[Appendix 'A']
[Appendix 'A']
( See rules 53 and 54)
Maharashtra State Electricity Board
Maharashtra State Electricity Board
Annual Budget for 19 ...
(In accordance with section 61 of the Act)
Annual Financial Statement I
Abstract of Capital Receipt and Expenditure
Abstract of Capital Receipt and Expenditure
Sr. No.
Particulars
Actual previous year
Budget estimate current year
For the last 8 months August to March of the
previous year
For the 1st 4 months April to July of the
current year
Revised estimate current year
Budget estimate next year
Explanations for the variation in the actuals
previous year and revised estimate current year
Explanations for the variation in the revised
estimate current year and budget estimate next year
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
A. Receipt
A. Receipt
1.
Opening balance
2.
Subvention from Government (section 63)
3.
Loans from Government (section 64) ( vide Annexure I)
4.
Borrowings under section 65 ( vide Annexure II)
5.
Other Capital Debts and Deposits ( vide Annexure III)
6.
Borrowings from -
(a) Depreciation Reserve
(b) General Reserve etc.
7.
Receipts in connection with scheme of manufacture etc., under
section 20 ( vide Note 1).
8.
Consumers' contributions for service connections
9.
Receipts from sale of plant and equipment and stores
10.
Other items
Total
B. Expenditure
B. Expenditure
Construction Acquisition
1.
Power station and connected works
“
2.
Transmission Lines (including sub-stations)
“
3.
Distribution system (including sub-stations)
“
4.
Expenditure in connection with schemes of manufacture under
section 20
“
5.
Public Lighting
“
6.
Administrative and Residential Buildings
“
7.
Loans and Advances to Licensees (wide Annexure IV)
“
8.
Loans and Advances to the employees (vide Annexure V)
“
9.
Other items (to be specified)
“
10.
Lumpsum for unforeseen
“
Expenses-Total
Closing Balance
Note. - (1) Detailed statement should be added in support of receipts and payments in connection with schemes of manufacture etc., undertaken under section 20 if the number and size of the undertakings justify such a course.
Note.
(2) The main heads under B - Expenditure should be supported with the details under the headings prescribed in Subsidiary Statement VII.
Annexure I
Annexure I
Statement of Loans received from Government under section 64 of the Electricity (Supply) Act, 1948
Statement of Loans received from Government under section 64 of the Electricity (Supply) Act, 1948
(Reference item 3 of Annual Financial Statement I - Capital Receipts)
(Reference item 3 of Annual Financial Statement I - Capital Receipts)
Sr. No.
Particulars of Loans
Balance at the beginning of the 19... 19...
Estimated receipts during 19... 19...
Estimated repayment during 19... 19...
Balance at the end of 19... 19...
Remarks
Rs.
Rs.
Rs.
Rs.
Annexure II
Annexure II
Statement of Borrowing under section 65 of the Electricity (Supply) Act, 1948
Statement of Borrowing under section 65 of the Electricity (Supply) Act, 1948
(Reference item 4 of Annual Financial Statement I - Capital Receipts)
Sr. No.
Description of stocks, bonds, loans, etc.
Total amount outstanding at the commencement of
19... -19...
Estimated borrowing during 19... -19...
Estimated repayments during 19... -19...
Estimated amount outstanding at the end of 19...
-19...
Remarks regarding terms etc. of borrowings
during 19... -19...
Rs.
Rs.
Rs.
Rs.
Rs.
1.
1.
Borrowing guaranteed under section 66 -
Borrowing guaranteed under section 66 -
(a) Bonds
(b) Stocks
(c) Other Borrowings (to be specified)
Total
2.
2.
Borrowing not guaranteed -
Borrowing not guaranteed -
(a) Bonds
(b) Stock
(c) Other Borrowings (to be specified)
Total
Grand Total - 1 and 2
Note. - Maximum amount of loan fixed by the State Government under section 65(3) of the Electricity (Supply) Act.
Note.
Annexure III
Annexure III
Statement of Debt and Deposits Transactions
Statement of Debt and Deposits Transactions
(Reference item 5 of Annual Financial Statement I - Capital Receipts)
Sr. No.
Particulars
Total amount outstanding at the 19.. -19..
Estimated receipts 19.. -19..
Estimated repayments 19.. -19..
Net receipts repayments 19.. -19..
Estimated amount outstanding 19.. -19..
Remarks
Rs.
Rs.
Rs.
Rs.
Rs.
I.
I.
Debt -
Debt -
Provident Funds (where provident funds are managed by the
Board).
II.
II.
Deposits. -
Deposits. -
(1) Public works deposits
(2) Security deposits from consumers
(3) Security deposits from contractors
(4) Other deposits (to be specified)
Annexure IV
Annexure IV
Statement of Loans and Advances to Licensees under section 23 of the Electricity (Supply) Act, 1948
Statement of Loans and Advances to Licensees under section 23 of the Electricity (Supply) Act, 1948
(Reference item 7 of Annual Financial Statement I- Capital Expenditure)
Sr. No.
Name of Licensee
Particulars of loans and advances
Total amount outstanding at the commencement of
19.. -19..
Estimated payment during 19.. -19..
Estimated receipts during 19.. -19..
Net payment receipts during 19.. -19..
Estimated amount outstanding at the end of 19..
19..
Remarks
Rs.
Rs.
Rs.
Rs.
Rs.
Annexure V
Annexure V
Statement of Loans and Advances to Employees
Statement of Loans and Advances to Employees
(Reference item 8 of Financial Statement I - Capital Expenditure)
Sr. No.
Particulars
Total amount outstanding at the commencement of
19.. -19..
Estimated payment during 19.. -19..
Estimated receipts during 19.. -19..
Net payment receipts during 19.. -19..
Estimated amount outstanding at the end of 19..
-19..
Remarks
Rs.
Rs.
Rs.
Rs.
Rs.
I.
I.
Advances bearing interest -
Advances bearing interest -
(1) House building
(2) Purchase of motor conveyances
(3) Purchase of other conveyances
(4) Other advances (to be specified)
II.
II.
Advances not bearing interest -
Advances not bearing interest -
(1) Advances of T. A.
(2) Advances of Pay
(3) Festival Advances
(4) Other Advances (to be specified)
Annual Financial Statement II
Annual Financial Statement II
Abstract of Revenue Receipt and Expenditure
Abstract of Revenue Receipt and Expenditure
Sr. No.
Particulars
Actual previous year
Budget estimate current year
Actuals
Revised estimate current year
Budget estimate next year
Explanations for the variation in the actuals
previous year and revised estimate current year
Explanations for the variation in the revised
estimate current year and budget estimate next year
For the last 8 months August to March of the
previous year
For the 4 months April to July of the current
year
(1)
(2)
(3)
(4)
(5)(a)
(5)(b)
(6)
(7)
(8)
(9)
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
A.
A.
Receipt
Receipt
1.
From sale of electricity
2.
Miscellaneous revenue from consumers
3.
Revenue from trading
4.
Other revenues (to be specified)
(i) Sale of steam
(ii) Repair of lamps and other apparatus
(iii) Commission for collection of electricity duty etc.
5.
Receipts in connection with schemes of manufacture undertaken
under section 20 ( vide Note 2 below).
Deduct
Deduct
B.
B.
Expenditure (Operation and Maintenance) General Works Cost
-
Expenditure (Operation and Maintenance) General Works Cost
-
1.
(a) Hydro
(b) Thermal/Diesel
(The works cost to be worked out
as prescribed in the 8th Schedule to the Electricity Supply Act.
1948 excluding depreciation and interest).
2.
Power purchased
3.
Transmission (extra high voltage) (operation and
maintenance).
4.
Distribution (High, medium and low voltage) operation and
maintenance.
5.
Public lighting (Operation, maintenance and renewals).
6.
Consumers servicing etc.
7.
Expenditure in connection with schemes of manufacture etc.,
under section 20 (vide Note 2).
8.
Administration and general expenses ( vide Note 1).
9.
Other charges (to be specified).
10.
Provision for unseen expenses.
Total
Net Surplus/Deficit from trading
Note. - (1) Details of administrative expenditure should be shown in a separate statement in a form similar to account subsidiary Statement X of Appendix B.
Note.
(2) Detailed statement should be added in support of receipts and payments in connection with schemes of manufacture etc., undertaken under section 20 if the number and size of the undertaking justify such course.
Annual Financial Statement III
Annual Financial Statement III
Abstract of Net Revenue Surplus
Abstract of Net Revenue Surplus
Sr. No.
Particulars
Actual previous year
Budget estimate current year
Actuals
Revised estimate current year
Budget estimate next year
Explanations for the variation in the actuals
previous year and revised estimate current year
Explanations for the variation in the revised
estimate current year and budget estimate next year
For the last 8 months August to March of the
previous year
For the 4 months April to July of the current
year
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Consolidated net surplus/deficit from trading
(E/F from Statement II).
Consolidated net surplus/deficit from trading
(E/F from Statement II).
Add. -
Add. -
(i) Interest on securities and investments.
(ii) Rent receivable on property.
(iii) Subvention from Government.
Deduct. -
Deduct. -
1.
Transfer to taxation reserve.
2.
Interest on Bonds not guaranteed under section 66.
3.
Interest on Stock not guaranteed under section 66.
4.
Credits to depreciation reserve.
Deduct. -
Deduct. -
5.
Interest on Bonds guaranteed
under section 66.
6.
Interest on Stock guaranteed under section 66.
7.
Interest on sums paid by (tie State Government guaranteed
under section 66.
8.
The write down of amounts paid from capital under proviso to
section 59.
9.
The write down of amounts in respect of intangible assets.
10.
Contribution to General Reserve.
11.
Interest on loans from Government including arrears.
12.
Contribution to Tariff Reserve.
13.
Contribution to Development Reserve.
14.
Contribution to the Consolidated Fund of the State.
Annual Financial Statement IV
Annual Financial Statement IV
Schedule of Staff for the year 19 ........ 19...........
Schedule of Staff for the year 19 ........ 19...........
Sr. No.
Name of the office and designation of the post
Time Scale if any
Number of posts sanctioned in that time scale
Provision for the year based on the pay drawn
Allowances
Total provisions for the year for allowances
Remarks
Dearness allowances
Compensatory and other allowances
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
Rs.
Rs.
Rs.
Rs.
Rs.
Note. - The total provision proposed in columns 5 and 8 should agree with the provisions for pay and allowances included under the various heads in Statement II.
Note.
[Appendix B]
[Appendix B]
( see rule 56)
Maharashtra State Electricity Board
Balance Sheet as on 31st March .......
Balance Sheet as on 31st March .......
Previous Year
Liabilities
Reference to Schedule
Current Year
Previous Year
Assets
Reference to Schedule
Current Year
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
Rs.
Rs.
Rs.
Rs.
Capital Liabilities -
Capital Liabilities -
Share Capital -
Share Capital -
Fixed Assets -
Fixed Assets -
[a] By conversion of existing
loans (.......equity shares of Rs....... each)
[a] Capital amount expended on
assets in use
10 (Part I)
[b] By fresh investment
(.......equity share of Rs...... each)
[b] Written down cost of obsolete
and unserviceable assets
10 (Part II)
Loans from State Government
1
Less accumulated provision for
depreciation
Loans from others
2
Capital works in progress
including capitalised interest charges
10 (Part III)
Reserves and Surplus -
Reserves and Surplus -
Investments Current Assets -
Investments Current Assets -
11
(i) General Reserve
3
[a] Other operating stores
12
(ii) Capital Reserve
4
[b] Capital stores for specific
projects
10-A
(iii) Consumer's contribution
5
[c] Loans and advances
14
(iv) Other reserves
6
[d] Sundry debtors
13
Less provision for bad and
doubtful debts
A. Current liabilities Other
liabilities
7
[e] Other receivables
15
B. Provisions -
8
[f] Cash and Bank balances
16
Provision for income tax payable
Miscellaneous Expenses -
Miscellaneous Expenses -
Provision for dividend on share
capital.
9
[i] Deferred Revenue Expenditure
18
Other provisions
[ii] Intangible assets of capital
nature
17
Total
Total
Notes. -
Notes.
(1) Maximum borrowing power under section 65(3) of the
Electricity (Supply) Act, 1948
(2) Contingent liabilities
25
State Electricity Board
State Electricity Board
Revenue Account for the year ended on 31st March............
Revenue Account for the year ended on 31st March............
Previous Year
Particulars
Reference to Schedule
Current Year
Previous Year
Particulars
Reference to Schedule
Current Year
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
Rs.
Rs.
Rs.
Rs.
To Expenditure on Operation of Generating Stations
19
By sale of power
20
To cost of fuel
19
By Miscellaneous Revenue from customers
21
To power purchased
19
By Revenue from Trading
20
To Salaries and Wages etc.
19
By Interest on Loans and Investments
20
To Repair and Maintenance
19
By Commission on collection of electricity duty
20
To General Administration Expenses
22
By Commission on collection
20
To Depreciation (excluding that on general assets which is
included in General Administration Expenses)
10
By Miscellaneous Receipts
To expenses of earlier period paid during the year
26
By income of earlier years received during the year
26
To recoupment to capital on account of shortfall of O. &
M. expenditure met therefrom in previous year/years
By recoupment of shortfall of O. & M. expenses met from
capital
To contribution to pension fund
To net surplus carried over to net revenue and appropriation
account
Total
Total
Notes. - (1) Shortfall of O. & M. expenses amounting to Rs met from capital.
