Section 12 • THE ANDHRA PRADESH INDUSTRIAL CORRIDOR DEVELOPMENT ACT, 2017
Section 12. Power to stop unauthorized development or construction in an Industrial Corridor
12. Power to stop unauthorized development or construction in an Industrial corridor.- (1) Where any unauthorized development or construction on any land in a Node is being carried out but has not been completed, the Authority may serve on the owner and the person carrying out the development or construction, a notice requiring the development of land or construction to be discontinued from the time of service of the notice.;
{
"act_title": "THE ANDHRA PRADESH INDUSTRIAL CORRIDOR DEVELOPMENT ACT, 2017",
"act_slug": "andhra-pradesh-industrial-corridor-development-act-2017",
"section_label": "Section",
"section": {
"number": "12",
"title": "Section 12. Power to stop unauthorized development or construction in an Industrial Corridor",
"chapter": null,
"content": "12. Power to stop unauthorized development or construction in an Industrial corridor.- (1) Where any unauthorized development or construction on any land in a Node is being carried out but has not been completed, the Authority may serve on the owner and the person carrying out the development or construction, a notice requiring the development of land or construction to be discontinued from the time of service of the notice.;",
"footnote": "",
"is_definition": false,
"sort_order": 1200
},
"prev_section": "11",
"next_section": "12"
}