(a) Name of injured person (if any);
(b) date of accident or dangerous occurrence;
(c) date of report on Form No. 18 to Inspector;
(d) nature of accident or dangerous occurrence;
(e) date of return of injured person to work; and
(f) number of days of absence from work of injured person.
[112. Maintenance of Inspection Book.
[113. Intimation of the intended closure of Factory.
(i) the reason for closure;
(ii) the number of workers on rolls on the date of submission of report;
(iii) the number of workers likely to be affected by the closure; and
(iv) the probable period of closure.
[(v) information as to the Particulars and quantity of chemicals stored and action taken proposed to be taken thereof to ensure safety during such closure.]
[Form I]
[Form I]
[Prescribed under sub-rule (3) of rule 2A].
Application for grant of certificate of competency to a person.
Name of the Organisation
Period of service
Designation
Area of responsibility
(ii) Arrangements for calibrating and maintaining the accuracy of these facilities.
(a) that in the event of any change in the facilities at my disposal (either addition or deletion) or my leaving the aforesaid organisation, I will promptly inform the Chief Inspector of Factories.
(b) to maintain the facilities in good working order, calibrated periodically as per manufacturer's instructions or as per National Standards; and
(c) to fulfil and abide by all the conditions stipulated in the certificate of competency and instructions issued by the Chief Inspector of Factories from time to time.
Signature
To be filled in by the Institution (if employed)
(a) notify the Chief Inspector of Factories in case the competent person leaves our employment;
(b) provide and maintain in good order all facilities at his disposal as mentioned above;
(c) notify the Chief Inspector of Factories any charge in the facilities (either addition or deletion).
Signature _________________
Designation _______________
Telephone No.
Official Seal
Form 1-A
Form 1-A
[Prescribed under sub-rule (3) of rule 2-A]
Serial No.
Name and designation
Qualification
Experience
Station(s) and the rules under which competency is sought for
1
2
(i) maintain the facilities in good working order, calibrated periodically as per manufacturers instructions or as per National Standards; and
(ii) to fulfil and abide by all the conditions stipulated in the certificate of competency and instructions issued by the Chief Inspector of Factories from time to time.
Signature of Head of the Institution or of the persons authorised to sign on his behalf.
Designation
Form No. 1-B
Form No. 1-B
[See rule 2-A (3)]
Form of Certificate of competency issued to a person or an institution in pursuance to sub-rule (3) of rule 2-A
(i) The tests, examinations and inspections shall be carried out in accordance with the provisions of the Act and the rules made thereunder;
(ii) The tests, examination and inspections shall be carried out under the direct supervision of the competent persons or by a person so authorised by an institution recognised to be competent person;
(iii) the certificate of competency shall stand cancelled if the person declared competent leaves the organisation mentioned in his application;
(iv) the institution recognised as competent person shall keep the Chief Inspector of Factories informed of the names, designations and qualifications of the persons authorised by it to carry out tests, examinations and inspections.
(v) ............................
(vi) ...........................
Note. - "A separate certificate should be issued under each relevant section. A person or an institution may be recognised competent for the purpose of more than one sections of the Act."
Form No. 1-C
Form No. 1-C
(Prescribed under rule 3)
Application for Permission
To construct, extend or take into use any building as factory
Signature of Applicant
Note. - This application shall be accompanied by the following documents:-
(a) A flow chart of the manufacturing process supplemented by a brief description of the process in its various stages.
(b) Plans, in duplicate, drawn to scale, showing -
(i) the site of the factory and immediate surroundings including adjacent buildings and other structures, road, drains, etc., and
(ii) the plan elevation and necessary cross sections, of the various buildings indicating all relevant details relating to natural lighting, ventilation and means of escape in case of fire. The plans also clearly indicate the position of the plant and machinery, aisles and passage ways; and
(c) Such other Particulars as the Chief Inspector may require.
Form No. 1-D
Form No. 1-D
(Prescribed under Rule 3)
Name of factory __________________
Particulars of rooms in the factory
Name of room in factory
Length in Mt.
Breadth in Mt.
Dimensions in meter
Breathing space (contents in cubic
Mt.)
Total volume of air in the room in cubic Mt
Height
Maximum in Mt
Minimum Mts
Average
Total area in sq. Mt.
Floor area occupied by machinery in the room
Number and size of the doors
Ventilation
Whether the room is to be used as a
work-room or for a storage room
Date of construction
Remarks
Number and size of window openings
Number and size of skylight openings
Total area in sq. Mt.
Maximum capacity of the room
Maximum number of persons intended to be employed in the room
Signature of occupier__________
Signature of manager __________
Questionnaire Annexed To
Questionnaire Annexed To
Form No. 1-E
Form No. 1-E
(Prescribed under rule 3)
Note . - The site plan should be drawn to a minimum scale of 12m. = 1 centimetre and the other plans drawn to a minimum scale of 120 cm. = 1 cm.
