Master's degree in Chemistry, or a Bachelor's degree in
Chemical Engineering from a recognised University.
(i) An experience of working for a minimum period of ten
years :- in collection and analysis of environmental samples and
calibration of monitoring equipment; (ii) Should. - (a) be
conversant with the hazardous properties of chemicals and their
permissible limit values; (b) be conversant with the current
techniques of sampling and analysing of the environmental
contaminants; and (c) be able to arrive at a reliable
conclusion regarding safety in respect of entering and carrying
out hot work
Meters, instruments and devices duly calibrated and certified
for carrying out the tests and certification of safety in working
in confined spaces
Ventilation systems as required under various Schedules
(specifying the manufacturing process or operation) framed under
section 87, such as Schedules on - (i) Grinding or glazing
of metal and processes incidental thereto; (ii) Cleaning or
smoothing, roughening etc. of articles, by a jet sand, metal
shot or grit or other abrasive propelled by a blast of compressed
air or steam; (iii) Handling and processing of asbestos; (iv)
Manufacture of Rayyon by viscose process; and, Bachelor's
Degree in Mechanical or Electrical Engineering or its equivalent
(i) An experience of working for a minimum period of seven
years in design, fabrication, installation, testing of
ventilation system and system used for extraction and collection
of dusts, fumes and vapours and other ancillary equipment;
and (ii) Should be conversant with the current and relevant
Codes of practice and tests procedures in respect of ventilation
and extraction system for fumes; and (iii) be able to arrive
at a reliable conclusion with regard to the effectiveness of the
system.
Facilities for testing the ventilation system, instruments
and gauges for testing the effectiveness of the extraction
systems for dusts, vapours and fumes and any other equipment
needed for determining the efficiency and adequacy of these
systems should have the assistance of a suitable qualified
Technical person, who can come to a reasonable conclusion as to
the adequacy of the system."
(v) Foundry operations.
[3. Submission of plans.
(a) the site of the factory and immediate surrounding including adjacent buildings and other structures, roads, drains, etc.;
(b) the plan, elevation and necessary cross-sections of the factory building indicating all relevant details relating to natural lighting, ventilation and means of escape in case of fire, and the position of the plant and machinery, aisles and passage ways; and
(c) such other Particulars as the State Government or the Chief Inspector, as the case may be, may require.]
[3A.]
(a) A certificate of approval from the local authority within the jurisdictional limits of which the site of the factory is situated or from the Improvement Trust, if the site of the factory falls under the jurisdiction of any Improvement Trust, or a certificate of approval from the Director, Town and Country Planning, Punjab, or Executive Engineer, PWD (Buildings and Roads), Punjab, in case the site of the factory is located in the areas covered by controlled areas/within 30 metres of any scheduled road, or 100 metres of any bye-pass, as required under the Punjab Scheduled Roads and Controlled Areas Restriction of Unregulated Development Act, 1963;
(b) Form No. I-A and replies to questionnaire annexed thereto;
(c) Flow chart of the manufacturing process giving a brief description of the process in its various stages;
(d) Site plan drawn to a minimum scale of 1 cm. = 12m. showing the exact location of the factory with respect to surrounding buildings, roads, drains, etc.;
(e) Plans elevations, cross-sections drawn to a minimum scale of 1 cm. = 12 m. showing means of lighting, ventilation, fire escapes, position of plant and machinery, direction of opening of doors, drinking water points, roof materials, details of urinals, latrines, washing places, facilities for storing and drying of workers clothing, rest-room and lunch-room, canteen and ambulance room; and
(f) such other Particulars as the Inspector may require in relation to the approval.
[4. Certificate of Stability.
5.
6.
(ii) There shall be provided at all times for each person employed in any room of a factory where mechanical or electrical power is used, at least 36 square feet (3.35 square metres) of floor space exclusive of that occupied by machinery and a breathing space of at least 500 cubic feet (14 cubic metre).
(iii) Particulars of each workroom of the [factory (except the factory declared and defined as such under section 85 of the Act) in which persons] are regularly employed shall be entered in Form 1-A, which shall be shown to the Inspector when required.
Section 36 • The Punjab Factory Rules, 1952
Section 36 - Precautions against dangerous fumes, gases etc. (ii) Rules made under sections 41 and 112 concerning ship-building and ship repairs.
