(2) Gateways.
(3) Barriers and Turngates.
(b) If the distance between wall and track cannot be made to accommodate such a barrier, the barrier or a turngate shall be placed at the inside of the opening.
(c) Where a footway passes close to a building or other obstruction as it approaches a railway track a barrier or a turngate shall be fixed in such a manner that a person approaching the track is compelled to move away from the building or obstruction and thus obtain timely sight of an approaching locomotive or wagon.
(4) Crowds.
(b) At any time of the day when workers are starting or ending work, all railway traffic shall cease for not less than five minutes.
(5) Locomotives.
(b) Every locomotive and tender shall be provided with efficient brakes, all of which shall be maintained in good working order. Brake shoes shall be examined at suitably fixed intervals and those which are worn out shall be replaced at once.
(c) Water-gauge glasses of every locomotive, whatever its boiler pressure may be, shall be protected with substantial glass or metal screens.
(d) Suitable stops and hand-holds shall be provided at the corners of the locomotive for the use of shunters.
(e) Every locomotive crane shall be provided with lifting and jacking pads at the four corners of the locomotive for assisting in re-railing operations.
(f) It shall be clearly indicated on every locomotive crane in English and in the language understood by the majority of the workers in the factory, for what weight of load and at what radius the crane is safe.
(6) Wagons.
(b) No wagon shall be kept standing within three metres of any pinch bars.
(7) Riding on locomotive, wagon or other rolling stock.
(8) Attention to brakes and doors.
(b) No train shall be set in motion until the shutting jamadar has satisfied himself that all wagon doors are securely fastened.
(9) Projecting loads and cranes.
(b) No loco-crane shall travel without load, the jib is completely lowered and positioned in line with the track.
(c) When it is necessary for a loco-crane with a load, the jib, shall not be swung until the loco-crane has come to rest.
(10) Loose shouting.
(11) Fly shutting.
(12) The shunting jamadar.
(b) Before authorising a locomotive or wagon to be moved, the shunting jamadar shall satisfy himself that no person is under or in between or in front of the locomotive or wagon.
(13) Hand signals.
(14) Night work and fog.
(b) In no circumstances shall any locomotive or train be moved between sunset and sunrise or at any time when there is fog, unless it carries a white head light and a red rear light.
(15) Speed control.
(b) A train, locomotive, wagon or other rolling stock shall not be moved by mechanical or electrical power unless it is preceded at a distance of not less than ten metres during the whole of its journey by a shunting jamadar. He shall be provided with signaling flags or lamp and whistle necessary for calling the attention of the driver.
(16) Tracks.
(i) from centre to centre of parallel tracks, the over all width of the widest wagon of that gauge plus twice the width of the door of such a wagon when opened directly outward plus one metre.
(ii) from a building or structure other than a loading platform to the centre of the nearest track, half the overall width of the widest wagon of that gauge, plus the width of its door when opened outward, plus one and a half metres.
(iii) from material stacked or deposited alongside the track, on the ground or on a loading platform, to the centre of the nearest track, half the overall width of the widest wagon of that gauge, plus half the width of its door when opened directly outward, plus one metre.
(b) Sleepers of a track shall be in level with the ground and at all crossings of the track with a road or walkway, the surface of the road or walkway shall be in level with the top of the rails.
(c) All track ends shall be equipped with buffer stops of adequate strength.
(d) Barriers of substantial constructions shall be securely and permanently fixed across and doorway or gateway in a building or in a wall which conceals an approaching train from view, between the building and the track as prescribed in clause (a) of sub-rule (3).
(e) Where tracks are carried on a ganty or other elevation, a footway or footways with hand rails and toe-boards shall be provided at all positions where persons work or pass on foot; and where there is an opening in the stage of an elevated track for the dropping of materials to a lower level, the position shall be adequately fenced or the opening itself provided with a grill through which a person cannot fall.
(f) All point levers shall have their movement parallel to, not across, the direction of the track.
(g) All loading platforms which are more than sixty centimetres above the level of the ground on which the track is laid and more than fifteen metres in length, shall be provided with stops at intervals not greater than fifteen metres Apart to enable the platform to be easily mounted from the track.
(h) Turn tables on plan railways shall be provided with locking devices which will prevent the tables from turning while locomotive or wagons are being run on or off the tables.
(i) Workers shall be prohibited from passing under, between or above railway wagons.
(17) Crossings.
(b) All crossings, warning signs, gates and barriers shall be illuminated during hours of darkness.
(18) Duties of drivers and shunters.
(19) Young persons not be employed as drivers of locomotive or as shunters.
(20)
[67H. Site appraisal Committee.