Notes.
(2) Shortfall of O. & M. expenses amounting to Rs met from capital during the year recouped this year.
State Electricity Board
State Electricity Board
Net Revenue and Appropriation Account for the year ended on 31st March..........
Net Revenue and Appropriation Account for the year ended on 31st March..........
Previous Year
Particulars
Reference to Schedule
Current Year
Previous Year
Particulars
Reference to Schedule
Current Year
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
Rs.
Rs.
Rs.
Rs.
To intangible assets written off
19
By net surplus from Revenue Account
To interest on loans/bonds etc., other than Government loans
23
By subvention from State Government
24
To interest on State Government loans
23
To repayment of interest paid by State Government under
section 66 on behalf of Electricity Board.
To contribution to development rebate
4
To contribution to Investment Allowance Reserve
4
To transfer to Taxation Reserve
5
To contribution to General Reserve
3
To contribution to Sinking Fund
6
To proposed dividend on share capital
To appropriation of balance or Development Fund
Total
Total
State Electricity Board
State Electricity Board
Schedule 1 - Forming Part of the Balance Sheet Details of Government Loans Interest
Sr. No.
Particulars
Code Head
Rate of interest
Opening Balance as on 1st April
Amount received during the year
Payment made during the year
Closing Balance on 31st March
Amount of interest for the year
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
1.
Loans from State Government under section 60 of the
Electricity (Supply) Act, 1948.
1001
2.
Loans from the State Government under section 64 of the
Electricity (Supply) Act, 1948.
1002
Total
State Electricity Board
State Electricity Board
Schedule 2 - Forming Part of the Balance Sheet Details of Loan from other sources
Maximum Borrowing Limit...........
Sr. No.
Particulars
Code Head
Rate of interest
Opening Balance as on 1st April
Amount received during the year
Payment made during the year
Closing Balance on 31st March
Amount of interest for the year
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
1.
Loans from Life Insurance Corporation
1003
2.
Loans from Rural Electrification Corporation
1004
3.
Debentures/Bonds
1005
4.
Loans from Agriculture Finance Corporation
1006
5.
Loans from Agriculture Refinance Corporation
1007
6.
Other loans
1008
Total
Note. - Loans will be grouped under the following three sub-heads :-
Note.
(i) Unsecured and Unguaranteed Loans.
(ii) Loans secured by mortgage of fixed and floating assets.
(iii) Loans guaranteed by the State Government under section 66 of Electricity (Supply) Act, 1948.
State Electricity Board
State Electricity Board
Schedule 3 - Forming Part of the Balance Sheet
Details of General Reserve
Details of General Reserve
Sr. No.
Particulars
Code Head
Opening Balance as on 1st April
Addition during the year
Total
Total Withdrawals during the year
Total
Closing Balance as on 31st March
Remarks
Appropriation during the year
Transfer of Profit on sale of assets
Transfer of loss on sale of assets
Other withdrawals
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
1.
General Reserve
1102
State Electricity Board
State Electricity Board
Schedule 4 - Forming Part of the Balance Sheet
Details of Capital Reserve
Details of Capital Reserve
Sr. No.
Particulars
Code Head
Opening Balance as on 1st April
Addition during the year
Withdrawal during the year
Closing Balance as on 31st March
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
1.
Other Capital Receipts
110105
2.
Development Rebate Reserve
1103
3.
Investment Allowance Reserve
1118
4.
Subvention from State Government
1110
State Electricity Board
State Electricity Board
Schedule 5 - Forming Part of the Balance sheet
Details of Consumers Contribution
Details of Consumers Contribution
Sr. No.
Particulars
Code Head
Opening Balance as on 1st April
Addition during the year
Withdrawal/ Adjustment during the year
Closing Balance as on 31st March
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
1.
Consumers contribution for service connections and lines
110101
2.
Contribution for assisted wiring
110102
3.
Contribution for assisted industrial schemes
110103
4.
Contribution for deep Tube-well Irrigation Schemes
110104
Total
State Electricity Board
State Electricity Board
Schedule 6 - Forming Part of the Balance Sheet
Details of other reserves
Details of other reserves
Sr. No.
Particulars
Code Head
Opening Balance as on 1st April
Addition during the year
Withdrawal/ Adjustment during the year
Closing Balance as on 31st March
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
1.
Sinking fund for redemption of debentures/ bonds
1105
2.
Development Fund
1104
3.
Other reserves (Details to be specified)
State Electricity Board
State Electricity Board
Schedule 7 - Forming Part of the Balance Sheet
Details of Sundry Creditors
Details of Sundry Creditors
Sr. No.
Particulars
Code Head
Balance as on 31st March (Current year)
Balance as on 31st March (Previous year)
(1)
(2)
(3)
(4)
(5)
1.
Sundry creditors for capital equipment Part A
1201
2.
Sundry creditors for supply material
1202
3.
Sundry creditors for supply of power
1203
4.
Electricity duty payable to State Government
1211
5.
Excise duty on generation payable to Central Government
1212
6.
Interest on loans payable to State Government
1213071
7.
Sundry creditors and others
1204
Total
Part B
Details of amount payable to sister Boards and other Public Sector Undertakings should be given.
State Electricity Board
State Electricity Board
Schedule 8 - Forming Part of the Balance Sheet
Details of other liabilities
Details of other liabilities
Sr. No.
Particulars
Code Head
Balance as on 31st March (Current year)
Balance as on 31st March (Previous year)
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
1.
Consumer Security Deposit in cash
120501
2.
Security Deposits from suppliers/contractors
1206
3.
Security Deposits from employees in cash
120701
4.
Deposits for execution of works
1208
5.
Advances from customers for supply of material
1209
6.
Excise or Generation payable to Central Government
1212
7.
Interest accrued and due on loans and advances
1213
8.
Unpaid wages and Bonus
1214 1226
9.
Security and other Deposits (other than in cash)
120502 120702
10.
Temporary accommodations and overdrafts and Government
advances redeemable
1216
11.
Interest accrued but not due on loans and advances
1220
12.
Suspense Heads
1228 1229 1230
13.
Other miscellaneous liabilities
1215 1217 1218 1219 1221 1223 1224 1227
14.
Provision for losses pending investigation
1225
Total
State Electricity Board
State Electricity Board
Schedule 9 - Forming Part of the Balance Sheet
Details of provisions made
Details of provisions made
Sr. No.
Particulars
Code Head
Opening Balance
Addition during the year
Total
Withdrawals/ Adjustment during the year
Balance at the close of the year
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
1.
General Provident Fund
1111
2.
Contributory Provident Fund
1112
3.
Staff Benevolent Fund
1113
4.
Pension Reserve
1114
(i) From Revenue
(ii) From Capital
5.
Retirement Gratuity Reserve
1115
Total
State Electricity Board
State Electricity Board
Schedule 10 - Forming Part of Balance Sheet
Part I
Details of Fixed Assets and Depreciation thereof
Details of Fixed Assets and Depreciation thereof
Sr. No.
Particulars
Code Head
Original Cost
Cost as on 1st April
Additions during the year
Transfers and adjustments during the year
Balance as on 31st March
(1)
(2)
(3)
(4)
(5)
(6)
(7)
1.
Assets in use
A. Hydraulic Power Plant
A. Hydraulic Power Plant
1.
Land and rights
2.
Buildings and Civil Engineering Works
3.
Plant and Machinery in generating stations
4.
Hydraulic works forming Part of a hydro-electricity system
5.
Switchgear including cable connections
6.
Lightning arrestors
7.
Transport equipment
8.
Miscellaneous equipment
Total - Hydraulic Power Plant
B. Steam Power Plant
B. Steam Power Plant
1.
Land and Rights
2.
Buildings and Civil Engineering Works
3.
Plant and Machinery in generating stations
4.
Cooling towers and circulating water system
5.
Boiler plant and equipment including plant foundations
6.
Switchgear including cable connections
7.
Lightning arrestors
8.
Miscellaneous equipment
Total - Steam Power Plant
C. Internal Combustion Power Plant
C. Internal Combustion Power Plant
1.
Land and rights
2.
Buildings and Civil Engineering Works
3.
Plant and Machinery in generating stations
4.
Cooling towers and circulating water systems
5.
Switchgear including cable connections
6.
Lightning arrestors
7.
Miscellaneous equipment
Total - Internal Combustion Power Plant
D. Transmission (HV and EHV)
D. Transmission (HV and EHV)
1.
Land and rights
2.
Buildings and Civil Engineering Works
3.
Sub-station transformers, transformers kiosks, substations
equipment and other fixed apparatus including plant foundations
4.
Switchgear including cable connections
5.
Lightning arrestors
6.
Underground cables
7.
Towers pole fixtures, overhead conductors and devices
8.
Miscellaneous equipment
Total - Transmission Plant
E. Distribution (HV)
E. Distribution (HV)
1.
Land and rights
2.
Buildings and Civil Engineering Works
3.
Sub-station transformers, transformers kiosks, substations
equipment and other fixed apparatus including plant foundations
4.
Switchgear including cable connections
5.
Lightning arrestors
6.
Underground cables
7.
Towers, poles fixtures, overhead conductors and devices
8.
Service equipment
9.
Metering equipment
10.
Miscellaneous equipment
Total - Distribution (HV)
F. Distribution (M & LV)
F. Distribution (M & LV)
1.
Land and rights
2.
Buildings and Civil Engineering Works
3.
Sub-station transformers, transformers kiosks, sub station
equipment and other fixed apparatus including plant foundations
4.
Switchgear including cable connections
5.
Towers, poles, fixtures, overhead conductors and devices
6.
Lightning arrestors
7.
Underground cables
8.
Service lines
9.
Metering equipment
10.
Miscellaneous equipment
Total-Distribution (M & LV)
G. Public Lighting Equipments
G. Public Lighting Equipments
1.
Street lighting and signal system
Total - Public Lighting
H. General equipment
H. General equipment
1.
Land and rights
2.
Building and Civil Engineering Works
3.
Office furniture and equipment
4.
Transportation equipment
5.
Laboratory and meter testing equipment
6.
Workshop plant and equipment
7.
Tools and works equipment
8.
Communication equipment
9.
Air-conditioning plant
10.
Miscellaneous equipment
Total - General Equipment
I. Wiring and Sales Equipment
I. Wiring and Sales Equipment
1.
Land and rights
2.
Buildings and Civil Engineering
3.
Office furniture and equipment
4.
Showroom equipment
5.
Demonstration equipment
6.
Miscellaneous
Total -Wiring and Sales Equipment
J. Manufacture and Electrical Plant
J. Manufacture and Electrical Plant
1.
Land and rights
2.
Buildings and Civil Engineering Works
3.
Office furniture and equipment
4.
Transportation equipment
5.
Tools and works equipment
6.
Communication equipment
7.
Miscellaneous equipment
Total - Manufacture of Electric Plant.
Total of Capital Assets Issue.
Depreciation
Depreciation as on 31st March Code Head 1221
Net cost as on 31st March
Previous year
Depreciation as on 1st April Code Head 1221
Depreciation during the year
Adjustments and arrears depreciation for earlier
period
Amount withdrawn during the year
(8)
(9)
(10)
(11)
(12)
(13)
(14)
State Electricity Board
State Electricity Board
Schedule 10
Part II
Statement showing written down cost of Obsolete Unserviceable Fixed Assets on which no further depreciation shall be allowed as a charge on the Revenue for the year ended 31st March ..............
Statement showing written down cost of Obsolete Unserviceable Fixed Assets on which no further depreciation shall be allowed as a charge on the Revenue for the year ended 31st March ..............
Sr. No.
Particulars of Assets under Major Heads of A/c
Balance of written down cost of assets at the
beginning of the year
Additions during the year
Written down cost of assets sold during the year
Amount realised from the sale of obsolete etc.,
the assets during the year
Loss/ profit on sale of obsolete etc., assets
during the year transferred to general reserve (Schedule 3)
Balance written down cost at the end of the year
(3-4-5)
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
1.
2.
3.
4.
5.
6.
7.
and so on
State Electricity Board
State Electricity Board
Schedule 10
Part III
Enclosure to the Balance Sheet Statement of Works in progress for the year ended on 31st March........
Enclosure to the Balance Sheet Statement of Works in progress for the year ended on 31st March........
Sr. No.
Particulars of assets
Balance at the beginning of the year
Materials plant and equipment including civil
works and advances
Salaries and wages
Proportion of Administration and Management
expenses
Interest capitalised in any
Total (4+5+6+7)
Value transferred to assets in use
Balance at the end of the year (3+8-9)
1
2
3
4
5
6
7
8
9
10
1.
Generating Power Plants -
A. Hydraulic
B. Steam
C. Gas Turbine
D. Internal Combustion
2.
Transmission (including substations switching stations,
switchgears etc.)
3.
Distribution (including sub-stations switching stations,
switchgears etc.)
A. High Voltage
B. Medium and Low Voltage
C. Public Lighting
Total (A+B+C)
4.
General Equipment
Grand Total
State Electricity Board
State Electricity Board
Schedule 10-A - Forming Part of the Balance Sheet
Details of Capital Stores for specific projects
Details of Capital Stores for specific projects
Sr. No.
Name of Project
Cost of Stores at the close of the year
(1)
(2)
(3)
State Electricity Board
State Electricity Board
Schedule 11 - Forming Part of the Balance Sheet
Sr. No.
