{
    "act_title": "Bareilly Development Authority Composition of Offences Bye-Laws, 1983",
    "act_slug": "bareilly-development-authority-composition-of-offences-bye-laws-1983",
    "section_label": "Section",
    "section": {
        "number": "5",
        "title": "5. Consolidated statement of compounded developments.",
        "chapter": null,
        "content": "Schedule I\n( Bye-Law No. 3 )\nComposition Fee\nComposition Fee\nAmount of composition fee where the unauthorised\n construction/development has been undertaken or carried out-\nType of unauthorised construction/ development\n(a) without the permission, approval or sanction, referred to\n in Section 14;\n(b) in contravention of any condition subject to which such\n permission, approval or sanction was granted.\n1\n2\n1.\nConstruction within the front setback.\nRs. 300 per square metre of the area covered on each floor\n plus double the coast of land (present market value), with a\n minimum fee of Rs. 2,000 to a maximum up to Rs. 10,000.\n2.\nConstruction within the side setback.\nRs. 200 per square metre of the area covered on each floor\n plus the cost of land (present market value) with a minimum fee\n of Rs. 1,500 to a maximum up to Rs. 10,000.\n3.\nConstruction within the rear setback.\nRs. 150 per square metre of the area covered on each floor\n plus the cost of land (present market value) with a minimum fee\n of Rs. 1,000 to a maximum up to Rs. 10,000.\n4.\nIf the plot coverage is more than the prescribed coverage.\nRs. 150 per square metre of the area exceeding the prescribed\n limits plus cost of land (present market value) with a minimum\n fee of Rs. 1,000 to a maximum up to Rs. 10,000.\n5.\nIf the clear height inside the room is less than the\n prescribed height.\n(a) height reduction up to 15 per cent Rs. 200 per square\n metre of room areas:\n(b) height reduction more than 15 per cent Rs. 300 per square\n metre of room area; with a minimum fee of Rs. 1,000 to a maximum\n up to Rs. 10,000.\n6.\nIf the area of room is less than the prescribed area.\nRs. 200 per square metre for the area by which the room is\n less than prescribed area with a minimum of Rs. 1,500 to a\n maximum up to Rs. 10,000.\n7.\nRoom does not have minimum ventilation prescribed.\n(a) window area is reduced up to 50 per cent Rs. 50 per\n square metre of the room area;\n(b) window area is reduced by more than 50 per cent Rs. 100\n per square metre of the room area, with a minimum fee of Rs.\n 2,000 to a maximum up to Rs. 10,000.\n8.\nConstruction of compound wall where sub-division not legally\n sanctioned.\n(a) if the height is below 1,5 metre 0.5 paise per running\n metre;\n(b) if the height is above 1.5 metre Rs. 2.00 per running\n metre;\nwith a minimum fee of Rs. 2,000 to a maximum up to Rs.\n 10,000.\n9.\nConstruction made where sub-division is sanctioned or area is\n defined.\n(a) if the height is below 1.5 metre 0.30 paise per running\n metre;\n(b) if the height is above 1.5 metre Rs. 1.50 per running\n metre;\nwith a minimum of Rs. 1,500 to a maximum up to Rs. 10,000.\n10.\nDevelopment would not have been in violation of the laws if\n the applicant had abided by the provision of Section 15 of the\n Act.\nRs. 100.00 per square metre of the covered area with a\n minimum fee of Rs. 2,500 to a maximum up to Rs. 10,000.\n11.\nDevelopment relates to excavation, storm waterdrain, etc.\n which is not covered in categories 1 to 10 above.\nRs. 200 per square metre of the covered area with a minimum\n fee of Rs. 1,500 to a maximum fee up to Rs. 10,000.\nSchedule II\nBareilly Development Authority\nBareilly Development Authority\nSI. No.\nName and address of the owner\nLocation of unauthorised construction\nCategory No. of Schedule I under which\n unauthorised construction/development is covered\nMode of calculation of composition fee\nTotal amount of composition fee according to\n columns 4 and 5 which the owner has to pay\n1\n2\n3\n4\n5\n6\nDate of order under Section 32\nAmount of composition paid by the owner\nDate of payment of composition fee\nBalance, if\nReasons, any if any for any deviation from column\n 6\nRemarks\n7\n8\n9\n10\n11\n12",
        "footnote": "",
        "is_definition": false,
        "sort_order": 4
    },
    "prev_section": "4",
    "next_section": null
}