5. Consolidated statement of compounded developments.

Schedule I
( Bye-Law No. 3 )
Composition Fee
Composition Fee
Amount of composition fee where the unauthorised
construction/development has been undertaken or carried out-
Type of unauthorised construction/ development
(a) without the permission, approval or sanction, referred to
in Section 14;
(b) in contravention of any condition subject to which such
permission, approval or sanction was granted.
1
2
1.
Construction within the front setback.
Rs. 300 per square metre of the area covered on each floor
plus double the coast of land (present market value), with a
minimum fee of Rs. 2,000 to a maximum up to Rs. 10,000.
2.
Construction within the side setback.
Rs. 200 per square metre of the area covered on each floor
plus the cost of land (present market value) with a minimum fee
of Rs. 1,500 to a maximum up to Rs. 10,000.
3.
Construction within the rear setback.
Rs. 150 per square metre of the area covered on each floor
plus the cost of land (present market value) with a minimum fee
of Rs. 1,000 to a maximum up to Rs. 10,000.
4.
If the plot coverage is more than the prescribed coverage.
Rs. 150 per square metre of the area exceeding the prescribed
limits plus cost of land (present market value) with a minimum
fee of Rs. 1,000 to a maximum up to Rs. 10,000.
5.
If the clear height inside the room is less than the
prescribed height.
(a) height reduction up to 15 per cent Rs. 200 per square
metre of room areas:
(b) height reduction more than 15 per cent Rs. 300 per square
metre of room area; with a minimum fee of Rs. 1,000 to a maximum
up to Rs. 10,000.
6.
If the area of room is less than the prescribed area.
Rs. 200 per square metre for the area by which the room is
less than prescribed area with a minimum of Rs. 1,500 to a
maximum up to Rs. 10,000.
7.
Room does not have minimum ventilation prescribed.
(a) window area is reduced up to 50 per cent Rs. 50 per
square metre of the room area;
(b) window area is reduced by more than 50 per cent Rs. 100
per square metre of the room area, with a minimum fee of Rs.
2,000 to a maximum up to Rs. 10,000.
8.
Construction of compound wall where sub-division not legally
sanctioned.
(a) if the height is below 1,5 metre 0.5 paise per running
metre;
(b) if the height is above 1.5 metre Rs. 2.00 per running
metre;
with a minimum fee of Rs. 2,000 to a maximum up to Rs.
10,000.
9.
Construction made where sub-division is sanctioned or area is
defined.
(a) if the height is below 1.5 metre 0.30 paise per running
metre;
(b) if the height is above 1.5 metre Rs. 1.50 per running
metre;
with a minimum of Rs. 1,500 to a maximum up to Rs. 10,000.
10.
Development would not have been in violation of the laws if
the applicant had abided by the provision of Section 15 of the
Act.
Rs. 100.00 per square metre of the covered area with a
minimum fee of Rs. 2,500 to a maximum up to Rs. 10,000.
11.
Development relates to excavation, storm waterdrain, etc.
which is not covered in categories 1 to 10 above.
Rs. 200 per square metre of the covered area with a minimum
fee of Rs. 1,500 to a maximum fee up to Rs. 10,000.
Schedule II
Bareilly Development Authority
Bareilly Development Authority
SI. No.
Name and address of the owner
Location of unauthorised construction
Category No. of Schedule I under which
unauthorised construction/development is covered
Mode of calculation of composition fee
Total amount of composition fee according to
columns 4 and 5 which the owner has to pay
1
2
3
4
5
6
Date of order under Section 32
Amount of composition paid by the owner
Date of payment of composition fee
Balance, if
Reasons, any if any for any deviation from column
6
Remarks
7
8
9
10
11
12