Note
1
(a) Is the Form No. 1-A submitted filled in for all
work-rooms, godowns, etc., which are proposed to be constructed
or extended ?
(b) Is the sectional elevation of each room or shed, etc.,
shown separately ?
(c) Is the minimum height of every room, sheds, etc., shown
clearly in sectional elevation ?
(d) Is the material of which the roof is constructed indicated
in the sectional elevation ?
(e) Are the position of various machines fitted or proposed to
be fitted, shown in drawings together with their names ?
(f) Are the maximum number of persons working or proposed to
be working in different rooms, sheds, etc., mentioned in the
drawing ?
(g) Are all new buildings, Parts of buildings or alterations
in existing building shown by the boundaries duly marked by a
distinctive colour ?
2
Is the breathing space of a work-room, sheds, etc., calculated
as shown below ?
(a) Floor area of a room multiplied by height of the room (the
maximum height for calculation should not exceed 4.2 meter).
(b) Is the maximum number of persons shown as the lower value
of the two calculations shown below ?
(i) Floor area of a room less area occupied by machinery in
the room divided by 36.
(ii) Breathing space [as in (a) above]. DIVIDED BY 500.
(c) Is the window and skylight area provided at the minimum
rate of 1 sq. meter to every 15 sq. meter of floor area of room ?
It is recommended that window and sky light may be provided
one opposite another so as to provide best cross-ventilation.
3
3
Doors-
Doors-
(a) Is every work-room provided with at least 2 doors ?
(b) is the minimum size of every door 1.95 meter x .90 meter ?
(c) Are all the doors opening outwards ?
4
4
Fire escapes -If any
factory building is of more than one storey -
Fire escapes
(a) Are two fire-escapes provided on either side of building ?
(b) Are the fire-escapes accessible from every room in the
building ?
(c) Is the material used in construction on the fire-escapes
non- combustible ?
(d) Are the windows or doors giving access to an external
staircase arranged to open immediately from inside ?
5
5
Latrines and urinals-
Latrines and urinals-
(a) Are the latrines and urinals provided separately ?
(b) Are these sufficient to meet the requirements of section
19 read with Rules 42 and 47 ?
(c) Is the minimum distance of the nearest building shown ?
(d) Is the minimum distance of the nearest well shown ?
(e) Is the surrounding ground up to a distance of 1.2 meter
all round made of impermeable materials ?
(f) If the surrounding ground raised to at least 15 centimeter
above ground level ?
(g) Is any latrine, ventilator or opening in the proximity of
any opening of main building ?
(h) Are these latrines flush-type ?
(i) Are all the drains, pipes, and sewers for carrying
sullage, sewage water, effluent and waste products, running in
factory premises constructed of impermeable material ?
(j) Are the drains of flush-type latrines, connected to
drainage system of the local board ?
(k) Is an efficient system of septic tanks provided, if no
drainage system exist ?
(l) Are the latrines provided with roofing ?
6
6
Drinking Water
Drinking Water
(a) Is the drinking water provided from a source provided by
local board ?
(b) Is any well constructed in the premises of the factory for
drinking water or humidification purposes ?
(c) Is the cylinder to the well pucca and impervious to water
throughout and up to a depth not less than the lowest level of
sub-soil water ?
(d) Are the position of water centres shown in the plans ?
Signature ____________________
Designation __________________
[ FORM No. 1-F ]
FORM No. 1-F
(See rule 4)
Signature .................................
Qualification ...........................
Address ....................................
If employed by a company or association, name and address of the company or association.
[ FORM No. 2 ]
FORM No. 2
Application for registration and grant or renewal of licence for the year a notice of occupation specified in sections 6 and 7
(to be submitted in triplicate)
(a) carried on in the factory during the last twelve months (in the case of factories already in existence).
(b) to be carried on in the factory during the next twelve months (in the case of all factories).
(ii) Maximum number of workers employed on any one day during the last 12 months.
(iii) Number of workers to be ordinarily employed in the factory.
(ii) Maximum amount of Power (H.P.) proposed to be used.
(i) The Proprietor of the Factory in case of private firm/proprietory concern.
[(ia) Partners in case of a Partnership firm/concern.]
(ii) Directors in case of a public limited liability company/firm.
(iii) Where a Managing Agent has been appointed the name of Managing Agents and Directors thereof.
(iv) Shareholders in case of a private company, where no Managing Agents have been appointed.
(v) The Chief Administrative Head in case of a Government or local fund factory.
