payment, the amount will be indicated as arrear in regular bill and action will be taken for recovery.\n(xxxii) An interest of 16% per annum will be charged on the amount as per final order of the Appellate Authority after thirty days from the date of final order, compounded every six months as per section 127(6) of the Act.]\n15.8 Method for assessment of electricity charges in case of theft of electricity.\nProcedure for booking a case of theft of electricity\n(ii) The Licensee or supplier shall publish the list of the Authorized officers prominently in all the Offices and the Photo Identity Card issued to such officers shall indicate so.\n(iii) An Authorized officer, suo motu or on receipt of reliable information regarding theft of electricity shall promptly conduct inspection of such premises.\n(iv) The inspection team of the Licensee or supplier, headed by such Authorised officer shall carry along with them their Visiting Cards and Photo Identity Cards. Photo Identity Card should be shown and Visiting Card handed over to the consumer before entering the premises. Photo Identity Card of the Authorised Officer shall clearly indicate that he has been nominated as Authorized officer as per provisions of Section 135 of the Act.\n(v) The Authorised officer shall prepare a report giving details such as connected load, condition of meter seals, working of meter and mention any irregularity noticed (such as tampered meter, artificial means adopted for theft of energy).\n(vi) The report shall clearly indicate whether sufficient evidence substantiating the fact that theft of energy was found or not. The details of such evidence should be recorded in the report.\n(vii) No case for theft shall be booked only on account of seals on the meter missing or tampered or breakage of glass window, unless corroborated by consumption pattern of consumer and such other evidence as may be available.\n(viii) In case sufficient evidence is found to establish direct theft of electricity, Licensee or Supplier as per Section 135 sub-clause (1A) of the Act shall disconnect the supply and seize all material evidence including wires/cables, meter, service line etc., from the premises and shall lodge a complaint in writing relating to the commission of such offence in police station having jurisdiction within twenty four hours from the time of such disconnection. The Authorized officer of the Licensee or Supplier shall within two days from date of inspection, file a case against the consumer in designated Special Court as per the provisions of Section 135 of the Act. Copy of filing shall be served on the consumer under proper receipt within two days of such filing.\n(ix) The Authorized officer shall assess the energy consumption as per the assessment formula given in ANNEXURE-I to these Regulations, for the entire period during which such theft of electricity has taken place and if, however, the period during which such theft of electricity has taken place can not be ascertained, such period shall be limited to 12 (twelve) months immediately preceding the date of inspection and prepare assessment order on twice (2) the rates as per applicable tariff and serve on the person under proper receipt.\n(x) In case of suspected theft, the Authorised officer shall remove the old meter under a seizure memo and seal it in the presence of the consumer/ his representative and the Authorised officer and the consumer have to sign on the seal borne on the meter. The Licensee or supplier shall continue the supply to the consumer with a new meter. The old meter shall be tested in the presence of the consumer and the Authorised officer at a third party facility approved by the Commission which shall give a test report, in writing, which alongwith photographs/ videographs shall constitute evidence thereof. The Authorised officer shall record reasons to suspect theft in the premises in his report.\n(xi) The report shall be signed by the Authorized officer and each member of the inspection team and the same must be handed over to the consumer or his/her representative at site immediately under proper receipt. In case of refusal by the consumer or his/her representative to either accept or give a receipt, a copy of inspection report must be pasted at a conspicuous place in/outside the premises and photographed. Simultaneously, the report shall be sent to the consumer under Registered Post/Speed Post on the day or the next day of the inspection.\n(xii) After detailed examination of the evidence and the consumption pattern of the consumer, if the Licensee or supplier is convinced that a prima-facie case is made out for the abstraction, consumption or use of electricity dishonestly against the consumer, the Licensee or supplier shall, within seven days of inspection, serve a provisional assessment order assessed as per clause 15.8\n(xxi) of these Regulations alongwith show cause notice to the consumer,giving reasons, as to why a case of theft should not be booked against such consumer giving full details for arriving at such decision and points on which reply has to be submitted. The notice should clearly state the time, date and place at which the reply has to be submitted and the designation of the person to whom it should be addressed.\n(xiii) Incase show cause notice is not served even after thirty days from date of inspection by the Licensee or supplier, the case of suspected theft shall be considered as dropped and no further action can be initiated against the consumer.\n(xiv) Theft shall not be limited to physical interference with the meter found during physical inspection. It shall also include theft committed by resorting to external methods such as remote control/ high voltage injection etc. which interfere with the accurate registration of energy consumed. Theft of electricity may be established by analysis of metering data down-loaded by a third party facility approved by the Commission. In case theft of energy is determined by way of meter down load, the provisional assessment order assessed as per clause 15.8 (xxi) of these Regulations alongwith show cause notice will be sent to the consumer/user. The notice should clearly state the time, date and place at which the reply has to be submitted and the designation of the person to whom it should be addressed.\n(xv) The person, on whom an order has been served under clause 15.8 (xii) and\n(xiv) of these Regulations shall be entitled to file objections, if any, against the provisional assessment before the Authorized officer, who shall, after affording a reasonable opportunity of hearing to such person, pass a final order of assessment.