The limits of work inclusive of overtime shall
not exceed those mentioned in Sub-section (4) of Section 64.
5.
64(2)(b)
Ditto
Work performed by furnacement and firemen
Sections 51, 54, 55 and 56
Ditto
6.
64 (2)(d)
Public electricity supply factories generating
electricity in any manner and those engine rooms and boiler
departments generating electricity in any manner for their own
use employing workers on shift
Operation maintenance of (i) Prime movers and
auxiliaries, generators, transformers and switch gears; (ii)
Boilers and auxiliaries.
Sections 51, 52, 54, 55 and 56
(a) The workers shall be allowed to work on
shifts of not longer than eight hours durations
(b) No such worker shall be employed more than
fourteen consecutive days without a compensatory rest period of
at least twenty hours at one time.
(c) No such worker shall be employed so as to
work in excess of any of the limits specified in Sub-section (4)
of Section 61 :
Provided that in the absence of a worker who
has failed to report for duty, a shift worker may be allowed to
work to whole or part of a subsequent shift on condition that -
(i) the next shift of the shift worker shall
not commence before a period of 15 hours has elapsed after the
specified stopping time of the shift to which the worker
belongs;
(ii) the circumstances under which the worker
is required to work in the subsequent shift shall be noted
immediately in the remarks column of the register of adult
workers.
(d) No worker shall be allowed to work more
than 56 hours in any one week except when employed as in proviso
to Clause (c) above, but he shall not be allowed to work for
more than 64 hours in any one week.
7.
64(2)(d)
Electrical receiving stations and substations
or in any factory the department of the factory receiving and
distributing electrical energy for the use of the factory
Operation and maintenance of transformer and
their auxiliaries including receiving and distribution,
switch-gear, lighting arresters, synchronous and other
condensers and rotary and static condensers.
Sections 51, 52, 55 and 56
No worker shall be allowed to work more than 56
hours in any one week except when employed as in the proviso to
Clause (c) above, but he shall not be allowed to work for more
than 64 hours in any one week.
8.
64(2)(d)
Distilleries
Work on the extraction for sugar from various
bases, fermentation of sugar juice and distillation of fermented
wash
Sections 51, 52, 55 and 56
No worker shall be allowed to work more than 56
hours in any one week except when employed as in the proviso to
Clause (c) above, but he shall not be allowed to work for more
than 64 hours in any one week.
9.
64(2)(d)
Sugar Factories
Operation beginning with receiving and
weighment of cane and ending with bagging of sugar where there
is vaccum pan system
Ditto
Ditto
10.
64(2)(d)
Iron and Steel Factories
Operation of blast furnaces, steel melting
furnaces L.T.D., LD.Converters, rolling mills and such other
work which must proceed concurrently with such operations and
must be for technical reason carried on continuously throughout
the day
Ditto
Ditto
11.
64(2)(d)
Coke-oven Plants
Operation of cock-ovens
Ditto
Ditto
12.
64(2)(d)
By product Plants
Recovery and treatment of by-products
Sections 51, 52, 55 and 56
No worker shall be allowed to work more than
fifty-six hours in any one week except when employed as in
proviso to Clause (c) above, but he shall not be allowed to work
for more than 64 hours in any one week
13.
64 (2)(d)
Paper Factories
Work performed by male adult workers on bamboo
preparing plant, digester, strainers and washers, beaters, paper
making machines, super calendar, acid plant, soda recovery
plant, pumping plant, electrolysis plant and bleaching plant,
work of lime reburning, gas producer plant, fibre recovery and
water clarifier
Ditto
Ditto
14.
64 (2)(d)
Cement Factories
All works on continuous process units
Sections 51, 52, 54, 55 and 56
Ditto
15.
64(2)(d)
Aluminium Factories
Ditto
Ditto
Ditto
16.
64(2)(d)
Refractories and Potteries
Workers or polishers in all potteries, mixing,
moulding, drying, setting and operations of kinds including gas
producer
Sections 51, 52, 54, 55 and 56
No worker shall be allowed to work more than
fifty-six hours in any one week except when employed as in
proviso to Clause (c) above, but he shall not be allowed to work
for more than 64 hours in any one week
17.
64(2)(d)
Chemical Factories
All works on continuous process
Ditto
Ditto
18.
64(2)(d)
Vegetable oil hydrogeneration factories
The work viz., refining, bleaching, filtering
generation of hydrogen, hydrogenerating deodourising processes
also compression of oxygen and the cylinder filling
Ditto
Ditto
19.