(a) Reference number and date of approval of the plans for site whether for old or new building and for construction or extension of factory by the State Government/Chief Inspector.
(b) Reference number, and date of approval of the arrangements, if any made for the disposal of trade waste and effluents and the name and the authority granting such approval.
(i) paid in _____________ Treasury on _______ __ vide Challan No. __________ (enclosed).
(ii) Transmitted by crossed Cheque/Postal Order No. ______________ dated _______________ on the/of the _____________ Bank/Post office drawn in favour of Chief Inspector of Factories.
Signature of Occupier _______________
Date _____________
Signature of Manager _______________
Date _________________
Notes. - (1) This form should be completed in ink in block letters or typed.
(2) If power is not used at the time of filling up this form, but is introduced later, the fact should be communicated to the Chief Inspector immediately.
(3) If any of the persons named against item 8 is minor the fact should be clearly stated.
(4) In the case of a factory, where under the proviso to sub-sections (1) and (2) of section 100, a person has been nominated as the occupier, information required in item 8 should be supplied only in respect of that person.
(5) In the case of a factory where a Managing Agent or Agents have been appointed as occupier under the Indian Companies Act, 1913 (VII of 1913), information required in item 8 should be supplied only in respect of that person or persons.
[ FORM No. 2-A ]
FORM No. 2-A
Notice of change of Manager
(Prescribed under Rule 15-A)
Form No. 4
Form No. 4
(Prescribed under Rule 8)
Registration and Licence to work a Factory
Registration and Licence to work a Factory
Chief Inspector of Factories
Description of the licensed premises
Description of the licensed premises
Date of renewal
Renewals
Signature of Chief Inspector of Factories
Date of expiry
Date of transfer
Transfer
Signatue of Chief
Inspector of Factories
Name of persons to whom transferred
Reasons for Amendment
Date of Amendment
Changed category
Additional fee
Signature of Chief Inspector of Factories
Form No. 5
Form No. 5
(Prescribed under Rule 17)
Certificate of fitness
Certificate of fitness
1
Serial No.
_______________________________________
Serial No.
_______________________________________
Date
_______________________________________
Date
_______________________________________
2
Name
_______________________________________
I certify that I have personally examined (name)
3
Father's name
_______________________________________
______________________________________
______________________________________
4
Sex
_______________________________________
Son/daughter of _________________________________________
5
Residence
_______________________________________ _______________________________________
_______________________________________
6
[Date of birth if available and/or certified age]
_______________________________________
residing at
_______________________________________ ________________________________
7
Physical fitness
_______________________________________
[Who is desirous of being employed in a factory and whose date of birth as produced in the age certificate is _______________________________________ or as nearly as can be ascertained from my examination is _______________________________________ years and he/she is fit for employment in factory as an adult/child.]
8
Descriptive marks
_______________________________________ _______________________________________ _______________________________________
9
Reason for
_______________________________________
(i) refusal of certificate
__________________
His/her descriptive marks are
_______________________________________ _______________________________________
(ii) Certificate being revoked
_______________________________________ _______________________________________ _______________________________________
Thumb Impression
Thumb Impression
Initials of Certifying
Surgeon
Certifying Surgeon
Form No. 6
Form No. 6
(Prescribed under Rule 24)
Humidity Register
Humidity Register
Hygrometer-----------------------
Distinctive mark or No. _______________
Hygrometer-----------------------
Position in department ________________
Readings of Hygrometer
Date, year, month, day
Between 7 a.m. and 9 a.m.
Between 11 a.m. and 2 p.m. that not in the rest period
Between 4 p.m. and 5.30 p.m.
If no humidity insert none
Remarks
Dry bulb
Wet bulb
Dry bulb
Wet bulb
Dry bulb
Wet bulb
1st
2nd
3rd
4th
5th
6th
7th
8th
9th
10th
11th
12th
13th
14th
15th
16th
17th
18th
19th
20th
21st
22nd
23th
24th
25th
26th
27th
28th
29th
30th
31st
Signed ____________
Signed ____________
Form No. 7
Form No. 7
(Prescribed under Rule 18)
Record of Lime Washing Painting etc.
Record of Lime Washing Painting etc.
Part of Factory e.g. name of room
Parts lime-washed, painted, varnished or oiled e.g., walls,
ceilings, woodworks etc.
Treatment, whether lime washed,
painted, varnished, oiled.
Date on which lime washing,
Painting, varnishing or oiling was carried out (According to the
English Calendar)
Remarks
Date
Month
year
Signature of Manager.
Form No. 7-A
Form No. 7-A
[(Prescribed under Schedule VI to rule, Rule 55 and Rule 58)]
No.