(a) The State Government may constitute or reconstitute a Site Appraisal Committee as and when necessary;
(b) The State Government may appoint a senior official of the Factories Inspectorate, preferably having qualification in Chemical Engineering to be the Secretary of the Committee;
(c) The State Government may appoint the following as members of the Committee, namely :-
(i) a representative of the Local Government wing of the department of Local Government, Housing and Urban Development department of the State Government;
(ii) a representative of the department of Industries of the State Government; and
(iii) a representative of the Director-General of Factory Advice Service and Labour Institute, Bombay.
(2)
(3) Applications for appraisal of Sites.
(a) Applications for appraisal of sites in respect of the industries covered under clause (cb) of Section 2 of the Act shall be submitted to the Chairman of the Site Appraisal Committee :
(b) The application for site appraisal alongwith fifteen copies thereof shall be submitted in Form 8-B. The Committee may dispense with furnishing of information on any Particular item in the application Form, if it considers the same to be not relevant to the application under consideration.
(4) Functions of the Committe.
(a) The Secretary shall arrange to register the applications received for appraisal of site in a separate register and acknowledge the same within a period of seven days;
(b) The Secretary shall fix up the meetings in such manner that all the applications received and registered are referred to the Committee within a period of one month from the date of their receipt;
(c) The Committee shall adopt a procedure for its working keeping in view the need for expeditious disposal of applications;
(d) The Committee shall examine the applications for appraisal of a site with reference to the prohibitions and restriction on the location of an industry and the carrying on of processes and operations in different areas as per the provisions of Rule 5 of the Environment (Protection) Rules, 1986 framed under the Environment (Protection) Act, 1986;
(e) The Committee may call for documents examine experts, inspect the site if necessary and take other steps for formulating its views in regard to the suitability of the site;
(f) Wherever the proposed site requires clearance by the Ministry of Industries or by the Ministry of Environment and Forests of Government of India, the application for Site Appraisal will be considered by the Site Appraisal Committee only after such clearance has been received.
Section 67G • The Punjab Factory Rules, 1952
67G. Railways in factories.
the-punjab-factory-rules-1952-sec-67G.json
•
Section 67G
{
"act_title": "The Punjab Factory Rules, 1952",
"act_slug": "the-punjab-factory-rules-1952",
"section_label": "Section",
"section": {
"number": "67G",
"title": "67G. Railways in factories.",
"chapter": null,
"content": "(2) Gateways.\n(3) Barriers and Turngates.\n(b) If the distance between wall and track cannot be made to accommodate such a barrier, the barrier or a turngate shall be placed at the inside of the opening.\n(c) Where a footway passes close to a building or other obstruction as it approaches a railway track a barrier or a turngate shall be fixed in such a manner that a person approaching the track is compelled to move away from the building or obstruction and thus obtain timely sight of an approaching locomotive or wagon.\n(4) Crowds.\n(b) At any time of the day when workers are starting or ending work, all railway traffic shall cease for not less than five minutes.\n(5) Locomotives.\n(b) Every locomotive and tender shall be provided with efficient brakes, all of which shall be maintained in good working order. Brake shoes shall be examined at suitably fixed intervals and those which are worn out shall be replaced at once.\n(c) Water-gauge glasses of every locomotive, whatever its boiler pressure may be, shall be protected with substantial glass or metal screens.\n(d) Suitable stops and hand-holds shall be provided at the corners of the locomotive for the use of shunters.\n(e) Every locomotive crane shall be provided with lifting and jacking pads at the four corners of the locomotive for assisting in re-railing operations.\n(f) It shall be clearly indicated on every locomotive crane in English and in the language understood by the majority of the workers in the factory, for what weight of load and at what radius the crane is safe.\n(6) Wagons.\n(b) No wagon shall be kept standing within three metres of any pinch bars.\n(7) Riding on locomotive, wagon or other rolling stock.\n(8) Attention to brakes and doors.\n(b) No train shall be set in motion until the shutting jamadar has satisfied himself that all wagon doors are securely fastened.\n(9) Projecting loads and cranes.\n(b) No loco-crane shall travel without load, the jib is completely lowered and positioned in line with the track.\n(c) When it is necessary for a loco-crane with a load, the jib, shall not be swung until the loco-crane has come to rest.\n(10) Loose shouting.\n(11) Fly shutting.\n(12) The shunting jamadar.\n(b) Before authorising a locomotive or wagon to be moved, the shunting jamadar shall satisfy himself that no person is under or in between or in front of the locomotive or wagon.\n(13) Hand signals.\n(14) Night work and fog.\n(b) In no circumstances shall any locomotive or train be moved between sunset and sunrise or at any time when there is fog, unless it carries a white head light and a red rear light.\n(15) Speed control.