Particulars
Code Head
Opening Balance as on 1st April
Additions during the year
Adjustment retirements during the year
Closing Balance as on 31st March
Remarks
Face value
Market Value
Cost
Face value
Market Value
Cost
Face value
Market Value
Cost
Face value
Market Value
Cost
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
1.
Investments in Government securities
0701
(i) (ii) (iii) (iv) (v) and so on
2.
Investments in bonds raised by other Electricity Boards and
shares of Corporation and Public Ltd. companies :
0702
(i) (ii) (iii) (iv) (v) and so on
3.
Other Investments
0703
(i) (ii) (iii) (iv) (v) and so on
Note. - The fact whether quoted or unquoted should also be indicated in the Schedule.
Note.
State Electricity Board
State Electricity Board
Schedule 12 - Forming Part of Balance Sheet Details of Stores in Stock
Sr. No.
Particulars
Code Head
Opening Balance as on 1st April
Purchases during the year and adjustments
Issues during the year and adjustments
Closing Balance as on 31st March
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
1.
Other Operating Stores
050102
2.
Manufactured components not transferred for stores
0502
3.
Stores in transit
0513
4.
Stores pending inspection
0514
5.
Stores issued on Loans
0515
6.
Stores issued to fabricators
0516
7.
Scrap
050103
Total
State Electricity Board
State Electricity Board
Schedule 13 - Forming Part of Balance Sheet
Details of Sundry Debtors
Details of Sundry Debtors
Sr. No.
Particulars
Code Head
Balance as on 31st March
Balance as on 31st March
Remarks
Current year balance
Less provision for bad debts
Net balance
Previous year balance
Less provision for bad debts
Net balance
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
Part A
Part A
1.
Sundry Debtors for supply of power etc.
0507
2.
Sundry Debtors for Electricity Duty
0508
3.
Sundry Debtors and others
0509 0510
4.
Sundry Debtors for interest due on securities, Bank Drafts
and other investments
0511
5.
Amount recoverable from employees
0517 and 0518
Total
State Electricity Board
State Electricity Board
Schedule 14 - Forming Part of the Balance Sheet
Details of Loans and Advances
Details of Loans and Advances
Sr. No.
Particulars
Code Head
Balance as on 31st March (Current Year)
Balance as on 31st March (Previous Year)
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
Part A
1.
Advances to licensees
0601
2.
Advances to staff not bearing interest
0601
3.
Advances to staff bearing interest
0603
4.
Advances to suppliers for Capital Stores/Contracts
0606 0607
5.
Advances to suppliers for operating stores
0605 0608
6.
Advances with clearing agent
0609
7.
Deposits with Customs, Port Trust and Excise authorities
0610 0611 0612
8.
Other Advances (details to be specified)
0604
Total..
Part B
Details of loans and advances to sister Boards and other public sector undertakings should be given.
State Electricity Board
State Electricity Board
Schedule 15 - Forming Part of the Balance Sheet
Details of other receivables
Details of other receivables
Sr. No.
Particulars
Code Head
Balance as on 31st March (Current Year)
Balance as on 31st March (Previous Year)
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
1.
Material Suspense Account including shortages, in transit and
stock
050301 0504 0505 & 0506
2.
Accrued income
0512
3.
Claims recoverable
0613
4.
Securities other than in cash per contract
0614
5.
Prepaid expenses
0615
6.
Inter-unit transfers
050305, 050306
7.
Income Tax paid in advance
0616
8.
Income Tax deducted at source
0617
Total ...
State Electricity Board
State Electricity Board
Schedule 17 - Forming Part of the Balance Sheet
Details of Intangible Assets
Details of Intangible Assets
Sr. No.
Particulars
Code Head
Balance as on 31st March (Previous year)
Additions during the year
Adjustment during the year
Balance as on 31st March (Current year)
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
1.
Fees and expenses for the formation of Board
0301
2.
Office expenses incidental to organising the Board
0302
3.
Discount on stocks. Bonds etc., is sued
0303
4.
Expenses incurred on raising finance
0304
5.
Other expenses
0305
Total
State Electricity Board
State Electricity Board
Schedule 18 - Forming Part of the Balance Sheet
Details of Deferred Revenue Expenditure
Details of Deferred Revenue Expenditure
Sr. No.
Particulars
Code Head
Opening balance as on 31st April
Addition during the year
Adjustment during the year
Balance as on 31st March
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
1.
Deferred Revenue Expenditure
0902
State Electricity Board
State Electricity Board
Schedule 19 - Forming Part of the consolidated Revenue and Expenditure Account
Abstract of Revenue Expenditure
Abstract of Revenue Expenditure
Sr. No.
Particulars
Code Head
Hydraulic power generation
Thermal power generation
Internal combustion power generation
Transmission (HEH & HV)
Distribution (HV)
Distribution (M & LV)
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
1.
Expenditure on operation of generating stations
300101-03 300201-03 300301-03
2.
Cost of fuel
300206 300306
3.
Salaries and wages
300104 05, 11 & 20 etc.
4.
Repair and Maintenance
300112 13, 14, 15, 17, 18, 19, 21,
27 etc.
Total
6.
Depreciation
As per Schedule 10
7.
Total
8.
General Administration Expenses
As per Schedule 22
9.
Total
10.
Share of interest charges
As per Schedule 23
11.
Share of intangible assets written off
12.
Total
13.
Previous year's figures
Sr. No.
Particulars
Code Head
Public Lighting
Consumer servicing and meter reading
Expenditure on assisted wiring, coil sales, hire
purchase of apparatus
Expenditure on Manufacture of Electrical
equipments
Total
Previous year figures
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
1.
Expenditure on operation of generating stations
300101-03 300201-03 300301-03
2.
Cost of fuel
300206 300306
3.
Salaries and wages
300104 05, 11 & 20 etc.
4.
Repair and Maintenance
300112 13, 14, 15, 17, 18, 19, 21,
27 etc.
Total
6.
Depreciation
As per Schedule 10
7.
Total
8.
General Administration Expenses
As per Schedule 22
9.
Total
10.
Share of interest charges
As per Schedule 23
11.
Share of intangible assets written off
12.
Total
13.
Previous year's figures
State Electricity Board
State Electricity Board
Schedule 20 - Forming Part of the Consolidated Revenue and Expenditure Account
Details of Revenue from sale of power to various categories of consumers
Details of Revenue from sale of power to various categories of consumers
Previous Year
Particulars of Revenue
Code Head
Current Year
Units sold MK WH
Income Rs.
Units sold MK WH
Income Rs.
1.
Domestic and Residential -
(a) Lights and Fans
200101
(b) Small Power
200102
(c) Combined load
100103
2.
Commercial
(a) Lights and Fans
200201
(b) Small Power
200202
(c) Combined load
200203
3.
Industrial -
(a) Low and Medium Voltage
200301
(b) High and Extra High Voltage
200302
4.
Public-Lighting -
2004
5.
Traction -
(a) Traction-Tramways
200501
(b) Traction-Electric Railways
200502
6.
Irrigation -
2006
7.
Public Water Works and Sewage Pumping -
2007
8.
Supplies in bulk to controlled stations -
2008
9.
Supplies in bulk to other State licensees etc. -
10.
Supplies in bulk to others -
2010
Total
State Electricity Board
State Electricity Board
Schedule 21 - Forming Part of the Consolidated Revenue and Expenditure Account
A. Details of other Income
A. Details of other Income
Previous Year Rs.
Particulars
Code Head
Current Year Rs.
(1)
(2)
(3)
(4)
1.
Miscellaneous Revenue from customers -
(a) Rent of meters
2101
(b) Public lighting maintenance charges
2102
(c) Other Receipts
2103
2.
Revenue from Trading -
(a) Sale of Electrical Plant manufactured by the Board
2201
(b) Sale, hire purchase, or hire of apparatus and wiring
2202
(c) Sale of stores
2203-01
(d) Sale of scrap
2203-02
(e) Other Miscellaneous Receipts
2205
3.
Interest on Loans and Investments -
(a) Interest on securities
2301
(b) Interest on Bank Deposits
2302
(c) Interest on other investments
2303
(d) Interest on Loans and Advances to licensees
2304
(e) Interest on Loans and Advances to staff
2305
4.
Miscellaneous Receipts -
(a) Sale of Steam
2501
(b) Income from Rents
2504
(c) Other Miscellaneous Income
2502-03 & 2505
5.
Commission for collection of Electricity Duty
2401
Total
State Electricity Board
State Electricity Board
Schedule 22 - Forming Part of the Consolidated Revenue and Expenditure Account
Details of General Administration Expenses
Details of General Administration Expenses
Sr. No.
Particulars
Total Expenses
Apportioned to capital work
Net Chargeable to Revenue Account
Hydraulic Power Plant
Steam Power Plant
Internal Combustion Power Plant
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
1.
Pay and allowances of officers and staff
2.
Travelling expenses, including Travel Concessions
3.
Medical expenses
4.
Provident Fund
5.
Gratuity
6.
Bonus
7.
Leave and Pension contribution
8.
Printing and Stationery
9.
Postage, Telegrams and Telephone charges
10.
Books and Periodicals
11.
Transport expenses
12.
Licence and Registration
13.
Social Welfare Charges
14.
Uniforms and Liveries 15.Insurance
16.
Repair and Maintenance
17.
Deferred revenue expenditure written off
18.
Electric and water charges
19.
Losses written off
20.
Bad debt written off
20A.
Provision for Bad Debts
21.
Miscellaneous office expenses
22.
Entertainment
23.
Legal charges
24.
Payment to consultants
25.
Audit charges
26.
Expenditure on Advertisement
27.
Contribution to ESI Fund
28.
Payment under Workmen's Compensation Act
29.
Payment of stipend to apprentices
30.
Interest on contribution General Provident Fund
31.
Interest on consumers security deposits
32.
Interest on other security deposits
33.
Depreciation on General Assets
34.
Miscellaneous expenses
35.
Total
36.
Previous year's figures
Sr. No.
Particulars
Transmission
Distribution (HV)
Distribution (M & LV)
Public Lighting
General Equipment
Wiring and Sales Equipment
Manufacture of Electric Equipment
(1)
(2)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
1.
Pay and allowances of officers and staff
2.
Travelling expenses, including Travel Concessions
3.
Medical expenses
4.
Provident Fund
5.
Gratuity
6.
Bonus
7.
Leave and Pension contribution
8.
Printing and Stationery
9.
Postage, Telegrams and Telephone charges
10.
Books and Periodicals
11.
Transport expenses
12.
Licence and Registration
13.
Social Welfare Charges
14.
Uniforms and Liveries 15.Insurance
16.
Repair and Maintenance
17.
Deferred revenue expenditure written off
18.
Electric and water charges
19.
Losses written off
20.
Bad debt written off
20A.
Provision for Bad Debts
21.
Miscellaneous office expenses
22.
Entertainment
23.
Legal charges
24.
Payment to consultants
25.
Audit charges
26.
Expenditure on Advertisement
27.
Contribution to ESI Fund
28.
Payment under Workmen's Compensation Act
29.
Payment of stipend to apprentices
30.
Interest on contribution General Provident Fund
31.
Interest on consumers security deposits
32.
Interest on other security deposits
33.
Depreciation on General Assets
34.
Miscellaneous expenses
35.
Total
36.
Previous year's figures
State Electricity Board
State Electricity Board
Schedule 23 - Forming Part of Net Revenue and Appropriation Account
Statement showing Apportionment of Interest Charges
Statement showing Apportionment of Interest Charges
Sr. No.
Particulars
Code Head
Total interest charges for the year
Less interest charges capitalised
Net interest charges to Revenue Account
Less interest not payable for want of sufficient
revenue surplus
(1)
(2)
(3)
(4)
(5)
(6)
(7)
1.
Interest on loans from Life Insurance Corporation
330101
2.
Interest on loans from Rural Electrification Corporation
330102
3.
Interest on loans from Agricultural Finance Corporation
330103
4.
Interest on loans from Agriculture Refinance Corporation
330104
5.
Interest on Bonds not guaranteed under section 66 of E.S.I.
Act, 1948
330105
6.
Interest on stocks not guaranteed under section 66 of E.S.I.
Act, 1948
330106
7.
Interest on Bonds guaranteed under section 66 of E.S.I. Act,
1948
330107
8.
Interest in storks guaranteed under section 66 of E.S.I. Ac),
1948
330108
9.
Interest on other loans
330109
10.
Interest on Government loans
330110
11.
Total previous year's figures
Add :Interest charges for earlier years paid
during the year
Previous year's figures
Total Interest Charges
Net amount chargeable to revenue
Hydraulic Plant
Steam power plant
Internal combustion power plant
Transmission
Distribution (HV)
Distribution (M & LV)
Public lighting
General equipment
Wiring and sales Equipment
Manufacture of electric equipment
(8)
(9)
(10)
(11)
(12)
(13)
(14)
(15)
(16)
(17)
(18)
State Electricity Board
State Electricity Board
Schedule 24 - Forming Part of Net Revenue and Appropriation Account
Details of Subvention from the State Government
Details of Subvention from the State Government
Sr. No.
Particulars
Code Head
Amount received
Remarks
Current Year
Previous Year
1.
Subsidy from State Government - General
2601
2.
Subsidy from State Government Rural Electrification
2602
Total
State Electricity Board
State Electricity Board
Schedule 25 - Forming Part of the Balance Sheet
Details of Contingent Liability
Details of Contingent Liability
Sr. No.