Name and father's name of worker
Designation or nature of work
department
Date when tight clothes provided
Signature or thumb impression of worker
1
2
3
4
5
6
[FORM No. 8]
[FORM No. 8]
(Prescribed under Rule 61)
Report of examination of pressure vessel
1
Name of occupier (of factory).
2
Situation and address of factory.
3
Name, description and distinctive number of pressure vessel.
4
Name and address of manufacturer.
5
Nature of process in which it is used.
6
Nature of process in which it is used.
(a) date of construction.
(b) thickness of walls.
(c) date on which the vessels was first taken into use.
(d) safe working pressure recommended.
(The history should be briefly given and the examiner should
state, whether he has seen the last previous report.)
7
Date of last hydraulic test (if any) and pressure applied.
8
Is the vessel in the open or otherwise exposed to weather or
to damp ?
9
What Parts (if any) were inaccessible ?
10
What examination and tests were made? (Specify pressure if
hydraulic test was carried out.).
11
Condition of vessel (State any defects materially affecting
the safe working pressure or the safe working of the vessel).
External ______________
Internal ______________
12
Are the required fittings and appliances provided in
accordance with the rules for pressure vessel ?
13
Are all fittings and appliances properly maintained and in
good condition ?
14
Repairs (if any) required and period within which they should
be executed and any other condition which the person making the
examination thinks necessary to specify for securing safe
working.
15
Safe working pressure, calculated from dimensions, and from
the thickness and other data ascertained by the present
examination, due allowance being made for conditions of working
if unusual or exceptionally severe (State minimum thickness of
walls measured during the examination).
16
Where repairs affecting the safe working pressure are required
state the working pressure :-
(a) before the expiration of the period specified in (114);
(b) after the expiration of such period if the required
repairs have not been completed;
(c) after the completion of the required repairs.
17
Other observations
Signature ____________________
Qualification _________________
Address _____________________
Date _______________________
[FORM No. 8-A]
[FORM No. 8-A]
(Prescribed under sub-rule (4) of rule 67-F)
Record of Eye Examination
Record of Eye Examination
1
2
3
4
5
6
7
8
9
10
11
Sl No.
department/ works
Name of worker
Sex
Age (on last birthday)
Occupation ---------- Nature Date
of employment.
Examination of eye
sight------------- Date Results.
Signature of opthalmologist
Remarks
[FORM No. 8-B]
[FORM No. 8-B]
(See rule 67-H)
Application for the Site Appraisal Committee
Application for the Site Appraisal Committee
(a) Name of adjoining manufacturing units and human habitats, educational and training institutions, petrol installations, storages of Liquified Petroleum Gas and other hazardous substances, if any, within one kilometer from the proposed unit.
(b) Water sources (rivers, streams, canals, dams, water filtration plants) in the vicinity.
(c) Nearest hospitals, Fire-stations. Civil Defence Stations and Police Stations and their distances.
(d) Details of high tension electrical transmission lines, pipe lines for oil, gas or sewerage, if any, passing through the site, and
(e) Location of railway stations, railway lines, Scheduled road, bye-pass, if any, near the site.
Signature
Designation
Form No. 8-C
Form No. 8-C
[See rules 67-J(1) and 67-L]
Form for Material Safety Data Sheet
Section 111 • The Punjab Factory Rules, 1952
111. Register of accidents and dangerous occurrences.
the-punjab-factory-rules-1952-sec-111.json
•
Section 111
{
"act_title": "The Punjab Factory Rules, 1952",
"act_slug": "the-punjab-factory-rules-1952",
"section_label": "Section",
"section": {
"number": "111",
"title": "111. Register of accidents and dangerous occurrences.",
"chapter": null,
"content": "(a) Name of injured person (if any);\n(b) date of accident or dangerous occurrence;\n(c) date of report on Form No. 18 to Inspector;\n(d) nature of accident or dangerous occurrence;\n(e) date of return of injured person to work; and\n(f) number of days of absence from work of injured person.\n[112. Maintenance of Inspection Book.\n[113. Intimation of the intended closure of Factory.\n(i) the reason for closure;\n(ii) the number of workers on rolls on the date of submission of report;\n(iii) the number of workers likely to be affected by the closure; and\n(iv) the probable period of closure.\n[(v) information as to the Particulars and quantity of chemicals stored and action taken proposed to be taken thereof to ensure safety during such closure.]\n[Form I]\n[Form I]\n[Prescribed under sub-rule (3) of rule 2A].\nApplication for grant of certificate of competency to a person.