[(1-a) In every sugar Factory, sale proceeds of molasses at the rate of rupees two per quintal produced out of sugarcane crushed on or after the first day of October, 1987, shall be credited under a separate head of account "Storage Fund for Molasses Account" (hereinafter referred to as the "Storage Account") for providing storage facilities and the amount available under the aforesaid head of account shall be credited in a separate account in a Bank:]
(1-b) The occupier of each sugar factory shall, within a period of thirty days of the commencement of the Punjab Molasses (Control) (First Amendment) Rules, 1978, submit to the Controller a return showing the total sale of molasses made during the period commencing on the 1st day of November, preceding the date of such commencement till that date.
(1-c) The occupier of each sugar factory shall for each month submit to the Controller a return within ten days of the close of the month to which it relates, showing the total sale of molasses during that month and the amount credited to the 'Storage Account' during that month.
(1-d) The occupier of each sugar factory shall for each year submit to the Controller a return showing the total production of molasses, the total sale therefrom and the amount credited to the Storage Account during that year within a period of thirty days of the close of the year to which it relates. Such return shall be duly verified and certified as correct by a Chartered Accountant.
(1-e) The amount credited to the Storage Account shall not be utilised for any purpose other than for providing storage facilities.
(1-f) Where any amount is intended to be withdrawn from the Storage Account the occupier of the sugar factory shall submit his proposals for utilising the same to the Controller who may, after satisfying himself, that the proposals are in order, permit such withdrawal either in part or in whole.
(1-g) The facilities required for storage of molasses in a sugar factory shall be determined by the Controller.
(1-h) The storage tanks for molasses shall be as per specifications formulated by the Indian Standard Institution in IS 5521 1969 and the work shall be carried out in pucca covered masonry in the manner decided upon by the Controller.
(1-i) The Controller shall after giving an opportunity to the occupier of the sugar factory fix a time schedule for providing storage facilities specified by him keeping in view the requirement of that factory.
(1-j) In the event of failure on the part of the occupier of a sugar factory to provide the storage facilities specified under sub-rule (1-i), the Controller may have the work executed through the Public Works Department of the State Government or such other agency as he may determine and in such an event the occupier shall be bound to place the requisite amount for the execution of such works at the disposal of the Controller.
(1-k) In the event of dispute in relation to the quantum of the amount required for the purpose referred to in sub-rule (1-j) the decision of the Controller shall be final and binding on the occupier.
(1-l) The Controller or an officer authorised by him in this behalf may at all reasonable times inspect the storage facilities provided by a sugar factory].
Section 6 • The Punjab Molasses (Control) Rules, 1962
6. Regulation of price of molasses.
the-punjab-molasses-control-rules-1962-1962-sec-6.json
•
Section 6
{
"act_title": "The Punjab Molasses (Control) Rules, 1962",
"act_slug": "the-punjab-molasses-control-rules-1962-1962",
"section_label": "Section",
"section": {
"number": "6",
"title": "6. Regulation of price of molasses.",
"chapter": null,
"content": "[(1-a) In every sugar Factory, sale proceeds of molasses at the rate of rupees two per quintal produced out of sugarcane crushed on or after the first day of October, 1987, shall be credited under a separate head of account \"Storage Fund for Molasses Account\" (hereinafter referred to as the \"Storage Account\") for providing storage facilities and the amount available under the aforesaid head of account shall be credited in a separate account in a Bank:]\n(1-b) The occupier of each sugar factory shall, within a period of thirty days of the commencement of the Punjab Molasses (Control) (First Amendment) Rules, 1978, submit to the Controller a return showing the total sale of molasses made during the period commencing on the 1st day of November, preceding the date of such commencement till that date.\n(1-c) The occupier of each sugar factory shall for each month submit to the Controller a return within ten days of the close of the month to which it relates, showing the total sale of molasses during that month and the amount credited to the 'Storage Account' during that month.\n(1-d) The occupier of each sugar factory shall for each year submit to the Controller a return showing the total production of molasses, the total sale therefrom and the amount credited to the Storage Account during that year within a period of thirty days of the close of the year to which it relates. Such return shall be duly verified and certified as correct by a Chartered Accountant.\n(1-e) The amount credited to the Storage Account shall not be utilised for any purpose other than for providing storage facilities.\n(1-f) Where any amount is intended to be withdrawn from the Storage Account the occupier of the sugar factory shall submit his proposals for utilising the same to the Controller who may, after satisfying himself, that the proposals are in order, permit such withdrawal either in part or in whole.\n(1-g) The facilities required for storage of molasses in a sugar factory shall be determined by the Controller.\n(1-h) The storage tanks for molasses shall be as per specifications formulated by the Indian Standard Institution in IS 5521 1969 and the work shall be carried out in pucca covered masonry in the manner decided upon by the Controller.\n(1-i) The Controller shall after giving an opportunity to the occupier of the sugar factory fix a time schedule for providing storage facilities specified by him keeping in view the requirement of that factory.\n(1-j) In the event of failure on the part of the occupier of a sugar factory to provide the storage facilities specified under sub-rule (1-i), the Controller may have the work executed through the Public Works Department of the State Government or such other agency as he may determine and in such an event the occupier shall be bound to place the requisite amount for the execution of such works at the disposal of the Controller.\n(1-k) In the event of dispute in relation to the quantum of the amount required for the purpose referred to in sub-rule (1-j) the decision of the Controller shall be final and binding on the occupier.\n(1-l) The Controller or an officer authorised by him in this behalf may at all reasonable times inspect the storage facilities provided by a sugar factory].",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
"prev_section": "5",
"next_section": "7"
}