64(2)(d)
Ice Factories
Work on the manufacturing/handling of ice
Ditto
Ditto
20.
64(2)(d)
Glass Factories
Work of charging and attending to the post or
tanks, attending sheet glass, making machines and fully
automatic other glass making machines and firing the furnace
Ditto
Ditto
21.
64(2)(d)
Oxygen Factories
Engine and plant drivers, oilers and filling of
cylinders
Sections 51, 52, 54, 55 and 56
No worker shall be allowed to work more than
fifty-six hours in any one week except when employed as in
proviso to Clause (c) above, but he shall not be allowed to work
for more than 64 hours in any one week.
22.
64(2)(d)
Acetyline Factories
Generation of gas filling of cylinders
Ditto
Ditto
23.
64(2)(d)
Water works and pumping stations
All works
Ditto
Ditto
24.
64(2)(d)
Ferro-alloys Factories
Operation on electric furnaces
Ditto
Ditto
25.
64(2)(d)
Oil Mills
All works on continuous process
Section 51 • The Orissa Factories (Exemption) Rules, 1983
Section 51, 52, 54, 55, 56 and 61
the-orissa-factories-exemption-rules-1983-sec-51.json
•
Section 51
{
"act_title": "The Orissa Factories (Exemption) Rules, 1983",
"act_slug": "the-orissa-factories-exemption-rules-1983",
"section_label": "Section",
"section": {
"number": "51",
"title": "Section 51, 52, 54, 55, 56 and 61",
"chapter": null,
"content": "The limits of work inclusive of overtime shall\n\t\t\t\t\tnot exceed those mentioned in Sub-section (4) of Section 64.\n5.\n64(2)(b)\nDitto\nWork performed by furnacement and firemen\nSections 51, 54, 55 and 56\nDitto\n6.\n64 (2)(d)\nPublic electricity supply factories generating\n\t\t\t\t\telectricity in any manner and those engine rooms and boiler\n\t\t\t\t\tdepartments generating electricity in any manner for their own\n\t\t\t\t\tuse employing workers on shift\nOperation maintenance of (i) Prime movers and\n\t\t\t\t\tauxiliaries, generators, transformers and switch gears; (ii)\n\t\t\t\t\tBoilers and auxiliaries.\nSections 51, 52, 54, 55 and 56\n(a) The workers shall be allowed to work on\n\t\t\t\t\tshifts of not longer than eight hours durations\n(b) No such worker shall be employed more than\n\t\t\t\t\tfourteen consecutive days without a compensatory rest period of\n\t\t\t\t\tat least twenty hours at one time.\n(c) No such worker shall be employed so as to\n\t\t\t\t\twork in excess of any of the limits specified in Sub-section (4)\n\t\t\t\t\tof Section 61 :\nProvided that in the absence of a worker who\n\t\t\t\t\thas failed to report for duty, a shift worker may be allowed to\n\t\t\t\t\twork to whole or part of a subsequent shift on condition that -\n(i) the next shift of the shift worker shall\n\t\t\t\t\tnot commence before a period of 15 hours has elapsed after the\n\t\t\t\t\tspecified stopping time of the shift to which the worker\n\t\t\t\t\tbelongs;\n(ii) the circumstances under which the worker\n\t\t\t\t\tis required to work in the subsequent shift shall be noted\n\t\t\t\t\timmediately in the remarks column of the register of adult\n\t\t\t\t\tworkers.\n(d) No worker shall be allowed to work more\n\t\t\t\t\tthan 56 hours in any one week except when employed as in proviso\n\t\t\t\t\tto Clause (c) above, but he shall not be allowed to work for\n\t\t\t\t\tmore than 64 hours in any one week.\n7.\n64(2)(d)\nElectrical receiving stations and substations\n\t\t\t\t\tor in any factory the department of the factory receiving and\n\t\t\t\t\tdistributing electrical energy for the use of the factory\nOperation and maintenance of transformer and\n\t\t\t\t\ttheir auxiliaries including receiving and distribution,\n\t\t\t\t\tswitch-gear, lighting arresters, synchronous and other\n\t\t\t\t\tcondensers and rotary and static condensers.\nSections 51, 52, 55 and 56\nNo worker shall be allowed to work more than 56\n\t\t\t\t\thours in any one week except when employed as in the proviso to\n\t\t\t\t\tClause (c) above, but he shall not be allowed to work for more\n\t\t\t\t\tthan 64 hours in any one week.