\nName of the Organisation\nPeriod of service\nDesignation\nArea of responsibility\n(ii) Arrangements for calibrating and maintaining the accuracy of these facilities.\n(a) that in the event of any change in the facilities at my disposal (either addition or deletion) or my leaving the aforesaid organisation, I will promptly inform the Chief Inspector of Factories.\n(b) to maintain the facilities in good working order, calibrated periodically as per manufacturer's instructions or as per National Standards; and\n(c) to fulfil and abide by all the conditions stipulated in the certificate of competency and instructions issued by the Chief Inspector of Factories from time to time.\nSignature\nTo be filled in by the Institution (if employed)\n(a) notify the Chief Inspector of Factories in case the competent person leaves our employment;\n(b) provide and maintain in good order all facilities at his disposal as mentioned above;\n(c) notify the Chief Inspector of Factories any charge in the facilities (either addition or deletion).\nSignature _________________\nDesignation _______________\nTelephone No.\nOfficial Seal\nForm 1-A\nForm 1-A\n[Prescribed under sub-rule (3) of rule 2-A]\nSerial No.\nName and designation\nQualification\nExperience\nStation(s) and the rules under which competency is sought for\n1\n2\n(i) maintain the facilities in good working order, calibrated periodically as per manufacturers instructions or as per National Standards; and\n(ii) to fulfil and abide by all the conditions stipulated in the certificate of competency and instructions issued by the Chief Inspector of Factories from time to time.\nSignature of Head of the Institution or of the persons authorised to sign on his behalf.\nDesignation\nForm No. 1-B\nForm No. 1-B\n[See rule 2-A (3)]\nForm of Certificate of competency issued to a person or an institution in pursuance to sub-rule (3) of rule 2-A\n(i) The tests, examinations and inspections shall be carried out in accordance with the provisions of the Act and the rules made thereunder;\n(ii) The tests, examination and inspections shall be carried out under the direct supervision of the competent persons or by a person so authorised by an institution recognised to be competent person;\n(iii) the certificate of competency shall stand cancelled if the person declared competent leaves the organisation mentioned in his application;\n(iv) the institution recognised as competent person shall keep the Chief Inspector of Factories informed of the names, designations and qualifications of the persons authorised by it to carry out tests, examinations and inspections.\n(v) ............................\n(vi) ...........................\nNote. - \"A separate certificate should be issued under each relevant section. A person or an institution may be recognised competent for the purpose of more than one sections of the Act.\"\nForm No. 1-C\nForm No. 1-C\n(Prescribed under rule 3)\nApplication for Permission\nTo construct, extend or take into use any building as factory\nSignature of Applicant\nNote. - This application shall be accompanied by the following documents:-\n(a) A flow chart of the manufacturing process supplemented by a brief description of the process in its various stages.\n(b) Plans, in duplicate, drawn to scale, showing -\n(i) the site of the factory and immediate surroundings including adjacent buildings and other structures, road, drains, etc., and\n(ii) the plan elevation and necessary cross sections, of the various buildings indicating all relevant details relating to natural lighting, ventilation and means of escape in case of fire. The plans also clearly indicate the position of the plant and machinery, aisles and passage ways; and\n(c) Such other Particulars as the Chief Inspector may require.\nForm No. 1-D\nForm No. 1-D\n(Prescribed under Rule 3)\nName of factory __________________\nParticulars of rooms in the factory\nName of room in factory\nLength in Mt.\nBreadth in Mt.\nDimensions in meter\nBreathing space (contents in cubic\n\t\t\t\tMt.)\nTotal volume of air in the room in cubic Mt\nHeight\nMaximum in Mt\nMinimum Mts\nAverage\nTotal area in sq. Mt.\nFloor area occupied by machinery in the room\nNumber and size of the doors\nVentilation\nWhether the room is to be used as a\n\t\t\t\t work-room or for a storage room\nDate of construction\nRemarks\nNumber and size of window openings\nNumber and size of skylight openings\nTotal area in sq. Mt.\nMaximum capacity of the room\nMaximum number of persons intended to be employed in the room\nSignature of occupier__________\nSignature of manager __________\nQuestionnaire Annexed To\nQuestionnaire Annexed To\nForm No. 1-E\nForm No. 1-E\n(Prescribed under rule 3)\nNote . - The site plan should be drawn to a minimum scale of 12m. = 1 centimetre and the other plans drawn to a minimum scale of 120 cm. = 1 cm.