the-punjab-factory-rules-1952-sec-36.json
•
Section 36
{
"act_title": "The Punjab Factory Rules, 1952",
"act_slug": "the-punjab-factory-rules-1952",
"section_label": "Section",
"section": {
"number": "36",
"title": "Section 36 - Precautions against dangerous fumes, gases\n\t\t\t\tetc. (ii) Rules made under sections 41 and 112 concerning\n\t\t\t\tship-building and ship repairs.",
"chapter": null,
"content": "Master's degree in Chemistry, or a Bachelor's degree in\n\t\t\t\tChemical Engineering from a recognised University.\n(i) An experience of working for a minimum period of ten\n\t\t\t\tyears :- in collection and analysis of environmental samples and\n\t\t\t\tcalibration of monitoring equipment; (ii) Should. - (a) be\n\t\t\t\tconversant with the hazardous properties of chemicals and their\n\t\t\t\tpermissible limit values; (b) be conversant with the current\n\t\t\t\ttechniques of sampling and analysing of the environmental\n\t\t\t\tcontaminants; and (c) be able to arrive at a reliable\n\t\t\t\tconclusion regarding safety in respect of entering and carrying\n\t\t\t\tout hot work\nMeters, instruments and devices duly calibrated and certified\n\t\t\t\tfor carrying out the tests and certification of safety in working\n\t\t\t\tin confined spaces\nVentilation systems as required under various Schedules\n\t\t\t\t(specifying the manufacturing process or operation) framed under\n\t\t\t\tsection 87, such as Schedules on - (i) Grinding or glazing\n\t\t\t\tof metal and processes incidental thereto; (ii) Cleaning or\n\t\t\t\tsmoothing, roughening etc. of articles, by a jet sand, metal\n\t\t\t\tshot or grit or other abrasive propelled by a blast of compressed\n\t\t\t\tair or steam; (iii) Handling and processing of asbestos; (iv)\n\t\t\t\tManufacture of Rayyon by viscose process; and, Bachelor's\n\t\t\t\tDegree in Mechanical or Electrical Engineering or its equivalent\n(i) An experience of working for a minimum period of seven\n\t\t\t\tyears in design, fabrication, installation, testing of\n\t\t\t\tventilation system and system used for extraction and collection\n\t\t\t\tof dusts, fumes and vapours and other ancillary equipment;\n\t\t\t\tand (ii) Should be conversant with the current and relevant \n\t\t\t\tCodes of practice and tests procedures in respect of ventilation\n\t\t\t\tand extraction system for fumes; and (iii) be able to arrive\n\t\t\t\tat a reliable conclusion with regard to the effectiveness of the\n\t\t\t\tsystem.\nFacilities for testing the ventilation system, instruments\n\t\t\t\tand gauges for testing the effectiveness of the extraction\n\t\t\t\tsystems for dusts, vapours and fumes and any other equipment\n\t\t\t\tneeded for determining the efficiency and adequacy of these\n\t\t\t\tsystems should have the assistance of a suitable qualified\n\t\t\t\tTechnical person, who can come to a reasonable conclusion as to\n\t\t\t\tthe adequacy of the system.\"\n(v) Foundry operations.\n[3. Submission of plans.\n(a) the site of the factory and immediate surrounding including adjacent buildings and other structures, roads, drains, etc.;\n(b) the plan, elevation and necessary cross-sections of the factory building indicating all relevant details relating to natural lighting, ventilation and means of escape in case of fire, and the position of the plant and machinery, aisles and passage ways; and\n(c) such other Particulars as the State Government or the Chief Inspector, as the case may be, may require.]\n[3A.]\n(a) A certificate of approval from the local authority within the jurisdictional limits of which the site of the factory is situated or from the Improvement Trust, if the site of the factory falls under the jurisdiction of any Improvement Trust, or a certificate of approval from the Director, Town and Country Planning, Punjab, or Executive Engineer, PWD (Buildings and Roads), Punjab, in case the site of the factory is located in the areas covered by controlled areas/within 30 metres of any scheduled road, or 100 metres of any bye-pass, as required under the Punjab Scheduled Roads and Controlled Areas Restriction of Unregulated Development Act, 1963;\n(b) Form No. I-A and replies to questionnaire annexed thereto;\n(c) Flow chart of the manufacturing process giving a brief description of the process in its various stages;\n(d) Site plan drawn to a minimum scale of 1 cm. = 12m. showing the exact location of the factory with respect to surrounding buildings, roads, drains, etc.;\n(e) Plans elevations, cross-sections drawn to a minimum scale of 1 cm. = 12 m. showing means of lighting, ventilation, fire escapes, position of plant and machinery, direction of opening of doors, drinking water points, roof materials, details of urinals, latrines, washing places, facilities for storing and drying of workers clothing, rest-room and lunch-room, canteen and ambulance room; and\n(f) such other Particulars as the Inspector may require in relation to the approval.\n[4. Certificate of Stability.\n5.\n6.\n(ii) There shall be provided at all times for each person employed in any room of a factory where mechanical or electrical power is used, at least 36 square feet (3.35 square metres) of floor space exclusive of that occupied by machinery and a breathing space of at least 500 cubic feet (14 cubic metre).\n(iii) Particulars of each workroom of the [factory (except the factory declared and defined as such under section 85 of the Act) in which persons] are regularly employed shall be entered in Form 1-A, which shall be shown to the Inspector when required.",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
"prev_section": "31",
"next_section": "7"
}