5. Sub-station fault level.

Annexure 4
Annexure 4
Site Responsibility Schedule
Item of Plant/ Apparatus
Item of Plant/ Apparatus
Plant owner
Plant owner
Safety Responsibility
Safety Responsibility
Control Responsibility
Control Responsibility
Operation Responsibility
Operation Responsibility
Maintenance Responsibility
Maintenance Responsibility
Remarks
Remarks
............kV Switchyard
All equipment including bus-bars
Feeders
Generating Units
Other (to be specified)
Signatures
Plant Owner
Safety Responsibility Officer
Control Responsibility Officer
Operation Responsibility Officer
Maintenance Responsibility Officer
Annexure 5
Annexure 5
List of Power Factor Apparatus
List of Power Factor Apparatus
For Motors
SI. No.
SI. No.
Rating of Individual Motor
Rating of Individual Motor
KVAR Rating of Capacitor
KVAR Rating of Capacitor
750 RPM
750 RPM
1000 RPM
1000 RPM
1500 RPM
1500 RPM
3000 RPM
3000 RPM
1
Upto 3 HP
1
1
1
1
2
5 HP
2
2
2
2
3
7.5 HP
3
3
3
3
3
10 HP
3
3
3
3
5
15 HP
6
5
5
4
6
20 HP 8
7
6
5
7
25 HP
9
8
7
6
8
30 HP
9
9
8
7
9
40 HP
13
11
10
9
10
50 HP
15
15
12
10
11
60 HP
20
20
16
14
12
75 HP
23
23
19
16
13
100 HP
30
30
23
20
14
125 HP
39
38
31
26
15
150 HP
45
45
36
30
16
200 HP
60
60
48
40
For Welding Transformers
SI. No.
SI. No.
Name Plate Rating in KVA of individual welding
transformer
Name Plate Rating in KVA of individual welding
transformer
Capacity of the capacitors (KVAR)
Capacity of the capacitors (KVAR)
1
1
1
2
2
2
3
3
3
3
3
3
5
5
4
6
6
5
7
7
6
8
8
6
9
9
7
10
10
8
11
11
9
12
12
9
13
13
10
13
13
11
15
15
12
16
16
12
17
17
13
18
18
14
19
19
15
20
20
15
21
21
16
22
22
17
23
23
18
23
23
19
25
25
19
26
26
20
27
27
21
28
28
22
29
29
22
30
30
23
31
31
24
32
32
25
33
33
25
33
33
26
35
35
27
Annexure 6
Annexure 6
The Intimation of Accidents (Form and Time of service of Notice) Rules, 2004
Form A
Form A
Form for reporting electrical accidents