(a) Creating necessary transmission systems of strategic importance based on operational feedback by Load Despatch Centers for relieving congestion in inter-State transmission system and intra-State Systems which are incidental to the ISTS;
(b) Installation of shunt capacitors, series compensators and other reactive energy generators for improvement of voltage profile in the Grid;
(c) Installation of standard and special protection schemes, pilot and demonstrative projects and for setting right the discrepancies identified in the protection audits on regional basis;
(d) Renovation and Modernization of transmission and distribution systems for relieving congestion; and
(e) Any other project in furtherance of the above objectives such as conducting technical studies and capacity building.
Section 4 • Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2019
4. Utilization of the PSDF.
central-electricity-regulatory-commission-power-system-development-fund-regulations-2019-sec-4.json
•
Section 4
{
"act_title": "Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2019",
"act_slug": "central-electricity-regulatory-commission-power-system-development-fund-regulations-2019",
"section_label": "Section",
"section": {
"number": "4",
"title": "4. Utilization of the PSDF.",
"chapter": null,
"content": "(a) Creating necessary transmission systems of strategic importance based on operational feedback by Load Despatch Centers for relieving congestion in inter-State transmission system and intra-State Systems which are incidental to the ISTS;\n(b) Installation of shunt capacitors, series compensators and other reactive energy generators for improvement of voltage profile in the Grid;\n(c) Installation of standard and special protection schemes, pilot and demonstrative projects and for setting right the discrepancies identified in the protection audits on regional basis;\n(d) Renovation and Modernization of transmission and distribution systems for relieving congestion; and\n(e) Any other project in furtherance of the above objectives such as conducting technical studies and capacity building.",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
"prev_section": "3",
"next_section": "5"
}