← Back to The Merchant Shipping Act, 1958

316. Issue of load line certificates and effect thereof

[(a) in the case of an existing ship which is of one hundred and fifty tons gross or more or a new ship of twenty-four metres or more in length, and which in either case carries cargo or passengers, a certificate to be called "an international load line certificate";
(aa) in the case of a ship which is exempted under clause (e) or clause (f) of sub-section (3) of section 310, a certificate to be called "an international load line exemption certificate"; and]
(b) in the case of any other ship, a certificate to be called "an Indian load line certificate".
[317. Duration and cancellation of certificates.
(a) the ship ceases to be an Indian ship;
(b) material alterations such as would necessitate the assignment of an increased free board have taken place in the hull or superstructure of the ship;
(c) the fittings and appliances for the protection of openings, the guard rails, freeing ports, or the means of access to the crew's quarters are not maintained in an effective condition;
(d) the structural strength of the ship is lowered to such an extent as to render the ship unsafe;
(e) the certificate is not endorsed to prove that the ship has been surveyed as required under sub-section (5); or
(f) the marking of the deck line and load lines on the ship have not been properly maintained;]
(a) alterations have not been made to the hull or superstructure which would affect the calculations determining the position of the load lines;
(b) the fittings and the appliances for the protection of openings, the guard rails, freeing ports, or the means of access to the crew's quarters are maintained in an effective condition;
(c) the free board marks are correctly and permanently marked; and
(d) the stability information required under section 298 is readily available on board.]
(a) the anniversary date mentioned on the certificate shall be amended by endorsement to a date which shall not be more than three months later than the date on which the survey was completed;
(b) the subsequent annual survey required by sub-section (5) shall be completed using the new anniversary date;
(c) the expiry date of the certificate may remain unchanged provided one or more annual survey is carried out so that the maximum interval between the surveys specified under sub-section (5) is not exceeded.