\nNote\n1\n(a) Is the Form No. 1-A submitted filled in for all\n\t\t\t\twork-rooms, godowns, etc., which are proposed to be constructed\n\t\t\t\tor extended ?\n(b) Is the sectional elevation of each room or shed, etc.,\n\t\t\t\tshown separately ?\n(c) Is the minimum height of every room, sheds, etc., shown\n\t\t\t\tclearly in sectional elevation ?\n(d) Is the material of which the roof is constructed indicated\n\t\t\t\tin the sectional elevation ?\n(e) Are the position of various machines fitted or proposed to\n\t\t\t\tbe fitted, shown in drawings together with their names ?\n(f) Are the maximum number of persons working or proposed to\n\t\t\t\tbe working in different rooms, sheds, etc., mentioned in the\n\t\t\t\tdrawing ?\n(g) Are all new buildings, Parts of buildings or alterations\n\t\t\t\tin existing building shown by the boundaries duly marked by a\n\t\t\t\tdistinctive colour ?\n2\nIs the breathing space of a work-room, sheds, etc., calculated\n\t\t\t\tas shown below ?\n(a) Floor area of a room multiplied by height of the room (the\n\t\t\t\tmaximum height for calculation should not exceed 4.2 meter).\n(b) Is the maximum number of persons shown as the lower value\n\t\t\t\tof the two calculations shown below ?\n(i) Floor area of a room less area occupied by machinery in\n\t\t\t\tthe room divided by 36.\n(ii) Breathing space [as in (a) above]. DIVIDED BY 500.\n(c) Is the window and skylight area provided at the minimum\n\t\t\t\trate of 1 sq. meter to every 15 sq. meter of floor area of room ?\nIt is recommended that window and sky light may be provided\n\t\t\t\tone opposite another so as to provide best cross-ventilation.\n3\n3\nDoors-\nDoors-\n(a) Is every work-room provided with at least 2 doors ?\n(b) is the minimum size of every door 1.95 meter x .90 meter ?\n(c) Are all the doors opening outwards ?\n4\n4\nFire escapes -If any\n\t\t\t\tfactory building is of more than one storey -\nFire escapes\n(a) Are two fire-escapes provided on either side of building ?\n(b) Are the fire-escapes accessible from every room in the\n\t\t\t\tbuilding ?\n(c) Is the material used in construction on the fire-escapes\n\t\t\t\tnon- combustible ?\n(d) Are the windows or doors giving access to an external\n\t\t\t\tstaircase arranged to open immediately from inside ?\n5\n5\nLatrines and urinals-\nLatrines and urinals-\n(a) Are the latrines and urinals provided separately ?\n(b) Are these sufficient to meet the requirements of section\n\t\t\t\t19 read with Rules 42 and 47 ?\n(c) Is the minimum distance of the nearest building shown ?\n(d) Is the minimum distance of the nearest well shown ?\n(e) Is the surrounding ground up to a distance of 1.2 meter\n\t\t\t\tall round made of impermeable materials ?\n(f) If the surrounding ground raised to at least 15 centimeter\n\t\t\t\tabove ground level ?\n(g) Is any latrine, ventilator or opening in the proximity of\n\t\t\t\tany opening of main building ?\n(h) Are these latrines flush-type ?\n(i) Are all the drains, pipes, and sewers for carrying\n\t\t\t\tsullage, sewage water, effluent and waste products, running in\n\t\t\t\tfactory premises constructed of impermeable material ?\n(j) Are the drains of flush-type latrines, connected to\n\t\t\t\tdrainage system of the local board ?\n(k) Is an efficient system of septic tanks provided, if no\n\t\t\t\tdrainage system exist ?\n(l) Are the latrines provided with roofing ?\n6\n6\nDrinking Water\nDrinking Water\n(a) Is the drinking water provided from a source provided by\n\t\t\t\tlocal board ?\n(b) Is any well constructed in the premises of the factory for\n\t\t\t\tdrinking water or humidification purposes ?\n(c) Is the cylinder to the well pucca and impervious to water\n\t\t\t\tthroughout and up to a depth not less than the lowest level of\n\t\t\t\tsub-soil water ?\n(d) Are the position of water centres shown in the plans ?\nSignature ____________________\nDesignation __________________\n[ FORM No. 1-F ]\nFORM No. 1-F\n(See rule 4)\nSignature .................................\nQualification ...........................\nAddress ....................................\nIf employed by a company or association, name and address of the company or association.\n[ FORM No. 2 ]\nFORM No. 2\nApplication for registration and grant or renewal of licence for the year a notice of occupation specified in sections 6 and 7\n(to be submitted in triplicate)\n(a) carried on in the factory during the last twelve months (in the case of factories already in existence).\n(b) to be carried on in the factory during the next twelve months (in the case of all factories).\n(ii) Maximum number of workers employed on any one day during the last 12 months.\n(iii) Number of workers to be ordinarily employed in the factory.\n(ii) Maximum amount of Power (H.P.) proposed to be used.\n(i) The Proprietor of the Factory in case of private firm/proprietory concern.\n[(ia) Partners in case of a Partnership firm/concern.]