    "act_title": "The Electricity Act 2003",
    "act_slug": "electricity-act-2003",
    "section_label": "Section",
    "section": {
        "number": "32",
        "title": "Section 32. (1)   The State Load Despatch Centre shall be the apex body to ensure",
        "chapter": null,
        "content": "integrated operation of the power system in a State. \n \n(2) The State Load Despatch Centre shall - \n \n (a) be responsible for optimum scheduling and despatch of electricity \nwithin a State, in accordance with the contracts entered into with the licensees or \nthe generating companies operating in that State;  \n \n (b) monitor grid operations; \n \n (c) keep  accounts of the  quantity of electricity transmitted through  \nthe State grid;  \n \n (d) exercise supervision and control over the intra-state transmission \nsystem;  and \n \n (e) be responsible for carrying out real time operations for grid \ncontrol and despatch of electricity within the State through secure and economic \noperation of the State grid in accordance with the Grid Standards and the State Grid \nCode.  \n \n (3)  The State Load Despatch Centre may levy and collect such fee \nand charges from the generating companies and  licensees engaged in intra-State \ntransmission of electricity as may be specified by the State Commission. \n \n33\n.  (1)  The State Load Despatch Centre in a State may give such \ndirections and exercise such supervision and control as  may be required for \nensuring the integrated grid operations and for achieving the maximum economy \nand efficiency in the operation of power system in that State. \n  \n(2) Every licensee,  generating company, generating station, sub-\nstation and any other person connected with the operation of the power system shall \ncomply with the direction issued by the State Load Depatch Centre under sub-\nsection (1).  \n \n (3) The State Load Despatch Centre  shall comply with the directions \nof the Regional Load Despatch Centre. \n  \n  (4)  If any dispute arises with reference to the quality of electricity or \nsafe, secure and integrated operation of the State grid or in relation to any direction \ngiven under sub-section (1) , it shall be referred to the  State Commission  for \ndecision:  \n \n          \nProvided that pending the decision of the State Commission, the direction  \nof the State  Load Despatch Centre shall be complied with by the licensee or \ngenerating  company. \n \n (5) If any licensee, generating  company or any other  person fails to \ncomply with the  directions  issued under sub-section(1),  he shall  be liable to \npenalty  not exceeding  rupees five lacs. \n \n\n \n \n \n21 \n \n \n \n \nGrid  Standards \n \n \n \n \nIntervening \ntransmission \nfacilities. \n \n \n \n \n \n \n \n \nCharges for \nintervening \ntransmission \nfacilities. \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \nDirection by \nappropriate \nGovernment. \n \n \n \nCentral \nTransmission \nUtility and \nfunctions.  \n \n \n \n  \n \n 1 of 1956 \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \n \nOther provisions relating to transmission",
        "footnote": "",
        "is_definition": false,
        "sort_order": 41
    },
    "prev_section": "31",
    "next_section": "34"
}