Particulars
Opening balance at the beginning of the year
Added during the year
Cleared during the year
Closing balance at the end of the year
(1)
(2)
(3)
(4)
(5)
(6)
1.
Interest on Government loan
2.
Depreciation
3.
Other Contingent liabilities (to be specified)
Total previous year's figures
State Electricity Board
State Electricity Board
Schedule 26 - Forming Part of Revenue Account
Details of Prior Period Adjustments
Details of Prior Period Adjustments
Expenditure
Rs.
Income
Rs.
Total
Total
State Electricity Board
State Electricity Board
Schedule 27
Details of Expenditure (Income on Township and other social heads)
Details of Expenditure (Income on Township and other social heads)
Previous Year
Particulars
Current Year
Transport
Social and cultural activities
Schools Education
Medical
Township
Total
Total
Township
Medical
Schools and Education
Social and cultural activities
Transport
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(13)
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
EXPENDITURE
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.
(i) Expenditure on staff
(ii) Maintenance and Repairs
(iii) Expenditure on Medicines
(iv) Other Miscellaneous Expenses
(v) Grants
Total Expenditure
Income
Income
(i) Receipts on account of Rent, Electricity and Water
Charges Electricity.
(ii) Miscellaneous receipts
Total Income
Net Expenditure on Social Overheads
Part II - Capital Expenditure
(i) Opening Balance
(ii) Additions during the year
(iii) Total
(iv) Depreciation for the year
(v) Accumulated provision for depreciation
(vi) Net value of Assets at the close of the year
State Electricity Board
State Electricity Board
Schedule 28
Technical Particulars
Technical Particulars
Previous Year
Particulars
Current year
(1)
(2)
(3)
1.
Year of working
2.
Area of supply in square km.
3.
Approximate population in the area of supply
4.
Installed capacity -
(a) Generating Station -
(i) Hydraulic Power Plant
(ii) Steam Power Plant
(iii) Internal Combustion Power
Plant
(iv) Total
(b) Receiving Station Transformers
5.
Aggregate maximum demand on system
6.
Power generated kwh -
(a) Hydraulic Power Plant
(b) Steam Power Plant
(c) Internal Combustion Power Plant
7.
Power used in auxiliaries (kwh)
8.
Power purchased from other agencies (kwh)
9.
Power available for sale (6+8+7)(kwh)
10.
Power supplied free (kwh)
11.
Power sold (kwh)
12.
System lossed (9-10-11)
13.
Fuel -
(i) Coal consumed in tonnes
(ii) Average calorific value per
kg. of coal
(iii) Average cost of coal per
tonne
(B) Oil consumed in litres -
(i) Average calorific value of
per litre of oil consumed
(ii) Average cost of oil per K.
L.
(C) Lubricating oil -
(a) Quantity Consumed (K. L.)
(b) Average cost per K. L.
14.
Details of consumers and connected load -
Consumers Load (Nos.) in kw
(a) Domestic and Residential
(b) Commercial
(c) Industrial -
(i) Low and medium voltage
(ii) High and extra high voltage
(d) Public lighting
(e) Traction
(f) Irrigation - Agriculture
(g) Public Water Works
(h) Supplies in bulk
(i) Inter-State sales
(j) Total
Subsidiary Statement XI
Subsidiary Statement XI
Summary of technical Particulars for the year ended on 31st March 19.............
Summary of technical Particulars for the year ended on 31st March 19.............
Corresponding figures of the previous year
Particulars
Figures for the current year
1.
Year of working
2.
Area of supply in square miles
3.
Approximate population in the area of supply
4.
Installed capacity -
(a) Generating plant (excluding retired plant) -
(i) Hydraulic
Kw.
(ii) Steam
Kw.
(iii) Internal combustion
Kw.
Total
Kw.
(b) Receiving Station Transformers
Kw.
5.
Normal maximum demand on the system
Kw.
6.
Kwh. generated -
(i) Hydraulic
Kwh.
(ii) Steam
Kwh.
(iii) Internal combustion
Kwh.
Total
Kwh.
7.
Kwh. used for generating station auxiliaries
8.
Kwh. purchased for other agencies
9.
Kwh. available for sale (6-7) +8
10.
Kwh. supplied free (if any) to officers and staff
11.
Kwh. supplied free (if any) to officers, canteen, etc.
12.
Kwh. sold
13.
Kwh. unaccounted (for 9-10+11+ 12) segregated as under
(i) Transformation loss
(ii) Transmission loss
(iii) Distribution loss
Appendix C'
Appendix C'
[ See rule 57(2)]
Annual Statistics
Annual Statistics
[Statement I]
[Statement I]
Particulars of Generating Plant
Particulars of Generating Plant
A. Generating Plant owned and operated by the Board
A. Generating Plant owned and operated by the Board
Name of Power Station
Installed capacity of Power Plant
As at the end of the previous year
Addition during the year
As at the end of the year
Generators
Boilers
Generators
Boilers
Generators
Boilers
(1)
(2)
(3)
(4)
(5)
(6)
(7)
Steam -
(i)
(ii)
(iii)
etc.
Oil -
(i)
(ii)
(iii)
etc.
Hydro-
(i)
(ii)
(iii)
etc.
KW
Kgms./hr.
KW
Kgms./hr.
KW
Kgms./hr.
B. Generating Plant controlled by the Board
B. Generating Plant controlled by the Board
Name of Power Station
Installed capacity of Power Plant
As at the end of the previous year
Addition during the year
As at the end of the year
Generators
Boilers
Generators
Boilers
Generators
Boilers
(1)
(2)
(3)
(4)
(5)
(6)
(7)
Steam -
(i)
(ii)
(iii)
etc.
Oil -
(i)
(ii)
(iii)
etc.
Hydro-
(i)
(ii)
(iii)
etc.
KW
Kgms./hr.
KW
Kgms./hr.
KW
Kgms./hr.
Statement II
Statement II
Particulars of the Board's Transmission Lines
Particulars of the Board's Transmission Lines
(11 KV and above)
Name of section
Voltage
No. of circuits
Length in circuit Kilometres
As at the end of the previous year
Additions during the year
As at the end of the year
(1)
(2)
(3)
(4)
(5)
(6)
Statement III
Statement III
Particulars of the Board's Transmission Lines
Particulars of the Board's Transmission Lines
District area
Voltage
Length in kilometres
As at the end of the previous year
Additions during the year
As at the end of the year
(1)
(2)
(3)
(4)
(5)
Statement IV
Statement IV
Particulars of Transformers
Particulars of Transformers
District or area
Total Transformer KVA
As at the end of the previous year
Additions during the year
As at the end of the year
11 KV and below
above 11 KV
11 KV and below
above 11 KV
11 KV and below
above 11 KV
Statement V
Statement V
Particulars of the Board's Electricity Production
Particulars of the Board's Electricity Production
Owned
Controlled
Total
1.
Aggregate maximum demand - kw
2.
kwh generated and/or purchased -
(a) Generated by Steam
(b) Generated by Oil
(c) Generated by Hydro
(d) Purchased
Total
3.
Fuel consumed -
(a) Coal in tons
(b) Oil in tons
4.
kwh used for auxiliaries in Power Station
Statement VI
Statement VI
Particulars of the Board's Electricity Production
Particulars of the Board's Electricity Production
kwh
1.
Domestic -
(i) Heat and power
(ii) Light and fans
2.
Commercial light and small power -
(i) Heat and power
(ii) Light and fans
3.
Industrial power -
(i) Low and medium voltage
(ii) High voltage
4.
Street lighting
5.
Tramways
6.
Electric railways
7.
Irrigation and agricultural de-watering
8.
Public water works and sewage pumping
9.
Supplies to military services
10.
Supplies in bulk to -
(i) Owners of Controlled Stations
(ii) Distributing Licenses in the State
(iii) Extra State Consumers
11.
Total electricity sales
Statement VII
Statement VII
Particulars of Consumers served directly by the Board
Particulars of Consumers served directly by the Board
Number of consumers served
As at the end of the previous year
Addition during the year
As at the end of the year
1.
Domestic -
(i) Heat and power
(ii) Light and fans
2.
Commercial light and small power -
(i) Heat and power
(ii) Light and Fans
3.
Industrial power -
(i) Low and medium voltage
(ii) High voltage
4.
Street lighting
5.
Tramways
6.
Electric railways
7.
Irrigation and agricultural de-watering
8.
Public water works and sewage pumping
9.
Supplies to-military services
10.
Supplies in bulk to -
(i) Owners of Controlled Stations
(ii) Distributing Licensees in the State
(iii) Extra State Consumers
Total
Statement VIII
Statement VIII
Particulars of the Board's Connected Load
Particulars of the Board's Connected Load
Total connected load
As at the end of the previous year
Addition during the year
As at the end of the year
1.
Domestic -
(i) Heat and power
(ii) Light and fans
2.
Commercial light and small power -
(i) Heat and power
(ii) Light and Fans
3.
Industrial power -
(i) Low and medium voltage
(ii) High voltage
4.
Street lighting
5.
Tramways
6.
Electric railways
7.
Irrigation and agricultural de-watering
8.
Public water works and sewage pumping
9.
Supplies to-military services
10.
Supplies in bulk to -
(i) Owners of Controlled Stations
(ii) Distributing Licensees in the State
(iii) Extra State Consumers
Total
Statement IX
Statement IX
Particulars of Towns and Villages provided with Electricity Supply
Particulars of Towns and Villages provided with Electricity Supply
Number of towns and villages
As at the end of the previous year
Additions during the year
As at the end of the previous year
Over 1,00,000
50,000-1,00,000
20,000-50,000
10,000-20,000
5,000-10,000
Below 5,000
Total
Appendix 'D'
Appendix 'D'
[ See rule 59(1)]
Electricity Sales by Class of Consumers for the month of
Electricity Sales by Class of Consumers for the month of
(Kilowatt-hours in millions)