\n(ii) Directors in case of a public limited liability company/firm.\n(iii) Where a Managing Agent has been appointed the name of Managing Agents and Directors thereof.\n(iv) Shareholders in case of a private company, where no Managing Agents have been appointed.\n(v) The Chief Administrative Head in case of a Government or local fund factory.\n(a) Reference number and date of approval of the plans for site whether for old or new building and for construction or extension of factory by the State Government/Chief Inspector.\n(b) Reference number, and date of approval of the arrangements, if any made for the disposal of trade waste and effluents and the name and the authority granting such approval.\n(i) paid in _____________ Treasury on _______ __ vide Challan No. __________ (enclosed).\n(ii) Transmitted by crossed Cheque/Postal Order No. ______________ dated _______________ on the/of the _____________ Bank/Post office drawn in favour of Chief Inspector of Factories.\nSignature of Occupier _______________\nDate _____________\nSignature of Manager _______________\nDate _________________\nNotes. - (1) This form should be completed in ink in block letters or typed.\n(2) If power is not used at the time of filling up this form, but is introduced later, the fact should be communicated to the Chief Inspector immediately.\n(3) If any of the persons named against item 8 is minor the fact should be clearly stated.\n(4) In the case of a factory, where under the proviso to sub-sections (1) and (2) of section 100, a person has been nominated as the occupier, information required in item 8 should be supplied only in respect of that person.\n(5) In the case of a factory where a Managing Agent or Agents have been appointed as occupier under the Indian Companies Act, 1913 (VII of 1913), information required in item 8 should be supplied only in respect of that person or persons.\n[ FORM No. 2-A ]\nFORM No. 2-A\nNotice of change of Manager\n(Prescribed under Rule 15-A)\nForm No. 4\nForm No. 4\n(Prescribed under Rule 8)\nRegistration and Licence to work a Factory\nRegistration and Licence to work a Factory\nChief Inspector of Factories\nDescription of the licensed premises\nDescription of the licensed premises\nDate of renewal\nRenewals\nSignature of Chief Inspector of Factories\nDate of expiry\nDate of transfer\nTransfer\nSignatue of Chief\n\t\t\t\tInspector of Factories\nName of persons to whom transferred\nReasons for Amendment\nDate of Amendment\nChanged category\nAdditional fee\nSignature of Chief Inspector of Factories\nForm No. 5\nForm No. 5\n(Prescribed under Rule 17)\nCertificate of fitness\nCertificate of fitness\n1\nSerial No.\n_______________________________________\nSerial No.\n_______________________________________\nDate\n_______________________________________\nDate\n_______________________________________\n2\nName\n_______________________________________\nI certify that I have personally examined (name)\n3\nFather's name\n_______________________________________\n______________________________________\n______________________________________\n4\nSex\n_______________________________________\nSon/daughter of _________________________________________\n5\nResidence\n_______________________________________ _______________________________________\n_______________________________________\n6\n[Date of birth if available and/or certified age]\n_______________________________________\nresiding at\n_______________________________________ ________________________________\n7\nPhysical fitness\n_______________________________________\n[Who is desirous of being employed in a factory and whose date of birth as produced in the age certificate is _______________________________________ or as nearly as can be \t\t\tascertained from my examination is\t\t\t\t_______________________________________ years and he/she is fit for employment in factory as an adult/child.]\n8\nDescriptive marks\n_______________________________________ _______________________________________ _______________________________________\n9\nReason for\n_______________________________________\n(i) refusal of certificate\n__________________\nHis/her descriptive marks are\n_______________________________________ _______________________________________\n(ii) Certificate being revoked\n_______________________________________ _______________________________________ _______________________________________\nThumb Impression\nThumb Impression\nInitials of Certifying\n\t\t\t\tSurgeon\nCertifying Surgeon\nForm No. 6\nForm No. 6\n(Prescribed under Rule 24)\nHumidity Register\nHumidity Register\nHygrometer-----------------------\nDistinctive mark or No. _______________\nHygrometer-----------------------\nPosition in department ________________\nReadings of Hygrometer\nDate, year, month, day\nBetween 7 a.m. and 9 a.m.\nBetween 11 a.m. and 2 p.m. that not in the rest period\nBetween 4 p.m. and 5.30 p.m.