\n(b) A train, locomotive, wagon or other rolling stock shall not be moved by mechanical or electrical power unless it is preceded at a distance of not less than ten metres during the whole of its journey by a shunting jamadar. He shall be provided with signaling flags or lamp and whistle necessary for calling the attention of the driver.\n(16) Tracks.\n(i) from centre to centre of parallel tracks, the over all width of the widest wagon of that gauge plus twice the width of the door of such a wagon when opened directly outward plus one metre.\n(ii) from a building or structure other than a loading platform to the centre of the nearest track, half the overall width of the widest wagon of that gauge, plus the width of its door when opened outward, plus one and a half metres.\n(iii) from material stacked or deposited alongside the track, on the ground or on a loading platform, to the centre of the nearest track, half the overall width of the widest wagon of that gauge, plus half the width of its door when opened directly outward, plus one metre.\n(b) Sleepers of a track shall be in level with the ground and at all crossings of the track with a road or walkway, the surface of the road or walkway shall be in level with the top of the rails.\n(c) All track ends shall be equipped with buffer stops of adequate strength.\n(d) Barriers of substantial constructions shall be securely and permanently fixed across and doorway or gateway in a building or in a wall which conceals an approaching train from view, between the building and the track as prescribed in clause (a) of sub-rule (3).\n(e) Where tracks are carried on a ganty or other elevation, a footway or footways with hand rails and toe-boards shall be provided at all positions where persons work or pass on foot; and where there is an opening in the stage of an elevated track for the dropping of materials to a lower level, the position shall be adequately fenced or the opening itself provided with a grill through which a person cannot fall.\n(f) All point levers shall have their movement parallel to, not across, the direction of the track.\n(g) All loading platforms which are more than sixty centimetres above the level of the ground on which the track is laid and more than fifteen metres in length, shall be provided with stops at intervals not greater than fifteen metres Apart to enable the platform to be easily mounted from the track.\n(h) Turn tables on plan railways shall be provided with locking devices which will prevent the tables from turning while locomotive or wagons are being run on or off the tables.\n(i) Workers shall be prohibited from passing under, between or above railway wagons.\n(17) Crossings.\n(b) All crossings, warning signs, gates and barriers shall be illuminated during hours of darkness.\n(18) Duties of drivers and shunters.\n(19) Young persons not be employed as drivers of locomotive or as shunters.\n(20)\n[67H. Site appraisal Committee.\n(a) The State Government may constitute or reconstitute a Site Appraisal Committee as and when necessary;\n(b) The State Government may appoint a senior official of the Factories Inspectorate, preferably having qualification in Chemical Engineering to be the Secretary of the Committee;\n(c) The State Government may appoint the following as members of the Committee, namely :-\n(i) a representative of the Local Government wing of the department of Local Government, Housing and Urban Development department of the State Government;\n(ii) a representative of the department of Industries of the State Government; and\n(iii) a representative of the Director-General of Factory Advice Service and Labour Institute, Bombay.\n(2)\n(3) Applications for appraisal of Sites.\n(a) Applications for appraisal of sites in respect of the industries covered under clause (cb) of Section 2 of the Act shall be submitted to the Chairman of the Site Appraisal Committee :\n(b) The application for site appraisal alongwith fifteen copies thereof shall be submitted in Form 8-B. The Committee may dispense with furnishing of information on any Particular item in the application Form, if it considers the same to be not relevant to the application under consideration.\n(4) Functions of the Committe.\n(a) The Secretary shall arrange to register the applications received for appraisal of site in a separate register and acknowledge the same within a period of seven days;\n(b) The Secretary shall fix up the meetings in such manner that all the applications received and registered are referred to the Committee within a period of one month from the date of their receipt;\n(c) The Committee shall adopt a procedure for its working keeping in view the need for expeditious disposal of applications;\n(d) The Committee shall examine the applications for appraisal of a site with reference to the prohibitions and restriction on the location of an industry and the carrying on of processes and operations in different areas as per the provisions of Rule 5 of the Environment (Protection) Rules, 1986 framed under the Environment (Protection) Act, 1986;\n(e) The Committee may call for documents examine experts, inspect the site if necessary and take other steps for formulating its views in regard to the suitability of the site;\n(f) Wherever the proposed site requires clearance by the Ministry of Industries or by the Ministry of Environment and Forests of Government of India, the application for Site Appraisal will be considered by the Site Appraisal Committee only after such clearance has been received.",
"footnote": "",
"is_definition": false,
"sort_order": 131
},
"prev_section": "67F",
"next_section": "67I"
}