← Back to Bihar Factories Rules, 1950

84. Exemption of certain adult workers.

(i) the total number of hours of work in any day shall not exceed ten;
(ii) the total number of hours of overtime work shall not exceed fifty in any one quarter;
(iii) the spread over, inclusive of intervals for rest, shall not exceed twelve hours in any one day.
(a) that this exemption shall apply only when the worker is not relieved at the end of the period of his work owing to failure of the reliever to report for duty at the appointed hours;
(b) that the total hours of overtime shall not exceed fifty in any one quarter.
Explanation.
Schedule
Sl. No.
Section of the Act empowering grant of
exemption.
Class of Factory.
Nature of exempted work.
Extent of exemption.
Remarks.
1
2
3
4
5
6
1.
64(2)(a) and 64 (3)
All factories
Urgent repairs,
Explanation. - (1) The following shall be considered to be urgent repairs:-
Explanation.
(a) Repairs to any
part of the machinery plant or structure of a factory which is
of such a nature that delay in the execution may involve danger
to human life or safety or stoppage of any manufacturing
process.
(b) Break-down
repair to motive power, transmission or other essential plants
or machinery or other factories, collieries, railways,
dock-yards and harbours, tramways, motor transport and steam
navigation services, gas generating stations, electric
generating station and transmission systems, pumping stations,
or similar essential or public utility services, carried out in
any general engineering work-shop or foundry which may be
essential to enable such concerns and services to maintain their
normal manufacturing processes, production operation or service.
(c) Repairs to ships
and aircrafts done in a factory which are essential to enable
such ships or aircrafts to leave port at proper time or to
continue their normal operations in a sea or air worthy
conditions as the case may be.
(d) Repairs in
connection with a change of motive power, for example, from
steam to electricity or vice versa, when such work cannot be
done without stoppage of the normal manufacturing process.
(e) Urgent repairs
to earth moving or other vita machinery or plants used in the
construction of dams and other works of engineering construction
carried out in an engineering works shop 0r foundry, provided
the work is of such a nature that if the repair is not carried
out, the main work of construction is liable to be held up.
(f) Break down repairs of Automobiles carried
out in an Automobile 01 Engineering Workship.
Sections, 51, 52, 54, 55, 56 and 61.
Within 24 hours of the commencement of work, a
notice shall be sent to the Inspector describing the nature of
the urgent repairs and the period likely to be required for its
completion. A copy of the same notice shall be displayed on the
Notice Board prior to the commencement of the urgent repair.
2.
64(2)(b) and 64 (2).
All factories other than those which work throughout the day
in a system of relays.
(i) Work in foundry
on operation of a cupola and steel furnaces and pouring of
metals and any other work connected or incidental thereto.
(ii) Work in
connection with the maintenance of mill gearing, electric
drives, mechanical oi electrical lifts, steam or water pipes and
pumps.
(iii) Work of
examining 01 repairing of any machinery or other plant which is
necessary for carrying or the work in the factory.
(iv) Work of lighting fire in Boiler Houses and
Engine Rooms, in order to raise steam, or generate gas,
preparatory to the commencement of regular work in the factory.
Sections 51,54, 55, 56 and 61.
As above serial no. 1.
3.
64(2)(b) and 64 (3).
Factories manufacturing explosives.
(i) Cartridging of
explosives.
(ii) Cleaning of plant
in the packing, mixing and ingredient preparation sections.
(iii) Packing of explosives.
Sections 51, 54, 55, 56 and 61.
4.
Ditto,
Factories manufacturing beverages;
Preparation and handling of syrup and other
ingredients and same materials, filing and cleaning of bottles
and other work incidental thereto.
Ditto.
...
5.
64 (2) (c) and 64 (3).
All factories other than those which work through the day in
a system of relays.
(i) Work of drivers and
attendant upon lighting, ventilating and humidifying plants.
(ii) Work of Fire Pump Men.
Sections 51, 54, 55 and 61.
...
6.
64(2) (c) and 64 (3).
Cold storage and refrigeration factories or for Cold storage
and regrigration plants attached with other factories.
Work of loading and
unloading and transports of articles.
Explanation . - The work of loading and
unloading includes work of and in connection with stocking of
articles fro preservation in the storage rooms and removal
therefrom besides, loading and unloading on transport vehicles.
Explanation