Domestic heat and small power
Domestic light and fans
Commercial heat and small power
Commercial light and fans
Industrial power at low and medium voltage
Industrial power at high voltage
Public lighting
Traction
Irrigation and agricultural watering
Public water works and sewage pumping
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
Section 60 • The Maharashtra Electricity (Supply) Rules, 1963
60. Remuneration of members of the Rating Committee.
the-maharashtra-electricity-supply-rules-1963-sec-60.json
•
Section 60
{
"act_title": "The Maharashtra Electricity (Supply) Rules, 1963",
"act_slug": "the-maharashtra-electricity-supply-rules-1963",
"section_label": "Section",
"section": {
"number": "60",
"title": "60. Remuneration of members of the Rating Committee.",
"chapter": null,
"content": "[Appendix 'A']\n[Appendix 'A']\n( See rules 53 and 54)\nMaharashtra State Electricity Board\nMaharashtra State Electricity Board\nAnnual Budget for 19 ...\n(In accordance with section 61 of the Act)\nAnnual Financial Statement I\nAbstract of Capital Receipt and Expenditure\nAbstract of Capital Receipt and Expenditure\nSr. No.\nParticulars\nActual previous year\nBudget estimate current year\nFor the last 8 months August to March of the\n previous year\nFor the 1st 4 months April to July of the\n current year\nRevised estimate current year\nBudget estimate next year\nExplanations for the variation in the actuals\n previous year and revised estimate current year\nExplanations for the variation in the revised\n estimate current year and budget estimate next year\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\nRs.\nRs.\nRs.\nRs.\nRs.\nRs.\nRs.\nRs.\nA. Receipt\nA. Receipt\n1.\nOpening balance\n2.\nSubvention from Government (section 63)\n3.\nLoans from Government (section 64) ( vide Annexure I)\n4.\nBorrowings under section 65 ( vide Annexure II)\n5.\nOther Capital Debts and Deposits ( vide Annexure III)\n6.\nBorrowings from -\n(a) Depreciation Reserve\n(b) General Reserve etc.\n7.\nReceipts in connection with scheme of manufacture etc., under\n section 20 ( vide Note 1).\n8.\nConsumers' contributions for service connections\n9.\nReceipts from sale of plant and equipment and stores\n10.\nOther items\nTotal\nB. Expenditure\nB. Expenditure\nConstruction Acquisition\n1.\nPower station and connected works\n“\n2.\nTransmission Lines (including sub-stations)\n“\n3.\nDistribution system (including sub-stations)\n“\n4.\nExpenditure in connection with schemes of manufacture under\n section 20\n“\n5.\nPublic Lighting\n“\n6.\nAdministrative and Residential Buildings\n“\n7.\nLoans and Advances to Licensees (wide Annexure IV)\n“\n8.\nLoans and Advances to the employees (vide Annexure V)\n“\n9.\nOther items (to be specified)\n“\n10.\nLumpsum for unforeseen\n“\nExpenses-Total\nClosing Balance\nNote. - (1) Detailed statement should be added in support of receipts and payments in connection with schemes of manufacture etc., undertaken under section 20 if the number and size of the undertakings justify such a course.\nNote.\n(2) The main heads under B - Expenditure should be supported with the details under the headings prescribed in Subsidiary Statement VII.\nAnnexure I\nAnnexure I\nStatement of Loans received from Government under section 64 of the Electricity (Supply) Act, 1948\nStatement of Loans received from Government under section 64 of the Electricity (Supply) Act, 1948\n(Reference item 3 of Annual Financial Statement I - Capital Receipts)\n(Reference item 3 of Annual Financial Statement I - Capital Receipts)\nSr. No.\nParticulars of Loans\nBalance at the beginning of the 19... 19...\nEstimated receipts during 19... 19...\nEstimated repayment during 19... 19...\nBalance at the end of 19... 19...\nRemarks\nRs.\nRs.\nRs.\nRs.\nAnnexure II\nAnnexure II\nStatement of Borrowing under section 65 of the Electricity (Supply) Act, 1948\nStatement of Borrowing under section 65 of the Electricity (Supply) Act, 1948\n(Reference item 4 of Annual Financial Statement I - Capital Receipts)\nSr. No.\nDescription of stocks, bonds, loans, etc.\nTotal amount outstanding at the commencement of\n 19... -19...\nEstimated borrowing during 19... -19...\nEstimated repayments during 19... -19...\nEstimated amount outstanding at the end of 19...\n -19...\nRemarks regarding terms etc. of borrowings\n during 19... -19...\nRs.\nRs.\nRs.\nRs.\nRs.\n1.\n1.\nBorrowing guaranteed under section 66 -\nBorrowing guaranteed under section 66 -\n(a) Bonds\n(b) Stocks\n(c) Other Borrowings (to be specified)\nTotal\n2.\n2.\nBorrowing not guaranteed -\nBorrowing not guaranteed -\n(a) Bonds\n(b) Stock\n(c) Other Borrowings (to be specified)\nTotal\nGrand Total - 1 and 2\nNote. - Maximum amount of loan fixed by the State Government under section 65(3) of the Electricity (Supply) Act.\nNote.\nAnnexure III\nAnnexure III\nStatement of Debt and Deposits Transactions\nStatement of Debt and Deposits Transactions\n(Reference item 5 of Annual Financial Statement I - Capital Receipts)\nSr. No.\nParticulars\nTotal amount outstanding at the 19.. -19..\nEstimated receipts 19.. -19..\nEstimated repayments 19.. -19..\nNet receipts repayments 19.. -19..\nEstimated amount outstanding 19.. -19..\nRemarks\nRs.\nRs.\nRs.\nRs.\nRs.\nI.\nI.\nDebt -\nDebt -\nProvident Funds (where provident funds are managed by the\n Board).\nII.\nII.\nDeposits. -\nDeposits. -\n(1) Public works deposits\n(2) Security deposits from consumers\n(3) Security deposits from contractors\n(4) Other deposits (to be specified)\nAnnexure IV\nAnnexure IV\nStatement of Loans and Advances to Licensees under section 23 of the Electricity (Supply) Act, 1948\nStatement of Loans and Advances to Licensees under section 23 of the Electricity (Supply) Act, 1948\n(Reference item 7 of Annual Financial Statement I- Capital Expenditure)\nSr. No.\nName of Licensee\nParticulars of loans and advances\nTotal amount outstanding at the commencement of\n 19.. -19..\nEstimated payment during 19.. -19..\nEstimated receipts during 19.. -19..\nNet payment receipts during 19.. -19..\nEstimated amount outstanding at the end of 19..\n 19..\nRemarks\nRs.\nRs.\nRs.\nRs.\nRs.\nAnnexure V\nAnnexure V\nStatement of Loans and Advances to Employees\nStatement of Loans and Advances to Employees\n(Reference item 8 of Financial Statement I - Capital Expenditure)\nSr. No.\nParticulars\nTotal amount outstanding at the commencement of\n 19.. -19..\nEstimated payment during 19.. -19..\nEstimated receipts during 19.. -19..\nNet payment receipts during 19.. -19..\nEstimated amount outstanding at the end of 19..\n -19..\nRemarks\nRs.\nRs.\nRs.\nRs.\nRs.\nI.\nI.\nAdvances bearing interest -\nAdvances bearing interest -\n(1) House building\n(2) Purchase of motor conveyances\n(3) Purchase of other conveyances\n(4) Other advances (to be specified)\nII.\nII.\nAdvances not bearing interest -\nAdvances not bearing interest -\n(1) Advances of T. A.\n(2) Advances of Pay\n(3) Festival Advances\n(4) Other Advances (to be specified)\nAnnual Financial Statement II\nAnnual Financial Statement II\nAbstract of Revenue Receipt and Expenditure\nAbstract of Revenue Receipt and Expenditure\nSr. No.\nParticulars\nActual previous year\nBudget estimate current year\nActuals\nRevised estimate current year\nBudget estimate next year\nExplanations for the variation in the actuals\n previous year and revised estimate current year\nExplanations for the variation in the revised\n estimate current year and budget estimate next year\nFor the last 8 months August to March of the\n previous year\nFor the 4 months April to July of the current\n year\n(1)\n(2)\n(3)\n(4)\n(5)(a)\n(5)(b)\n(6)\n(7)\n(8)\n(9)\nRs.\nRs.\nRs.\nRs.\nRs.\nRs.\nA.\nA.\nReceipt\nReceipt\n1.\nFrom sale of electricity\n2.\nMiscellaneous revenue from consumers\n3.\nRevenue from trading\n4.\nOther revenues (to be specified)\n(i) Sale of steam\n(ii) Repair of lamps and other apparatus\n(iii) Commission for collection of electricity duty etc.\n5.\nReceipts in connection with schemes of manufacture undertaken\n under section 20 ( vide Note 2 below).\nDeduct\nDeduct\nB.\nB.\nExpenditure (Operation and Maintenance) General Works Cost\n -\nExpenditure (Operation and Maintenance) General Works Cost\n -\n1.\n(a) Hydro\n(b) Thermal/Diesel\n(The works cost to be worked out\n as prescribed in the 8th Schedule to the Electricity Supply Act.\n 1948 excluding depreciation and interest).\n2.\nPower purchased\n3.\nTransmission (extra high voltage) (operation and\n maintenance).\n4.\nDistribution (High, medium and low voltage) operation and\n maintenance.\n5.\nPublic lighting (Operation, maintenance and renewals).\n6.\nConsumers servicing etc.\n7.\nExpenditure in connection with schemes of manufacture etc.,\n under section 20 (vide Note 2).\n8.\nAdministration and general expenses ( vide Note 1).\n9.\nOther charges (to be specified).\n10.\nProvision for unseen expenses.\nTotal\nNet Surplus/Deficit from trading\nNote. - (1) Details of administrative expenditure should be shown in a separate statement in a form similar to account subsidiary Statement X of Appendix B.\nNote.\n(2) Detailed statement should be added in support of receipts and payments in connection with schemes of manufacture etc., undertaken under section 20 if the number and size of the undertaking justify such course.\nAnnual Financial Statement III\nAnnual Financial Statement III\nAbstract of Net Revenue Surplus\nAbstract of Net Revenue Surplus\nSr. No.\nParticulars\nActual previous year\nBudget estimate current year\nActuals\nRevised estimate current year\nBudget estimate next year\nExplanations for the variation in the actuals\n previous year and revised estimate current year\nExplanations for the variation in the revised\n estimate current year and budget estimate next year\nFor the last 8 months August to March of the\n previous year\nFor the 4 months April to July of the current\n year\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\nRs.\nRs.\nRs.\nRs.\nRs.\nRs.\nConsolidated net surplus/deficit from trading\n (E/F from Statement II).\nConsolidated net surplus/deficit from trading\n (E/F from Statement II).\nAdd. -\nAdd. -\n(i) Interest on securities and investments.\n(ii) Rent receivable on property.\n(iii) Subvention from Government.\nDeduct. -\nDeduct. -\n1.\nTransfer to taxation reserve.\n2.\nInterest on Bonds not guaranteed under section 66.\n3.\nInterest on Stock not guaranteed under section 66.\n4.\nCredits to depreciation reserve.\nDeduct. -\nDeduct. -\n5.\nInterest on Bonds guaranteed\n under section 66.\n6.\nInterest on Stock guaranteed under section 66.\n7.\nInterest on sums paid by (tie State Government guaranteed\n under section 66.\n8.\nThe write down of amounts paid from capital under proviso to\n section 59.\n9.\nThe write down of amounts in respect of intangible assets.\n10.\nContribution to General Reserve.\n11.\nInterest on loans from Government including arrears.\n12.\nContribution to Tariff Reserve.\n13.\nContribution to Development Reserve.\n14.\nContribution to the Consolidated Fund of the State.\nAnnual Financial Statement IV\nAnnual Financial Statement IV\nSchedule of Staff for the year 19 ........ 19...........\nSchedule of Staff for the year 19 ........ 19...........\nSr. No.\nName of the office and designation of the post\nTime Scale if any\nNumber of posts sanctioned in that time scale\nProvision for the year based on the pay drawn\nAllowances\nTotal provisions for the year for allowances\nRemarks\nDearness allowances\nCompensatory and other allowances\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\nRs.\nRs.\nRs.\nRs.\nRs.\nNote. - The total provision proposed in columns 5 and 8 should agree with the provisions for pay and allowances included under the various heads in Statement II.\nNote.\n[Appendix B]\n[Appendix B]\n( see rule 56)\nMaharashtra State Electricity Board\nBalance Sheet as on 31st March .......\nBalance Sheet as on 31st March .......\nPrevious Year\nLiabilities\nReference to Schedule\nCurrent Year\nPrevious Year\nAssets\nReference to Schedule\nCurrent Year\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\nRs.\nRs.\nRs.\nRs.\nCapital Liabilities -\nCapital Liabilities -\nShare Capital -\nShare Capital -\nFixed Assets -\nFixed Assets -\n[a] By conversion of existing\n loans (.......equity shares of Rs....... each)\n[a] Capital amount expended on\n assets in use\n10 (Part I)\n[b] By fresh investment\n (.......equity share of Rs...... each)\n[b] Written down cost of obsolete\n and unserviceable assets\n10 (Part II)\nLoans from State Government\n1\nLess accumulated provision for\n depreciation\nLoans from others\n2\nCapital works in progress\n including capitalised interest charges\n10 (Part III)\nReserves and Surplus -\nReserves and Surplus -\nInvestments Current Assets -\nInvestments Current Assets -\n11\n(i) General Reserve\n3\n[a] Other operating stores\n12\n(ii) Capital Reserve\n4\n[b] Capital stores for specific\n projects\n10-A\n(iii) Consumer's contribution\n5\n[c] Loans and advances\n14\n(iv) Other reserves\n6\n[d] Sundry debtors\n13\nLess provision for bad and\n doubtful debts\nA. Current liabilities Other\n liabilities\n7\n[e] Other receivables\n15\nB. Provisions -\n8\n[f] Cash and Bank balances\n16\nProvision for income tax payable\nMiscellaneous Expenses -\nMiscellaneous Expenses -\nProvision for dividend on share\n capital.