\n8.\n64(2)(d)\nDistilleries\nWork on the extraction for sugar from various\n\t\t\t\t\tbases, fermentation of sugar juice and distillation of fermented\n\t\t\t\t\twash\nSections 51, 52, 55 and 56\nNo worker shall be allowed to work more than 56\n\t\t\t\t\thours in any one week except when employed as in the proviso to\n\t\t\t\t\tClause (c) above, but he shall not be allowed to work for more\n\t\t\t\t\tthan 64 hours in any one week.\n9.\n64(2)(d)\nSugar Factories\nOperation beginning with receiving and\n\t\t\t\t\tweighment of cane and ending with bagging of sugar where there\n\t\t\t\t\tis vaccum pan system\nDitto\nDitto\n10.\n64(2)(d)\nIron and Steel Factories\nOperation of blast furnaces, steel melting\n\t\t\t\t\tfurnaces L.T.D., LD.Converters, rolling mills and such other\n\t\t\t\t\twork which must proceed concurrently with such operations and\n\t\t\t\t\tmust be for technical reason carried on continuously throughout\n\t\t\t\t\tthe day\nDitto\nDitto\n11.\n64(2)(d)\nCoke-oven Plants\nOperation of cock-ovens\nDitto\nDitto\n12.\n64(2)(d)\nBy product Plants\nRecovery and treatment of by-products\nSections 51, 52, 55 and 56\nNo worker shall be allowed to work more than\n\t\t\t\t\tfifty-six hours in any one week except when employed as in\n\t\t\t\t\tproviso to Clause (c) above, but he shall not be allowed to work\n\t\t\t\t\tfor more than 64 hours in any one week\n13.\n64 (2)(d)\nPaper Factories\nWork performed by male adult workers on bamboo\n\t\t\t\t\tpreparing plant, digester, strainers and washers, beaters, paper\n\t\t\t\t\tmaking machines, super calendar, acid plant, soda recovery\n\t\t\t\t\tplant, pumping plant, electrolysis plant and bleaching plant,\n\t\t\t\t\twork of lime reburning, gas producer plant, fibre recovery and\n\t\t\t\t\twater clarifier\nDitto\nDitto\n14.\n64 (2)(d)\nCement Factories\nAll works on continuous process units\nSections 51, 52, 54, 55 and 56\nDitto\n15.\n64(2)(d)\nAluminium Factories\nDitto\nDitto\nDitto\n16.\n64(2)(d)\nRefractories and Potteries\nWorkers or polishers in all potteries, mixing,\n\t\t\t\t\tmoulding, drying, setting and operations of kinds including gas\n\t\t\t\t\tproducer\nSections 51, 52, 54, 55 and 56\nNo worker shall be allowed to work more than\n\t\t\t\t\tfifty-six hours in any one week except when employed as in\n\t\t\t\t\tproviso to Clause (c) above, but he shall not be allowed to work\n\t\t\t\t\tfor more than 64 hours in any one week\n17.\n64(2)(d)\nChemical Factories\nAll works on continuous process\nDitto\nDitto\n18.\n64(2)(d)\nVegetable oil hydrogeneration factories\nThe work viz., refining, bleaching, filtering\n\t\t\t\t\tgeneration of hydrogen, hydrogenerating deodourising processes\n\t\t\t\t\talso compression of oxygen and the cylinder filling\nDitto\nDitto\n19.\n64(2)(d)\nIce Factories\nWork on the manufacturing/handling of ice\nDitto\nDitto\n20.\n64(2)(d)\nGlass Factories\nWork of charging and attending to the post or\n\t\t\t\t\ttanks, attending sheet glass, making machines and fully\n\t\t\t\t\tautomatic other glass making machines and firing the furnace\nDitto\nDitto\n21.\n64(2)(d)\nOxygen Factories\nEngine and plant drivers, oilers and filling of\n\t\t\t\t\tcylinders\nSections 51, 52, 54, 55 and 56\nNo worker shall be allowed to work more than\n\t\t\t\t\tfifty-six hours in any one week except when employed as in\n\t\t\t\t\tproviso to Clause (c) above, but he shall not be allowed to work\n\t\t\t\t\tfor more than 64 hours in any one week.\n22.\n64(2)(d)\nAcetyline Factories\nGeneration of gas filling of cylinders\nDitto\nDitto\n23.\n64(2)(d)\nWater works and pumping stations\nAll works\nDitto\nDitto\n24.\n64(2)(d)\nFerro-alloys Factories\nOperation on electric furnaces\nDitto\nDitto\n25.\n64(2)(d)\nOil Mills\nAll works on continuous process",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
"prev_section": "3",
"next_section": "55"
}