Section 51, 52, 54, 55, 56 and 61

The limits of work inclusive of overtime shall
not exceed those mentioned in Sub-section (4) of Section 64.
5.
64(2)(b)
Ditto
Work performed by furnacement and firemen
Sections 51, 54, 55 and 56
Ditto
6.
64 (2)(d)
Public electricity supply factories generating
electricity in any manner and those engine rooms and boiler
departments generating electricity in any manner for their own
use employing workers on shift
Operation maintenance of (i) Prime movers and
auxiliaries, generators, transformers and switch gears; (ii)
Boilers and auxiliaries.
Sections 51, 52, 54, 55 and 56
(a) The workers shall be allowed to work on
shifts of not longer than eight hours durations
(b) No such worker shall be employed more than
fourteen consecutive days without a compensatory rest period of
at least twenty hours at one time.
(c) No such worker shall be employed so as to
work in excess of any of the limits specified in Sub-section (4)
of Section 61 :
Provided that in the absence of a worker who
has failed to report for duty, a shift worker may be allowed to
work to whole or part of a subsequent shift on condition that -
(i) the next shift of the shift worker shall
not commence before a period of 15 hours has elapsed after the
specified stopping time of the shift to which the worker
belongs;
(ii) the circumstances under which the worker
is required to work in the subsequent shift shall be noted
immediately in the remarks column of the register of adult
workers.
(d) No worker shall be allowed to work more
than 56 hours in any one week except when employed as in proviso
to Clause (c) above, but he shall not be allowed to work for
more than 64 hours in any one week.
7.
64(2)(d)
Electrical receiving stations and substations
or in any factory the department of the factory receiving and
distributing electrical energy for the use of the factory
Operation and maintenance of transformer and
their auxiliaries including receiving and distribution,
switch-gear, lighting arresters, synchronous and other
condensers and rotary and static condensers.
Sections 51, 52, 55 and 56
No worker shall be allowed to work more than 56
hours in any one week except when employed as in the proviso to
Clause (c) above, but he shall not be allowed to work for more
than 64 hours in any one week.
8.
64(2)(d)
Distilleries
Work on the extraction for sugar from various
bases, fermentation of sugar juice and distillation of fermented
wash
Sections 51, 52, 55 and 56
No worker shall be allowed to work more than 56
hours in any one week except when employed as in the proviso to
Clause (c) above, but he shall not be allowed to work for more
than 64 hours in any one week.
9.
64(2)(d)
Sugar Factories
Operation beginning with receiving and
weighment of cane and ending with bagging of sugar where there
is vaccum pan system
Ditto
Ditto
10.
64(2)(d)
Iron and Steel Factories
Operation of blast furnaces, steel melting
furnaces L.T.D., LD.Converters, rolling mills and such other
work which must proceed concurrently with such operations and
must be for technical reason carried on continuously throughout
the day
Ditto
Ditto
11.
64(2)(d)
Coke-oven Plants
Operation of cock-ovens
Ditto
Ditto
12.
64(2)(d)
By product Plants
Recovery and treatment of by-products
Sections 51, 52, 55 and 56
No worker shall be allowed to work more than
fifty-six hours in any one week except when employed as in
proviso to Clause (c) above, but he shall not be allowed to work
for more than 64 hours in any one week
13.
64 (2)(d)
Paper Factories
Work performed by male adult workers on bamboo
preparing plant, digester, strainers and washers, beaters, paper
making machines, super calendar, acid plant, soda recovery
plant, pumping plant, electrolysis plant and bleaching plant,
work of lime reburning, gas producer plant, fibre recovery and
water clarifier
Ditto
Ditto
14.
64 (2)(d)
Cement Factories
All works on continuous process units
Sections 51, 52, 54, 55 and 56
Ditto
15.
64(2)(d)
Aluminium Factories
Ditto
Ditto
Ditto
16.
64(2)(d)
Refractories and Potteries
Workers or polishers in all potteries, mixing,
moulding, drying, setting and operations of kinds including gas
producer
Sections 51, 52, 54, 55 and 56
No worker shall be allowed to work more than
fifty-six hours in any one week except when employed as in
proviso to Clause (c) above, but he shall not be allowed to work
for more than 64 hours in any one week
17.
64(2)(d)
Chemical Factories
All works on continuous process
Ditto
Ditto
18.
64(2)(d)
Vegetable oil hydrogeneration factories
The work viz., refining, bleaching, filtering
generation of hydrogen, hydrogenerating deodourising processes
also compression of oxygen and the cylinder filling
Ditto
Ditto
19.
64(2)(d)
Ice Factories
Work on the manufacturing/handling of ice
Ditto
Ditto
20.
64(2)(d)
Glass Factories
Work of charging and attending to the post or
tanks, attending sheet glass, making machines and fully
automatic other glass making machines and firing the furnace
Ditto
Ditto
21.
64(2)(d)
Oxygen Factories
Engine and plant drivers, oilers and filling of
cylinders
Sections 51, 52, 54, 55 and 56
No worker shall be allowed to work more than
fifty-six hours in any one week except when employed as in
proviso to Clause (c) above, but he shall not be allowed to work
for more than 64 hours in any one week.
22.
64(2)(d)
Acetyline Factories
Generation of gas filling of cylinders
Ditto
Ditto
23.
64(2)(d)
Water works and pumping stations
All works
Ditto
Ditto
24.
64(2)(d)
Ferro-alloys Factories
Operation on electric furnaces
Ditto
Ditto
25.
64(2)(d)
Oil Mills
All works on continuous process