\n9\n[i] Deferred Revenue Expenditure\n18\nOther provisions\n[ii] Intangible assets of capital\n nature\n17\nTotal\nTotal\nNotes. -\nNotes.\n(1) Maximum borrowing power under section 65(3) of the\n Electricity (Supply) Act, 1948\n(2) Contingent liabilities\n25\nState Electricity Board\nState Electricity Board\nRevenue Account for the year ended on 31st March............\nRevenue Account for the year ended on 31st March............\nPrevious Year\nParticulars\nReference to Schedule\nCurrent Year\nPrevious Year\nParticulars\nReference to Schedule\nCurrent Year\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\nRs.\nRs.\nRs.\nRs.\nTo Expenditure on Operation of Generating Stations\n19\nBy sale of power\n20\nTo cost of fuel\n19\nBy Miscellaneous Revenue from customers\n21\nTo power purchased\n19\nBy Revenue from Trading\n20\nTo Salaries and Wages etc.\n19\nBy Interest on Loans and Investments\n20\nTo Repair and Maintenance\n19\nBy Commission on collection of electricity duty\n20\nTo General Administration Expenses\n22\nBy Commission on collection\n20\nTo Depreciation (excluding that on general assets which is\n included in General Administration Expenses)\n10\nBy Miscellaneous Receipts\nTo expenses of earlier period paid during the year\n26\nBy income of earlier years received during the year\n26\nTo recoupment to capital on account of shortfall of O. &\n M. expenditure met therefrom in previous year/years\nBy recoupment of shortfall of O. & M. expenses met from\n capital\nTo contribution to pension fund\nTo net surplus carried over to net revenue and appropriation\n account\nTotal\nTotal\nNotes. - (1) Shortfall of O. & M. expenses amounting to Rs met from capital.\nNotes.\n(2) Shortfall of O. & M. expenses amounting to Rs met from capital during the year recouped this year.\nState Electricity Board\nState Electricity Board\nNet Revenue and Appropriation Account for the year ended on 31st March..........\nNet Revenue and Appropriation Account for the year ended on 31st March..........\nPrevious Year\nParticulars\nReference to Schedule\nCurrent Year\nPrevious Year\nParticulars\nReference to Schedule\nCurrent Year\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\nRs.\nRs.\nRs.\nRs.\nTo intangible assets written off\n19\nBy net surplus from Revenue Account\nTo interest on loans/bonds etc., other than Government loans\n23\nBy subvention from State Government\n24\nTo interest on State Government loans\n23\nTo repayment of interest paid by State Government under\n section 66 on behalf of Electricity Board.\nTo contribution to development rebate\n4\nTo contribution to Investment Allowance Reserve\n4\nTo transfer to Taxation Reserve\n5\nTo contribution to General Reserve\n3\nTo contribution to Sinking Fund\n6\nTo proposed dividend on share capital\nTo appropriation of balance or Development Fund\nTotal\nTotal\nState Electricity Board\nState Electricity Board\nSchedule 1 - Forming Part of the Balance Sheet Details of Government Loans Interest\nSr. No.\nParticulars\nCode Head\nRate of interest\nOpening Balance as on 1st April\nAmount received during the year\nPayment made during the year\nClosing Balance on 31st March\nAmount of interest for the year\nRemarks\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n1.\nLoans from State Government under section 60 of the\n Electricity (Supply) Act, 1948.\n1001\n2.\nLoans from the State Government under section 64 of the\n Electricity (Supply) Act, 1948.\n1002\nTotal\nState Electricity Board\nState Electricity Board\nSchedule 2 - Forming Part of the Balance Sheet Details of Loan from other sources\nMaximum Borrowing Limit...........\nSr. No.\nParticulars\nCode Head\nRate of interest\nOpening Balance as on 1st April\nAmount received during the year\nPayment made during the year\nClosing Balance on 31st March\nAmount of interest for the year\nRemarks\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n1.\nLoans from Life Insurance Corporation\n1003\n2.\nLoans from Rural Electrification Corporation\n1004\n3.\nDebentures/Bonds\n1005\n4.\nLoans from Agriculture Finance Corporation\n1006\n5.\nLoans from Agriculture Refinance Corporation\n1007\n6.\nOther loans\n1008\nTotal\nNote. - Loans will be grouped under the following three sub-heads :-\nNote.\n(i) Unsecured and Unguaranteed Loans.\n(ii) Loans secured by mortgage of fixed and floating assets.\n(iii) Loans guaranteed by the State Government under section 66 of Electricity (Supply) Act, 1948.\nState Electricity Board\nState Electricity Board\nSchedule 3 - Forming Part of the Balance Sheet\nDetails of General Reserve\nDetails of General Reserve\nSr. No.\nParticulars\nCode Head\nOpening Balance as on 1st April\nAddition during the year\nTotal\nTotal Withdrawals during the year\nTotal\nClosing Balance as on 31st March\nRemarks\nAppropriation during the year\nTransfer of Profit on sale of assets\nTransfer of loss on sale of assets\nOther withdrawals\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n1.\nGeneral Reserve\n1102\nState Electricity Board\nState Electricity Board\nSchedule 4 - Forming Part of the Balance Sheet\nDetails of Capital Reserve\nDetails of Capital Reserve\nSr. No.\nParticulars\nCode Head\nOpening Balance as on 1st April\nAddition during the year\nWithdrawal during the year\nClosing Balance as on 31st March\nRemarks\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n1.\nOther Capital Receipts\n110105\n2.\nDevelopment Rebate Reserve\n1103\n3.\nInvestment Allowance Reserve\n1118\n4.\nSubvention from State Government\n1110\nState Electricity Board\nState Electricity Board\nSchedule 5 - Forming Part of the Balance sheet\nDetails of Consumers Contribution\nDetails of Consumers Contribution\nSr. No.\nParticulars\nCode Head\nOpening Balance as on 1st April\nAddition during the year\nWithdrawal/ Adjustment during the year\nClosing Balance as on 31st March\nRemarks\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n1.\nConsumers contribution for service connections and lines\n110101\n2.\nContribution for assisted wiring\n110102\n3.\nContribution for assisted industrial schemes\n110103\n4.\nContribution for deep Tube-well Irrigation Schemes\n110104\nTotal\nState Electricity Board\nState Electricity Board\nSchedule 6 - Forming Part of the Balance Sheet\nDetails of other reserves\nDetails of other reserves\nSr. No.\nParticulars\nCode Head\nOpening Balance as on 1st April\nAddition during the year\nWithdrawal/ Adjustment during the year\nClosing Balance as on 31st March\nRemarks\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n1.\nSinking fund for redemption of debentures/ bonds\n1105\n2.\nDevelopment Fund\n1104\n3.\nOther reserves (Details to be specified)\nState Electricity Board\nState Electricity Board\nSchedule 7 - Forming Part of the Balance Sheet\nDetails of Sundry Creditors\nDetails of Sundry Creditors\nSr. No.\nParticulars\nCode Head\nBalance as on 31st March (Current year)\nBalance as on 31st March (Previous year)\n(1)\n(2)\n(3)\n(4)\n(5)\n1.\nSundry creditors for capital equipment Part A\n1201\n2.\nSundry creditors for supply material\n1202\n3.\nSundry creditors for supply of power\n1203\n4.\nElectricity duty payable to State Government\n1211\n5.\nExcise duty on generation payable to Central Government\n1212\n6.\nInterest on loans payable to State Government\n1213071\n7.\nSundry creditors and others\n1204\nTotal\nPart B\nDetails of amount payable to sister Boards and other Public Sector Undertakings should be given.\nState Electricity Board\nState Electricity Board\nSchedule 8 - Forming Part of the Balance Sheet\nDetails of other liabilities\nDetails of other liabilities\nSr. No.\nParticulars\nCode Head\nBalance as on 31st March (Current year)\nBalance as on 31st March (Previous year)\nRemarks\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n1.\nConsumer Security Deposit in cash\n120501\n2.\nSecurity Deposits from suppliers/contractors\n1206\n3.\nSecurity Deposits from employees in cash\n120701\n4.\nDeposits for execution of works\n1208\n5.\nAdvances from customers for supply of material\n1209\n6.\nExcise or Generation payable to Central Government\n1212\n7.\nInterest accrued and due on loans and advances\n1213\n8.\nUnpaid wages and Bonus\n1214 1226\n9.\nSecurity and other Deposits (other than in cash)\n120502 120702\n10.\nTemporary accommodations and overdrafts and Government\n advances redeemable\n1216\n11.\nInterest accrued but not due on loans and advances\n1220\n12.\nSuspense Heads\n1228 1229 1230\n13.\nOther miscellaneous liabilities\n1215 1217 1218 1219 1221 1223 1224 1227\n14.\nProvision for losses pending investigation\n1225\nTotal\nState Electricity Board\nState Electricity Board\nSchedule 9 - Forming Part of the Balance Sheet\nDetails of provisions made\nDetails of provisions made\nSr. No.\nParticulars\nCode Head\nOpening Balance\nAddition during the year\nTotal\nWithdrawals/ Adjustment during the year\nBalance at the close of the year\nRemarks\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n1.\nGeneral Provident Fund\n1111\n2.\nContributory Provident Fund\n1112\n3.\nStaff Benevolent Fund\n1113\n4.\nPension Reserve\n1114\n(i) From Revenue\n(ii) From Capital\n5.\nRetirement Gratuity Reserve\n1115\nTotal\nState Electricity Board\nState Electricity Board\nSchedule 10 - Forming Part of Balance Sheet\nPart I\nDetails of Fixed Assets and Depreciation thereof\nDetails of Fixed Assets and Depreciation thereof\nSr. No.\nParticulars\nCode Head\nOriginal Cost\nCost as on 1st April\nAdditions during the year\nTransfers and adjustments during the year\nBalance as on 31st March\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n1.\nAssets in use\nA. Hydraulic Power Plant\nA. Hydraulic Power Plant\n1.\nLand and rights\n2.\nBuildings and Civil Engineering Works\n3.\nPlant and Machinery in generating stations\n4.\nHydraulic works forming Part of a hydro-electricity system\n5.\nSwitchgear including cable connections\n6.\nLightning arrestors\n7.\nTransport equipment\n8.\nMiscellaneous equipment\nTotal - Hydraulic Power Plant\nB. Steam Power Plant\nB. Steam Power Plant\n1.\nLand and Rights\n2.\nBuildings and Civil Engineering Works\n3.\nPlant and Machinery in generating stations\n4.\nCooling towers and circulating water system\n5.\nBoiler plant and equipment including plant foundations\n6.\nSwitchgear including cable connections\n7.\nLightning arrestors\n8.\nMiscellaneous equipment\nTotal - Steam Power Plant\nC. Internal Combustion Power Plant\nC. Internal Combustion Power Plant\n1.\nLand and rights\n2.\nBuildings and Civil Engineering Works\n3.\nPlant and Machinery in generating stations\n4.\nCooling towers and circulating water systems\n5.\nSwitchgear including cable connections\n6.\nLightning arrestors\n7.\nMiscellaneous equipment\nTotal - Internal Combustion Power Plant\nD. Transmission (HV and EHV)\nD. Transmission (HV and EHV)\n1.\nLand and rights\n2.\nBuildings and Civil Engineering Works\n3.\nSub-station transformers, transformers kiosks, substations\n equipment and other fixed apparatus including plant foundations\n4.\nSwitchgear including cable connections\n5.\nLightning arrestors\n6.\nUnderground cables\n7.\nTowers pole fixtures, overhead conductors and devices\n8.\nMiscellaneous equipment\nTotal - Transmission Plant\nE. Distribution (HV)\nE. Distribution (HV)\n1.\nLand and rights\n2.\nBuildings and Civil Engineering Works\n3.\nSub-station transformers, transformers kiosks, substations\n equipment and other fixed apparatus including plant foundations\n4.\nSwitchgear including cable connections\n5.\nLightning arrestors\n6.\nUnderground cables\n7.\nTowers, poles fixtures, overhead conductors and devices\n8.\nService equipment\n9.\nMetering equipment\n10.\nMiscellaneous equipment\nTotal - Distribution (HV)\nF. Distribution (M & LV)\nF. Distribution (M & LV)\n1.\nLand and rights\n2.\nBuildings and Civil Engineering Works\n3.\nSub-station transformers, transformers kiosks, sub station\n equipment and other fixed apparatus including plant foundations\n4.\nSwitchgear including cable connections\n5.\nTowers, poles, fixtures, overhead conductors and devices\n6.\nLightning arrestors\n7.\nUnderground cables\n8.\nService lines\n9.\nMetering equipment\n10.\nMiscellaneous equipment\nTotal-Distribution (M & LV)\nG. Public Lighting Equipments\nG. Public Lighting Equipments\n1.\nStreet lighting and signal system\nTotal - Public Lighting\nH. General equipment\nH. General equipment\n1.\nLand and rights\n2.\nBuilding and Civil Engineering Works\n3.\nOffice furniture and equipment\n4.\nTransportation equipment\n5.\nLaboratory and meter testing equipment\n6.\nWorkshop plant and equipment\n7.\nTools and works equipment\n8.\nCommunication equipment\n9.\nAir-conditioning plant\n10.\nMiscellaneous equipment\nTotal - General Equipment\nI. Wiring and Sales Equipment\nI. Wiring and Sales Equipment\n1.\nLand and rights\n2.\nBuildings and Civil Engineering\n3.\nOffice furniture and equipment\n4.\nShowroom equipment\n5.\nDemonstration equipment\n6.\nMiscellaneous\nTotal -Wiring and Sales Equipment\nJ. Manufacture and Electrical Plant\nJ. Manufacture and Electrical Plant\n1.\nLand and rights\n2.\nBuildings and Civil Engineering Works\n3.\nOffice furniture and equipment\n4.\nTransportation equipment\n5.