\nIf no humidity insert none\nRemarks\nDry bulb\nWet bulb\nDry bulb\nWet bulb\nDry bulb\nWet bulb\n1st\n2nd\n3rd\n4th\n5th\n6th\n7th\n8th\n9th\n10th\n11th\n12th\n13th\n14th\n15th\n16th\n17th\n18th\n19th\n20th\n21st\n22nd\n23th\n24th\n25th\n26th\n27th\n28th\n29th\n30th\n31st\nSigned ____________\nSigned ____________\nForm No. 7\nForm No. 7\n(Prescribed under Rule 18)\nRecord of Lime Washing Painting etc.\nRecord of Lime Washing Painting etc.\nPart of Factory e.g. name of room\nParts lime-washed, painted, varnished or oiled e.g., walls,\n\t\t\t\t ceilings, woodworks etc.\nTreatment, whether lime washed, \n\t\t\t\tpainted, varnished, oiled.\nDate on which lime washing, \n\t\t\t\tPainting, varnishing or oiling was carried out (According to the\n\t\t\t\tEnglish Calendar)\nRemarks\nDate\nMonth\nyear\nSignature of Manager.\nForm No. 7-A\nForm No. 7-A\n[(Prescribed under Schedule VI to rule, Rule 55 and Rule 58)]\nNo.\nName and father's name of worker\nDesignation or nature of work\ndepartment\nDate when tight clothes provided\nSignature or thumb impression of worker\n1\n2\n3\n4\n5\n6\n[FORM No. 8]\n[FORM No. 8]\n(Prescribed under Rule 61)\nReport of examination of pressure vessel\n1\nName of occupier (of factory).\n2\nSituation and address of factory.\n3\nName, description and distinctive number of pressure vessel.\n4\nName and address of manufacturer.\n5\nNature of process in which it is used.\n6\nNature of process in which it is used.\n(a) date of construction.\n(b) thickness of walls.\n(c) date on which the vessels was first taken into use.\n(d) safe working pressure recommended.\n(The history should be briefly given and the examiner should\n\t\t\t\tstate, whether he has seen the last previous report.)\n7\nDate of last hydraulic test (if any) and pressure applied.\n8\nIs the vessel in the open or otherwise exposed to weather or\n\t\t\t\tto damp ?\n9\nWhat Parts (if any) were inaccessible ?\n10\nWhat examination and tests were made? (Specify pressure if\n\t\t\t\thydraulic test was carried out.).\n11\nCondition of vessel (State any defects materially affecting\n\t\t\t\tthe safe working pressure or the safe working of the vessel).\nExternal ______________\nInternal ______________\n12\nAre the required fittings and appliances provided in\n\t\t\t\taccordance with the rules for pressure vessel ?\n13\nAre all fittings and appliances properly maintained and in\n\t\t\t\tgood condition ?\n14\nRepairs (if any) required and period within which they should\n\t\t\t\tbe executed and any other condition which the person making the\n\t\t\t\texamination thinks necessary to specify for securing safe\n\t\t\t\tworking.\n15\nSafe working pressure, calculated from dimensions, and from\n\t\t\t\tthe thickness and other data ascertained by the present\n\t\t\t\texamination, due allowance being made for conditions of working\n\t\t\t\tif unusual or exceptionally severe (State minimum thickness of\n\t\t\t\twalls measured during the examination).\n16\nWhere repairs affecting the safe working pressure are required\n\t\t\t\tstate the working pressure :-\n(a) before the expiration of the period specified in (114);\n(b) after the expiration of such period if the required \n\t\t\t\trepairs have not been completed;\n(c) after the completion of the required repairs.\n17\nOther observations\nSignature ____________________\nQualification _________________\nAddress _____________________\nDate _______________________\n[FORM No. 8-A]\n[FORM No. 8-A]\n(Prescribed under sub-rule (4) of rule 67-F)\nRecord of Eye Examination\nRecord of Eye Examination\n1\n2\n3\n4\n5\n6\n7\n8\n9\n10\n11\nSl No.\ndepartment/ works\nName of worker\nSex\nAge (on last birthday)\nOccupation ---------- Nature Date \n\t\t\t\tof employment.\nExamination of eye\n\t\t\t\tsight------------- Date Results.\nSignature of opthalmologist\nRemarks\n[FORM No. 8-B]\n[FORM No. 8-B]\n(See rule 67-H)\nApplication for the Site Appraisal Committee\nApplication for the Site Appraisal Committee\n(a) Name of adjoining manufacturing units and human habitats, educational and training institutions, petrol installations, storages of Liquified Petroleum Gas and other hazardous substances, if any, within one kilometer from the proposed unit.\n(b) Water sources (rivers, streams, canals, dams, water filtration plants) in the vicinity.\n(c) Nearest hospitals, Fire-stations. Civil Defence Stations and Police Stations and their distances.\n(d) Details of high tension electrical transmission lines, pipe lines for oil, gas or sewerage, if any, passing through the site, and\n(e) Location of railway stations, railway lines, Scheduled road, bye-pass, if any, near the site.\nSignature\nDesignation\nForm No. 8-C\nForm No. 8-C\n[See rules 67-J(1) and 67-L]\nForm for Material Safety Data Sheet",
"footnote": "",
"is_definition": false,
"sort_order": 571
},
"prev_section": "109",
"next_section": "1"
}