\nConsumer's reply submission\n(xvi) The consumer shall submit his/ her reply within fifteen days of receipt of show cause notice to the concerned officer mentioned in clause 15.8 (xii) and (xiv) of these Regulations.\n(xvii) In such cases where the consumer files objections against the provisional assessment order, the process of hearing shall be as per clause 15.8 (xviii) and\n(xix) of these Regulations.\nHearing in case of suspected theft\n(xviii) Within five days from the date of submission of consumers' reply, the Licensee or supplier shall arrange a hearing with the consumer. The consumer may be given another opportunity in case he fails to appear for the hearing. In case, the consumer fails to appear for the second time, the Licensee may proceed against the consumer.\n(xix) During the hearing, the Authorized officer shall give due consideration to the facts submitted by the consumer and pass, within five working days, a speaking order as to whether the case of theft is established or not. The order shall contain the brief of inspection report, submissions made by consumer in his written reply and oral submissions during hearing and reasons for acceptance or rejections of the same.\nAssessment\n(xx) In case of the decision based on the consumer's reply / hearing wherein the case of theft is not established, no further proceedings shall be required and electricity connection shall be restored through original meter.\n(xxi) Where it is established that there is a case of theft of energy based on the consumer's reply / hearing, the Authorized officer shall assess the energy consumption as per the assessment formula given in ANNEXURE-I to these Regulations, for the entire period during which such theft of electricity has taken place and if, however, the period during which such theft of electricity has taken place can not be ascertained, such period shall be limited to 12 (twelve) months immediately preceding the date of inspection and prepare assessment order on twice (2) the rates as per applicable tariff and serve on the person under proper receipt.\n(xxii) The consumer shall be required to make the payment within seven days of its proper receipt.\n(xxiii) The Licensee or supplier, as the case may be, on deposit or payment of the assessed amount or electricity charges in accordance with the provision of these regulations, shall, without prejudice to the obligation to lodge the complaint as referred to in the second proviso to the clause 13(A) (1A) of the Electricity (Amendment) Act, 2007, restore the supply line of electricity within forty eight hours of such deposit or payment.\n(xxiv) If the person does not make payment within the stipulated time, the Licensee or supplier shall proceed to recover its dues against the assessment order.\n(xxv) In all cases where theft of electricity has been detected, the Licensee or supplier shall file the case with Appropriate Court for decision in the matter unless the offence is compounded under Section 152 of the Act.\n(xxvi) In case of default by the person in payment of assessed amount, the person, in addition to the assessed amount, shall be liable to pay, on expiry of thirty days from the date of order of assessment, an amount of interest at the rate of sixteen per cent per annum compounded every six months pending adjudication by Appropriate Court.]\nChapter 16",
"footnote": "",
"is_definition": false,
"sort_order": 14
},
{
"number": "16",
"title": "16. Wiring of Consumer Premises.",
"chapter": null,
"content": "Chapter 17",
"footnote": "",
"is_definition": false,
"sort_order": 15
},
{
"number": "17",
"title": "17. Schedule of Charges.",
"chapter": null,
"content": "17.2\n17.3\nChapter 18",
"footnote": "",
"is_definition": false,
"sort_order": 16
},
{
"number": "18",
"title": "18. Service of Notice.",
"chapter": null,
"content": "(a) Sent by registered post, under certificate of posting, by courier, or other similar means, or\n(b) Delivered by hand to the person residing at the address notified to the licensee by the consumer, or\n(c) Affixed at a conspicuous part of such premises in case there is no person, to whom the same can with reasonable diligence, be delivered.\nChapter 19",
"footnote": "",
"is_definition": false,
"sort_order": 17
},
{
"number": "19",
"title": "19. Information to Consumers.",
"chapter": null,
"content": "(a) The Electricity Supply Code Regulations.\n(b) Standards of Performance of Distribution Licensee.\n(c) Tariff and schedule of charges approved by the Commission.\n(d) Application Forms for connection, reconnection, etc.\n(e) Consumer complaints handling rules and procedures of the Distribution Licensee.\n(f) Safety rules and precautions.\n(i) To each applicant for new connection along with the application form\n(ii) To the consumer upon request upon payment of reasonable price approved by the Commission.\n(iii) By making of available on website of the licensee in downloadable format.\nChapter 20",
"footnote": "",
"is_definition": false,
"sort_order": 18
},
{
"number": "20",
"title": "20. Saving & Interpretation.",
"chapter": null,
"content": "Chapter 21",
"footnote": "",
"is_definition": true,
"sort_order": 19
},
{
"number": "21",
"title": "21. Powers to remove difficulties.",
"chapter": null,
"content": "Power to amend:-\n[ANNEXURE-I ]\n[ANNEXURE-I\nAssessment of energy in cases of theft\n1.1 The assessment formula for calculation of the consumption due to theft of electricity shall be as under:-\nUnits assessed = L x D x H x F\nS. No.\nS. No.\nParticulars\nParticulars\nLoad factor (%)\nLoad factor (%)\n1\nHT (including load above 75 kW for non domestic\n\t\t\t\tand above107 HP or 100 kVA for industries on LT)\n100.00%\n2\nLT Industrial(107 HP or 100 kVA)\n75.00%\n3\nNon- domestic (upto 75kW)\n50.00%\n4\nDomestic (upto 75 kW)\n40.00%\n5\nDomestic HT (including load above 75kW on LT)\n40.00%\n6\nAgriculture\n50.00%\n7\nWater supply\n50.00%\n8\nStreet light\n50.00%\n9\nDirect theft - All categories\n100.00%\nAssessment of energy in case of temporary connection\n1.2 In the case of temporary connection, the assessment of units consumed for theft of electricity shall be done as under:\nUnits assessed = L x D x H",
"footnote": "",
"is_definition": false,
"sort_order": 20
}
],
"metadata": {
"Act ID": "jhr246",
"Act Number": "Published vide Notification No. JSERC/Regulation/64/268, dated 28.07.2005",
"Enactment Date": "",
"Act Year": "2005",
"Short Title": "Jharkhand State Electricity Regulatory Commission (Electricity Supply Code) Regulations 2005",
"Type": "STATE",
"Location": "Jharkhand"
},
"updated_at": "2026-09-29 21:55:19"
}