\nTools and works equipment\n6.\nCommunication equipment\n7.\nMiscellaneous equipment\nTotal - Manufacture of Electric Plant.\nTotal of Capital Assets Issue.\nDepreciation\nDepreciation as on 31st March Code Head 1221\nNet cost as on 31st March\nPrevious year\nDepreciation as on 1st April Code Head 1221\nDepreciation during the year\nAdjustments and arrears depreciation for earlier\n period\nAmount withdrawn during the year\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\nState Electricity Board\nState Electricity Board\nSchedule 10\nPart II\nStatement showing written down cost of Obsolete Unserviceable Fixed Assets on which no further depreciation shall be allowed as a charge on the Revenue for the year ended 31st March ..............\nStatement showing written down cost of Obsolete Unserviceable Fixed Assets on which no further depreciation shall be allowed as a charge on the Revenue for the year ended 31st March ..............\nSr. No.\nParticulars of Assets under Major Heads of A/c\nBalance of written down cost of assets at the\n beginning of the year\nAdditions during the year\nWritten down cost of assets sold during the year\nAmount realised from the sale of obsolete etc.,\n the assets during the year\nLoss/ profit on sale of obsolete etc., assets\n during the year transferred to general reserve (Schedule 3)\nBalance written down cost at the end of the year\n (3-4-5)\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n1.\n2.\n3.\n4.\n5.\n6.\n7.\nand so on\nState Electricity Board\nState Electricity Board\nSchedule 10\nPart III\nEnclosure to the Balance Sheet Statement of Works in progress for the year ended on 31st March........\nEnclosure to the Balance Sheet Statement of Works in progress for the year ended on 31st March........\nSr. No.\nParticulars of assets\nBalance at the beginning of the year\nMaterials plant and equipment including civil\n works and advances\nSalaries and wages\nProportion of Administration and Management\n expenses\nInterest capitalised in any\nTotal (4+5+6+7)\nValue transferred to assets in use\nBalance at the end of the year (3+8-9)\n1\n2\n3\n4\n5\n6\n7\n8\n9\n10\n1.\nGenerating Power Plants -\nA. Hydraulic\nB. Steam\nC. Gas Turbine\nD. Internal Combustion\n2.\nTransmission (including substations switching stations,\n switchgears etc.)\n3.\nDistribution (including sub-stations switching stations,\n switchgears etc.)\nA. High Voltage\nB. Medium and Low Voltage\nC. Public Lighting\nTotal (A+B+C)\n4.\nGeneral Equipment\nGrand Total\nState Electricity Board\nState Electricity Board\nSchedule 10-A - Forming Part of the Balance Sheet\nDetails of Capital Stores for specific projects\nDetails of Capital Stores for specific projects\nSr. No.\nName of Project\nCost of Stores at the close of the year\n(1)\n(2)\n(3)\nState Electricity Board\nState Electricity Board\nSchedule 11 - Forming Part of the Balance Sheet\nSr. No.\nParticulars\nCode Head\nOpening Balance as on 1st April\nAdditions during the year\nAdjustment retirements during the year\nClosing Balance as on 31st March\nRemarks\nFace value\nMarket Value\nCost\nFace value\nMarket Value\nCost\nFace value\nMarket Value\nCost\nFace value\nMarket Value\nCost\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\n(15)\n(16)\n1.\nInvestments in Government securities\n0701\n(i) (ii) (iii) (iv) (v) and so on\n2.\nInvestments in bonds raised by other Electricity Boards and\n shares of Corporation and Public Ltd. companies :\n0702\n(i) (ii) (iii) (iv) (v) and so on\n3.\nOther Investments\n0703\n(i) (ii) (iii) (iv) (v) and so on\nNote. - The fact whether quoted or unquoted should also be indicated in the Schedule.\nNote.\nState Electricity Board\nState Electricity Board\nSchedule 12 - Forming Part of Balance Sheet Details of Stores in Stock\nSr. No.\nParticulars\nCode Head\nOpening Balance as on 1st April\nPurchases during the year and adjustments\nIssues during the year and adjustments\nClosing Balance as on 31st March\nRemarks\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n1.\nOther Operating Stores\n050102\n2.\nManufactured components not transferred for stores\n0502\n3.\nStores in transit\n0513\n4.\nStores pending inspection\n0514\n5.\nStores issued on Loans\n0515\n6.\nStores issued to fabricators\n0516\n7.\nScrap\n050103\nTotal\nState Electricity Board\nState Electricity Board\nSchedule 13 - Forming Part of Balance Sheet\nDetails of Sundry Debtors\nDetails of Sundry Debtors\nSr. No.\nParticulars\nCode Head\nBalance as on 31st March\nBalance as on 31st March\nRemarks\nCurrent year balance\nLess provision for bad debts\nNet balance\nPrevious year balance\nLess provision for bad debts\nNet balance\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\nPart A\nPart A\n1.\nSundry Debtors for supply of power etc.\n0507\n2.\nSundry Debtors for Electricity Duty\n0508\n3.\nSundry Debtors and others\n0509 0510\n4.\nSundry Debtors for interest due on securities, Bank Drafts\n and other investments\n0511\n5.\nAmount recoverable from employees\n0517 and 0518\nTotal\nState Electricity Board\nState Electricity Board\nSchedule 14 - Forming Part of the Balance Sheet\nDetails of Loans and Advances\nDetails of Loans and Advances\nSr. No.\nParticulars\nCode Head\nBalance as on 31st March (Current Year)\nBalance as on 31st March (Previous Year)\nRemarks\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\nPart A\n1.\nAdvances to licensees\n0601\n2.\nAdvances to staff not bearing interest\n0601\n3.\nAdvances to staff bearing interest\n0603\n4.\nAdvances to suppliers for Capital Stores/Contracts\n0606 0607\n5.\nAdvances to suppliers for operating stores\n0605 0608\n6.\nAdvances with clearing agent\n0609\n7.\nDeposits with Customs, Port Trust and Excise authorities\n0610 0611 0612\n8.\nOther Advances (details to be specified)\n0604\nTotal..\nPart B\nDetails of loans and advances to sister Boards and other public sector undertakings should be given.\nState Electricity Board\nState Electricity Board\nSchedule 15 - Forming Part of the Balance Sheet\nDetails of other receivables\nDetails of other receivables\nSr. No.\nParticulars\nCode Head\nBalance as on 31st March (Current Year)\nBalance as on 31st March (Previous Year)\nRemarks\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n1.\nMaterial Suspense Account including shortages, in transit and\n stock\n050301 0504 0505 & 0506\n2.\nAccrued income\n0512\n3.\nClaims recoverable\n0613\n4.\nSecurities other than in cash per contract\n0614\n5.\nPrepaid expenses\n0615\n6.\nInter-unit transfers\n050305, 050306\n7.\nIncome Tax paid in advance\n0616\n8.\nIncome Tax deducted at source\n0617\nTotal ...\nState Electricity Board\nState Electricity Board\nSchedule 17 - Forming Part of the Balance Sheet\nDetails of Intangible Assets\nDetails of Intangible Assets\nSr. No.\nParticulars\nCode Head\nBalance as on 31st March (Previous year)\nAdditions during the year\nAdjustment during the year\nBalance as on 31st March (Current year)\nRemarks\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n1.\nFees and expenses for the formation of Board\n0301\n2.\nOffice expenses incidental to organising the Board\n0302\n3.\nDiscount on stocks. Bonds etc., is sued\n0303\n4.\nExpenses incurred on raising finance\n0304\n5.\nOther expenses\n0305\nTotal\nState Electricity Board\nState Electricity Board\nSchedule 18 - Forming Part of the Balance Sheet\nDetails of Deferred Revenue Expenditure\nDetails of Deferred Revenue Expenditure\nSr. No.\nParticulars\nCode Head\nOpening balance as on 31st April\nAddition during the year\nAdjustment during the year\nBalance as on 31st March\nRemarks\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n1.\nDeferred Revenue Expenditure\n0902\nState Electricity Board\nState Electricity Board\nSchedule 19 - Forming Part of the consolidated Revenue and Expenditure Account\nAbstract of Revenue Expenditure\nAbstract of Revenue Expenditure\nSr. No.\nParticulars\nCode Head\nHydraulic power generation\nThermal power generation\nInternal combustion power generation\nTransmission (HEH & HV)\nDistribution (HV)\nDistribution (M & LV)\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n1.\nExpenditure on operation of generating stations\n300101-03 300201-03 300301-03\n2.\nCost of fuel\n300206 300306\n3.\nSalaries and wages\n300104 05, 11 & 20 etc.\n4.\nRepair and Maintenance\n300112 13, 14, 15, 17, 18, 19, 21,\n 27 etc.\nTotal\n6.\nDepreciation\nAs per Schedule 10\n7.\nTotal\n8.\nGeneral Administration Expenses\nAs per Schedule 22\n9.\nTotal\n10.\nShare of interest charges\nAs per Schedule 23\n11.\nShare of intangible assets written off\n12.\nTotal\n13.\nPrevious year's figures\nSr. No.\nParticulars\nCode Head\nPublic Lighting\nConsumer servicing and meter reading\nExpenditure on assisted wiring, coil sales, hire\n purchase of apparatus\nExpenditure on Manufacture of Electrical\n equipments\nTotal\nPrevious year figures\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n1.\nExpenditure on operation of generating stations\n300101-03 300201-03 300301-03\n2.\nCost of fuel\n300206 300306\n3.\nSalaries and wages\n300104 05, 11 & 20 etc.\n4.\nRepair and Maintenance\n300112 13, 14, 15, 17, 18, 19, 21,\n 27 etc.\nTotal\n6.\nDepreciation\nAs per Schedule 10\n7.\nTotal\n8.\nGeneral Administration Expenses\nAs per Schedule 22\n9.\nTotal\n10.\nShare of interest charges\nAs per Schedule 23\n11.\nShare of intangible assets written off\n12.\nTotal\n13.\nPrevious year's figures\nState Electricity Board\nState Electricity Board\nSchedule 20 - Forming Part of the Consolidated Revenue and Expenditure Account\nDetails of Revenue from sale of power to various categories of consumers\nDetails of Revenue from sale of power to various categories of consumers\nPrevious Year\nParticulars of Revenue\nCode Head\nCurrent Year\nUnits sold MK WH\nIncome Rs.\nUnits sold MK WH\nIncome Rs.\n1.\nDomestic and Residential -\n(a) Lights and Fans\n200101\n(b) Small Power\n200102\n(c) Combined load\n100103\n2.\nCommercial\n(a) Lights and Fans\n200201\n(b) Small Power\n200202\n(c) Combined load\n200203\n3.\nIndustrial -\n(a) Low and Medium Voltage\n200301\n(b) High and Extra High Voltage\n200302\n4.\nPublic-Lighting -\n2004\n5.\nTraction -\n(a) Traction-Tramways\n200501\n(b) Traction-Electric Railways\n200502\n6.\nIrrigation -\n2006\n7.\nPublic Water Works and Sewage Pumping -\n2007\n8.\nSupplies in bulk to controlled stations -\n2008\n9.\nSupplies in bulk to other State licensees etc. -\n10.\nSupplies in bulk to others -\n2010\nTotal\nState Electricity Board\nState Electricity Board\nSchedule 21 - Forming Part of the Consolidated Revenue and Expenditure Account\nA. Details of other Income\nA. Details of other Income\nPrevious Year Rs.\nParticulars\nCode Head\nCurrent Year Rs.\n(1)\n(2)\n(3)\n(4)\n1.\nMiscellaneous Revenue from customers -\n(a) Rent of meters\n2101\n(b) Public lighting maintenance charges\n2102\n(c) Other Receipts\n2103\n2.\nRevenue from Trading -\n(a) Sale of Electrical Plant manufactured by the Board\n2201\n(b) Sale, hire purchase, or hire of apparatus and wiring\n2202\n(c) Sale of stores\n2203-01\n(d) Sale of scrap\n2203-02\n(e) Other Miscellaneous Receipts\n2205\n3.\nInterest on Loans and Investments -\n(a) Interest on securities\n2301\n(b) Interest on Bank Deposits\n2302\n(c) Interest on other investments\n2303\n(d) Interest on Loans and Advances to licensees\n2304\n(e) Interest on Loans and Advances to staff\n2305\n4.\nMiscellaneous Receipts -\n(a) Sale of Steam\n2501\n(b) Income from Rents\n2504\n(c) Other Miscellaneous Income\n2502-03 & 2505\n5.\nCommission for collection of Electricity Duty\n2401\nTotal\nState Electricity Board\nState Electricity Board\nSchedule 22 - Forming Part of the Consolidated Revenue and Expenditure Account\nDetails of General Administration Expenses\nDetails of General Administration Expenses\nSr. No.\nParticulars\nTotal Expenses\nApportioned to capital work\nNet Chargeable to Revenue Account\nHydraulic Power Plant\nSteam Power Plant\nInternal Combustion Power Plant\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\nRs.\nRs.\nRs.\nRs.\nRs.\nRs.\n1.\nPay and allowances of officers and staff\n2.\nTravelling expenses, including Travel Concessions\n3.\nMedical expenses\n4.\nProvident Fund\n5.\nGratuity\n6.\nBonus\n7.\nLeave and Pension contribution\n8.\nPrinting and Stationery\n9.\nPostage, Telegrams and Telephone charges\n10.\nBooks and Periodicals\n11.\nTransport expenses\n12.\nLicence and Registration\n13.\nSocial Welfare Charges\n14.\nUniforms and Liveries 15.Insurance\n16.\nRepair and Maintenance\n17.\nDeferred revenue expenditure written off\n18.\nElectric and water charges\n19.\nLosses written off\n20.\nBad debt written off\n20A.\nProvision for Bad Debts\n21.\nMiscellaneous office expenses\n22.\nEntertainment\n23.\nLegal charges\n24.\nPayment to consultants\n25.\nAudit charges\n26.\nExpenditure on Advertisement\n27.\nContribution to ESI Fund\n28.\nPayment under Workmen's Compensation Act\n29.\nPayment of stipend to apprentices\n30.\nInterest on contribution General Provident Fund\n31.\nInterest on consumers security deposits\n32.\nInterest on other security deposits\n33.\nDepreciation on General Assets\n34.\nMiscellaneous expenses\n35.\nTotal\n36.\nPrevious year's figures\nSr. No.