{
    "act_title": "Bihar Factories Rules, 1950",
    "act_slug": "bihar-factories-rules-1950",
    "section_label": "Section",
    "section": {
        "number": "84",
        "title": "84. Exemption of certain adult workers.",
        "chapter": null,
        "content": "(i) the total number of hours of work in any day shall not exceed ten;\n(ii) the total number of hours of overtime work shall not exceed fifty in any one quarter;\n(iii) the spread over, inclusive of intervals for rest, shall not exceed twelve hours in any one day.\n(a) that this exemption shall apply only when the worker is not relieved at the end of the period of his work owing to failure of the reliever to report for duty at the appointed hours;\n(b) that the total hours of overtime shall not exceed fifty in any one quarter.\nExplanation.\nSchedule\nSl. No.\nSection of the Act empowering grant of\n\t\t\t\t\texemption.\nClass of Factory.\nNature of exempted work.\nExtent of exemption.\nRemarks.\n1\n2\n3\n4\n5\n6\n1.\n64(2)(a) and 64 (3)\nAll factories\nUrgent repairs,\nExplanation. - (1) The following shall be considered to be urgent repairs:-\nExplanation.\n(a) Repairs to any\n\t\t\t\t\tpart of the machinery plant or structure of a factory which is\n\t\t\t\t\tof such a nature that delay in the execution may involve danger\n\t\t\t\t\tto human life or safety or stoppage of any manufacturing\n\t\t\t\t\tprocess.\n(b) Break-down\n\t\t\t\t\trepair to motive power, transmission or other essential plants\n\t\t\t\t\tor machinery or other factories, collieries, railways,\n\t\t\t\t\tdock-yards and harbours, tramways, motor transport and steam\n\t\t\t\t\tnavigation services, gas generating stations, electric\n\t\t\t\t\tgenerating station and transmission systems, pumping stations,\n\t\t\t\t\tor similar essential or public utility services, carried out in\n\t\t\t\t\tany general engineering work-shop or foundry which may be\n\t\t\t\t\tessential to enable such concerns and services to maintain their\n\t\t\t\t\tnormal manufacturing processes, production operation or service.\n(c) Repairs to ships\n\t\t\t\t\tand aircrafts done in a factory which are essential to enable\n\t\t\t\t\tsuch ships or aircrafts to leave port at proper time or to\n\t\t\t\t\tcontinue their normal operations in a sea or air worthy\n\t\t\t\t\tconditions as the case may be.\n(d) Repairs in\n\t\t\t\t\tconnection with a change of motive power, for example, from\n\t\t\t\t\tsteam to electricity or vice versa, when such work cannot be\n\t\t\t\t\tdone without stoppage of the normal manufacturing process.\n(e) Urgent repairs\n\t\t\t\t\tto earth moving or other vita machinery or plants used in the\n\t\t\t\t\tconstruction of dams and other works of engineering construction\n\t\t\t\t\tcarried out in an engineering works shop 0r foundry, provided\n\t\t\t\t\tthe work is of such a nature that if the repair is not carried\n\t\t\t\t\tout, the main work of construction is liable to be held up.\n(f) Break down repairs of Automobiles carried\n\t\t\t\t\tout in an Automobile 01 Engineering Workship.\nSections, 51, 52, 54, 55, 56 and 61.\nWithin 24 hours of the commencement of work, a\n\t\t\t\t\tnotice shall be sent to the Inspector describing the nature of\n\t\t\t\t\tthe urgent repairs and the period likely to be required for its\n\t\t\t\t\tcompletion. A copy of the same notice shall be displayed on the\n\t\t\t\t\tNotice Board prior to the commencement of the urgent repair.\n2.\n64(2)(b) and 64 (2).\nAll factories other than those which work throughout the day\n\t\t\t\t\tin a system of relays.\n(i) Work in foundry\n\t\t\t\t\ton operation of a cupola and steel furnaces and pouring of\n\t\t\t\t\tmetals and any other work connected or incidental thereto.\n(ii) Work in\n\t\t\t\t\tconnection with the maintenance of mill gearing, electric\n\t\t\t\t\tdrives, mechanical oi electrical lifts, steam or water pipes and\n\t\t\t\t\tpumps.\n(iii) Work of\n\t\t\t\t\texamining 01 repairing of any machinery or other plant which is\n\t\t\t\t\tnecessary for carrying or the work in the factory.\n(iv) Work of lighting fire in Boiler Houses and\n\t\t\t\t\tEngine Rooms, in order to raise steam, or generate gas,\n\t\t\t\t\tpreparatory to the commencement of regular work in the factory.\nSections 51,54, 55, 56 and 61.\nAs above serial no. 1.\n3.\n64(2)(b) and 64 (3).\nFactories manufacturing explosives.\n(i) Cartridging of\n\t\t\t\t\texplosives.\n(ii) Cleaning of plant\n\t\t\t\t\tin the packing, mixing and ingredient preparation sections.\n(iii) Packing of explosives.\nSections 51, 54, 55, 56 and 61.\n4.\nDitto,\nFactories manufacturing beverages;\nPreparation and handling of syrup and other\n\t\t\t\t\tingredients and same materials, filing and cleaning of bottles\n\t\t\t\t\tand other work incidental thereto.\nDitto.\n...\n5.\n64 (2) (c) and 64 (3).\nAll factories other than those which work through the day in\n\t\t\t\t\ta system of relays.\n(i) Work of drivers and\n\t\t\t\t\tattendant upon lighting, ventilating and humidifying plants.\n(ii) Work of Fire Pump Men.\nSections 51, 54, 55 and 61.\n...\n6.\n64(2) (c) and 64 (3).\nCold storage and refrigeration factories or for Cold storage\n\t\t\t\t\tand regrigration plants attached with other factories.\nWork of loading and\n\t\t\t\t\tunloading and transports of articles.\nExplanation . - The work of loading and\n\t\t\t\t\tunloading includes work of and in connection with stocking of\n\t\t\t\t\tarticles fro preservation in the storage rooms and removal\n\t\t\t\t\ttherefrom besides, loading and unloading on transport vehicles.\nExplanation",
        "footnote": "",
        "is_definition": false,
        "sort_order": 262
    },
    "prev_section": "83",
    "next_section": "51"
}