(i) The average losses in the transformer shall be calculated as follows and added to the energy consumption indicated by the meter: -
(ii) The transformer loss arrived at by the above formula shall be added to the energy consumption, even when the recorded energy consumption is nil.
(iii) 1 % of the transformer capacity for transformer above 63 KVA will be added to the recorded maximum demand on the Low Tension side to arrive at the equivalent High Tension demand.]
(i) It is the responsibility of the licensee to replace all defective meters [belonging to the licensee] at his cost.
(ii) Since the safe custody of the meter is the consumer's responsibility, replacement of meter due to damages shall be at the cost of consumer.
(iii) The cost of replacement for burnt meters shall be met by the licensee unless it is proved otherwise that the burning out is due to the fault of the consumer.
(iv) When the meter is owned by the consumer and becomes defective / damaged or when the meter is burnt due to the fault of the consumer, it is the responsibility of the consumer to replace the meter by a healthy one, if he elects to continue to have his own meter. Otherwise, the licensee shall replace the meter and enter into an agreement for hire and collect the specified deposits.
Section 7 • The Tamil Nadu Electricity Supply Code, 2004
7. Installation of meter.
the-tamil-nadu-electricity-supply-code-2004-sec-7.json
•
Section 7
{
"act_title": "The Tamil Nadu Electricity Supply Code, 2004",
"act_slug": "the-tamil-nadu-electricity-supply-code-2004",
"section_label": "Section",
"section": {
"number": "7",
"title": "7. Installation of meter.",
"chapter": null,
"content": "(i) The average losses in the transformer shall be calculated as follows and added to the energy consumption indicated by the meter: -\n(ii) The transformer loss arrived at by the above formula shall be added to the energy consumption, even when the recorded energy consumption is nil.\n(iii) 1 % of the transformer capacity for transformer above 63 KVA will be added to the recorded maximum demand on the Low Tension side to arrive at the equivalent High Tension demand.]\n(i) It is the responsibility of the licensee to replace all defective meters [belonging to the licensee] at his cost.\n(ii) Since the safe custody of the meter is the consumer's responsibility, replacement of meter due to damages shall be at the cost of consumer.\n(iii) The cost of replacement for burnt meters shall be met by the licensee unless it is proved otherwise that the burning out is due to the fault of the consumer.\n(iv) When the meter is owned by the consumer and becomes defective / damaged or when the meter is burnt due to the fault of the consumer, it is the responsibility of the consumer to replace the meter by a healthy one, if he elects to continue to have his own meter. Otherwise, the licensee shall replace the meter and enter into an agreement for hire and collect the specified deposits.",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
"prev_section": "6",
"next_section": "8"
}