integrated operation of the power system in a State.
(2) The State Load Despatch Centre shall -
(a) be responsible for optimum scheduling and despatch of electricity
within a State, in accordance with the contracts entered into with the licensees or
the generating companies operating in that State;
(b) monitor grid operations;
(c) keep accounts of the quantity of electricity transmitted through
the State grid;
(d) exercise supervision and control over the intra-state transmission
system; and
(e) be responsible for carrying out real time operations for grid
control and despatch of electricity within the State through secure and economic
operation of the State grid in accordance with the Grid Standards and the State Grid
Code.
(3) The State Load Despatch Centre may levy and collect such fee
and charges from the generating companies and licensees engaged in intra-State
transmission of electricity as may be specified by the State Commission.
33
. (1) The State Load Despatch Centre in a State may give such
directions and exercise such supervision and control as may be required for
ensuring the integrated grid operations and for achieving the maximum economy
and efficiency in the operation of power system in that State.
(2) Every licensee, generating company, generating station, sub-
station and any other person connected with the operation of the power system shall
comply with the direction issued by the State Load Depatch Centre under sub-
section (1).
(3) The State Load Despatch Centre shall comply with the directions
of the Regional Load Despatch Centre.
(4) If any dispute arises with reference to the quality of electricity or
safe, secure and integrated operation of the State grid or in relation to any direction
given under sub-section (1) , it shall be referred to the State Commission for
decision:
Provided that pending the decision of the State Commission, the direction
of the State Load Despatch Centre shall be complied with by the licensee or
generating company.
(5) If any licensee, generating company or any other person fails to
comply with the directions issued under sub-section(1), he shall be liable to
penalty not exceeding rupees five lacs.
21
Grid Standards
Intervening
transmission
facilities.
Charges for
intervening
transmission
facilities.
Direction by
appropriate
Government.
Central
Transmission
Utility and
functions.
1 of 1956
Other provisions relating to transmission
Section 32 • The Electricity Act 2003
Section 32. (1) The State Load Despatch Centre shall be the apex body to ensure
electricity-act-2003-sec-32.json
•
Section 32
{
"act_title": "The Electricity Act 2003",
"act_slug": "electricity-act-2003",
"section_label": "Section",
"section": {
"number": "32",
"title": "Section 32. (1) The State Load Despatch Centre shall be the apex body to ensure",
"chapter": null,
"content": "integrated operation of the power system in a State. \n \n(2) The State Load Despatch Centre shall - \n \n (a) be responsible for optimum scheduling and despatch of electricity \nwithin a State, in accordance with the contracts entered into with the licensees or \nthe generating companies operating in that State; \n \n (b) monitor grid operations; \n \n (c) keep accounts of the quantity of electricity transmitted through \nthe State grid; \n \n (d) exercise supervision and control over the intra-state transmission \nsystem; and \n \n (e) be responsible for carrying out real time operations for grid \ncontrol and despatch of electricity within the State through secure and economic \noperation of the State grid in accordance with the Grid Standards and the State Grid \nCode. \n \n (3) The State Load Despatch Centre may levy and collect such fee \nand charges from the generating companies and licensees engaged in intra-State \ntransmission of electricity as may be specified by the State Commission. \n \n33\n. (1) The State Load Despatch Centre in a State may give such \ndirections and exercise such supervision and control as may be required for \nensuring the integrated grid operations and for achieving the maximum economy \nand efficiency in the operation of power system in that State. \n \n(2) Every licensee, generating company, generating station, sub-\nstation and any other person connected with the operation of the power system shall \ncomply with the direction issued by the State Load Depatch Centre under sub-\nsection (1). \n \n (3) The State Load Despatch Centre shall comply with the directions \nof the Regional Load Despatch Centre. \n \n (4) If any dispute arises with reference to the quality of electricity or \nsafe, secure and integrated operation of the State grid or in relation to any direction \ngiven under sub-section (1) , it shall be referred to the State Commission for \ndecision: \n \n \nProvided that pending the decision of the State Commission, the direction \nof the State Load Despatch Centre shall be complied with by the licensee or \ngenerating company. \n \n (5) If any licensee, generating company or any other person fails to \ncomply with the directions issued under sub-section(1), he shall be liable to \npenalty not exceeding rupees five lacs. \n \n\n \n \n \n21 \n \n \n \n \nGrid Standards \n \n \n \n \nIntervening \ntransmission \nfacilities. \n \n \n \n \n \n \n \n \nCharges for \nintervening \ntransmission \nfacilities. \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \nDirection by \nappropriate \nGovernment. \n \n \n \nCentral \nTransmission \nUtility and \nfunctions. \n \n \n \n \n \n 1 of 1956 \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \nOther provisions relating to transmission",
"footnote": "",
"is_definition": false,
"sort_order": 41
},
"prev_section": "31",
"next_section": "34"
}