\nParticulars\nTransmission\nDistribution (HV)\nDistribution (M & LV)\nPublic Lighting\nGeneral Equipment\nWiring and Sales Equipment\nManufacture of Electric Equipment\n(1)\n(2)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\n(15)\nRs.\nRs.\nRs.\nRs.\nRs.\nRs.\nRs.\n1.\nPay and allowances of officers and staff\n2.\nTravelling expenses, including Travel Concessions\n3.\nMedical expenses\n4.\nProvident Fund\n5.\nGratuity\n6.\nBonus\n7.\nLeave and Pension contribution\n8.\nPrinting and Stationery\n9.\nPostage, Telegrams and Telephone charges\n10.\nBooks and Periodicals\n11.\nTransport expenses\n12.\nLicence and Registration\n13.\nSocial Welfare Charges\n14.\nUniforms and Liveries 15.Insurance\n16.\nRepair and Maintenance\n17.\nDeferred revenue expenditure written off\n18.\nElectric and water charges\n19.\nLosses written off\n20.\nBad debt written off\n20A.\nProvision for Bad Debts\n21.\nMiscellaneous office expenses\n22.\nEntertainment\n23.\nLegal charges\n24.\nPayment to consultants\n25.\nAudit charges\n26.\nExpenditure on Advertisement\n27.\nContribution to ESI Fund\n28.\nPayment under Workmen's Compensation Act\n29.\nPayment of stipend to apprentices\n30.\nInterest on contribution General Provident Fund\n31.\nInterest on consumers security deposits\n32.\nInterest on other security deposits\n33.\nDepreciation on General Assets\n34.\nMiscellaneous expenses\n35.\nTotal\n36.\nPrevious year's figures\nState Electricity Board\nState Electricity Board\nSchedule 23 - Forming Part of Net Revenue and Appropriation Account\nStatement showing Apportionment of Interest Charges\nStatement showing Apportionment of Interest Charges\nSr. No.\nParticulars\nCode Head\nTotal interest charges for the year\nLess interest charges capitalised\nNet interest charges to Revenue Account\nLess interest not payable for want of sufficient\n revenue surplus\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n1.\nInterest on loans from Life Insurance Corporation\n330101\n2.\nInterest on loans from Rural Electrification Corporation\n330102\n3.\nInterest on loans from Agricultural Finance Corporation\n330103\n4.\nInterest on loans from Agriculture Refinance Corporation\n330104\n5.\nInterest on Bonds not guaranteed under section 66 of E.S.I.\n Act, 1948\n330105\n6.\nInterest on stocks not guaranteed under section 66 of E.S.I.\n Act, 1948\n330106\n7.\nInterest on Bonds guaranteed under section 66 of E.S.I. Act,\n 1948\n330107\n8.\nInterest in storks guaranteed under section 66 of E.S.I. Ac),\n 1948\n330108\n9.\nInterest on other loans\n330109\n10.\nInterest on Government loans\n330110\n11.\nTotal previous year's figures\nAdd :Interest charges for earlier years paid\n during the year\nPrevious year's figures\nTotal Interest Charges\nNet amount chargeable to revenue\nHydraulic Plant\nSteam power plant\nInternal combustion power plant\nTransmission\nDistribution (HV)\nDistribution (M & LV)\nPublic lighting\nGeneral equipment\nWiring and sales Equipment\nManufacture of electric equipment\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\n(14)\n(15)\n(16)\n(17)\n(18)\nState Electricity Board\nState Electricity Board\nSchedule 24 - Forming Part of Net Revenue and Appropriation Account\nDetails of Subvention from the State Government\nDetails of Subvention from the State Government\nSr. No.\nParticulars\nCode Head\nAmount received\nRemarks\nCurrent Year\nPrevious Year\n1.\nSubsidy from State Government - General\n2601\n2.\nSubsidy from State Government Rural Electrification\n2602\nTotal\nState Electricity Board\nState Electricity Board\nSchedule 25 - Forming Part of the Balance Sheet\nDetails of Contingent Liability\nDetails of Contingent Liability\nSr. No.\nParticulars\nOpening balance at the beginning of the year\nAdded during the year\nCleared during the year\nClosing balance at the end of the year\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n1.\nInterest on Government loan\n2.\nDepreciation\n3.\nOther Contingent liabilities (to be specified)\nTotal previous year's figures\nState Electricity Board\nState Electricity Board\nSchedule 26 - Forming Part of Revenue Account\nDetails of Prior Period Adjustments\nDetails of Prior Period Adjustments\nExpenditure\nRs.\nIncome\nRs.\nTotal\nTotal\nState Electricity Board\nState Electricity Board\nSchedule 27\nDetails of Expenditure (Income on Township and other social heads)\nDetails of Expenditure (Income on Township and other social heads)\nPrevious Year\nParticulars\nCurrent Year\nTransport\nSocial and cultural activities\nSchools Education\nMedical\nTownship\nTotal\nTotal\nTownship\nMedical\nSchools and Education\nSocial and cultural activities\nTransport\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)\n(11)\n(12)\n(13)\nRs.\nRs.\nRs.\nRs.\nRs.\nRs.\nEXPENDITURE\nRs.\nRs.\nRs.\nRs.\nRs.\nRs.\n(i) Expenditure on staff\n(ii) Maintenance and Repairs\n(iii) Expenditure on Medicines\n(iv) Other Miscellaneous Expenses\n(v) Grants\nTotal Expenditure\nIncome\nIncome\n(i) Receipts on account of Rent, Electricity and Water\n Charges Electricity.\n(ii) Miscellaneous receipts\nTotal Income\nNet Expenditure on Social Overheads\nPart II - Capital Expenditure\n(i) Opening Balance\n(ii) Additions during the year\n(iii) Total\n(iv) Depreciation for the year\n(v) Accumulated provision for depreciation\n(vi) Net value of Assets at the close of the year\nState Electricity Board\nState Electricity Board\nSchedule 28\nTechnical Particulars\nTechnical Particulars\nPrevious Year\nParticulars\nCurrent year\n(1)\n(2)\n(3)\n1.\nYear of working\n2.\nArea of supply in square km.\n3.\nApproximate population in the area of supply\n4.\nInstalled capacity -\n(a) Generating Station -\n(i) Hydraulic Power Plant\n(ii) Steam Power Plant\n(iii) Internal Combustion Power\n Plant\n(iv) Total\n(b) Receiving Station Transformers\n5.\nAggregate maximum demand on system\n6.\nPower generated kwh -\n(a) Hydraulic Power Plant\n(b) Steam Power Plant\n(c) Internal Combustion Power Plant\n7.\nPower used in auxiliaries (kwh)\n8.\nPower purchased from other agencies (kwh)\n9.\nPower available for sale (6+8+7)(kwh)\n10.\nPower supplied free (kwh)\n11.\nPower sold (kwh)\n12.\nSystem lossed (9-10-11)\n13.\nFuel -\n(i) Coal consumed in tonnes\n(ii) Average calorific value per\n kg. of coal\n(iii) Average cost of coal per\n tonne\n(B) Oil consumed in litres -\n(i) Average calorific value of\n per litre of oil consumed\n(ii) Average cost of oil per K.\n L.\n(C) Lubricating oil -\n(a) Quantity Consumed (K. L.)\n(b) Average cost per K. L.\n14.\nDetails of consumers and connected load -\nConsumers Load (Nos.) in kw\n(a) Domestic and Residential\n(b) Commercial\n(c) Industrial -\n(i) Low and medium voltage\n(ii) High and extra high voltage\n(d) Public lighting\n(e) Traction\n(f) Irrigation - Agriculture\n(g) Public Water Works\n(h) Supplies in bulk\n(i) Inter-State sales\n(j) Total\nSubsidiary Statement XI\nSubsidiary Statement XI\nSummary of technical Particulars for the year ended on 31st March 19.............\nSummary of technical Particulars for the year ended on 31st March 19.............\nCorresponding figures of the previous year\nParticulars\nFigures for the current year\n1.\nYear of working\n2.\nArea of supply in square miles\n3.\nApproximate population in the area of supply\n4.\nInstalled capacity -\n(a) Generating plant (excluding retired plant) -\n(i) Hydraulic\nKw.\n(ii) Steam\nKw.\n(iii) Internal combustion\nKw.\nTotal\nKw.\n(b) Receiving Station Transformers\nKw.\n5.\nNormal maximum demand on the system\nKw.\n6.\nKwh. generated -\n(i) Hydraulic\nKwh.\n(ii) Steam\nKwh.\n(iii) Internal combustion\nKwh.\nTotal\nKwh.\n7.\nKwh. used for generating station auxiliaries\n8.\nKwh. purchased for other agencies\n9.\nKwh. available for sale (6-7) +8\n10.\nKwh. supplied free (if any) to officers and staff\n11.\nKwh. supplied free (if any) to officers, canteen, etc.\n12.\nKwh. sold\n13.\nKwh. unaccounted (for 9-10+11+ 12) segregated as under\n(i) Transformation loss\n(ii) Transmission loss\n(iii) Distribution loss\nAppendix C'\nAppendix C'\n[ See rule 57(2)]\nAnnual Statistics\nAnnual Statistics\n[Statement I]\n[Statement I]\nParticulars of Generating Plant\nParticulars of Generating Plant\nA. Generating Plant owned and operated by the Board\nA. Generating Plant owned and operated by the Board\nName of Power Station\nInstalled capacity of Power Plant\nAs at the end of the previous year\nAddition during the year\nAs at the end of the year\nGenerators\nBoilers\nGenerators\nBoilers\nGenerators\nBoilers\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\nSteam -\n(i)\n(ii)\n(iii)\netc.\nOil -\n(i)\n(ii)\n(iii)\netc.\nHydro-\n(i)\n(ii)\n(iii)\netc.\nKW\nKgms./hr.\nKW\nKgms./hr.\nKW\nKgms./hr.\nB. Generating Plant controlled by the Board\nB. Generating Plant controlled by the Board\nName of Power Station\nInstalled capacity of Power Plant\nAs at the end of the previous year\nAddition during the year\nAs at the end of the year\nGenerators\nBoilers\nGenerators\nBoilers\nGenerators\nBoilers\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\nSteam -\n(i)\n(ii)\n(iii)\netc.\nOil -\n(i)\n(ii)\n(iii)\netc.\nHydro-\n(i)\n(ii)\n(iii)\netc.\nKW\nKgms./hr.\nKW\nKgms./hr.\nKW\nKgms./hr.\nStatement II\nStatement II\nParticulars of the Board's Transmission Lines\nParticulars of the Board's Transmission Lines\n(11 KV and above)\nName of section\nVoltage\nNo. of circuits\nLength in circuit Kilometres\nAs at the end of the previous year\nAdditions during the year\nAs at the end of the year\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\nStatement III\nStatement III\nParticulars of the Board's Transmission Lines\nParticulars of the Board's Transmission Lines\nDistrict area\nVoltage\nLength in kilometres\nAs at the end of the previous year\nAdditions during the year\nAs at the end of the year\n(1)\n(2)\n(3)\n(4)\n(5)\nStatement IV\nStatement IV\nParticulars of Transformers\nParticulars of Transformers\nDistrict or area\nTotal Transformer KVA\nAs at the end of the previous year\nAdditions during the year\nAs at the end of the year\n11 KV and below\nabove 11 KV\n11 KV and below\nabove 11 KV\n11 KV and below\nabove 11 KV\nStatement V\nStatement V\nParticulars of the Board's Electricity Production\nParticulars of the Board's Electricity Production\nOwned\nControlled\nTotal\n1.\nAggregate maximum demand - kw\n2.\nkwh generated and/or purchased -\n(a) Generated by Steam\n(b) Generated by Oil\n(c) Generated by Hydro\n(d) Purchased\nTotal\n3.\nFuel consumed -\n(a) Coal in tons\n(b) Oil in tons\n4.\nkwh used for auxiliaries in Power Station\nStatement VI\nStatement VI\nParticulars of the Board's Electricity Production\nParticulars of the Board's Electricity Production\nkwh\n1.\nDomestic -\n(i) Heat and power\n(ii) Light and fans\n2.\nCommercial light and small power -\n(i) Heat and power\n(ii) Light and fans\n3.\nIndustrial power -\n(i) Low and medium voltage\n(ii) High voltage\n4.\nStreet lighting\n5.\nTramways\n6.\nElectric railways\n7.\nIrrigation and agricultural de-watering\n8.\nPublic water works and sewage pumping\n9.\nSupplies to military services\n10.\nSupplies in bulk to -\n(i) Owners of Controlled Stations\n(ii) Distributing Licenses in the State\n(iii) Extra State Consumers\n11.\nTotal electricity sales\nStatement VII\nStatement VII\nParticulars of Consumers served directly by the Board\nParticulars of Consumers served directly by the Board\nNumber of consumers served\nAs at the end of the previous year\nAddition during the year\nAs at the end of the year\n1.\nDomestic -\n(i) Heat and power\n(ii) Light and fans\n2.\nCommercial light and small power -\n(i) Heat and power\n(ii) Light and Fans\n3.\nIndustrial power -\n(i) Low and medium voltage\n(ii) High voltage\n4.\nStreet lighting\n5.\nTramways\n6.\nElectric railways\n7.\nIrrigation and agricultural de-watering\n8.\nPublic water works and sewage pumping\n9.\nSupplies to-military services\n10.\nSupplies in bulk to -\n(i) Owners of Controlled Stations\n(ii) Distributing Licensees in the State\n(iii) Extra State Consumers\nTotal\nStatement VIII\nStatement VIII\nParticulars of the Board's Connected Load\nParticulars of the Board's Connected Load\nTotal connected load\nAs at the end of the previous year\nAddition during the year\nAs at the end of the year\n1.\nDomestic -\n(i) Heat and power\n(ii) Light and fans\n2.\nCommercial light and small power -\n(i) Heat and power\n(ii) Light and Fans\n3.\nIndustrial power -\n(i) Low and medium voltage\n(ii) High voltage\n4.\nStreet lighting\n5.\nTramways\n6.\nElectric railways\n7.\nIrrigation and agricultural de-watering\n8.\nPublic water works and sewage pumping\n9.\nSupplies to-military services\n10.\nSupplies in bulk to -\n(i) Owners of Controlled Stations\n(ii) Distributing Licensees in the State\n(iii) Extra State Consumers\nTotal\nStatement IX\nStatement IX\nParticulars of Towns and Villages provided with Electricity Supply\nParticulars of Towns and Villages provided with Electricity Supply\nNumber of towns and villages\nAs at the end of the previous year\nAdditions during the year\nAs at the end of the previous year\nOver 1,00,000\n50,000-1,00,000\n20,000-50,000\n10,000-20,000\n5,000-10,000\nBelow 5,000\nTotal\nAppendix 'D'\nAppendix 'D'\n[ See rule 59(1)]\nElectricity Sales by Class of Consumers for the month of\nElectricity Sales by Class of Consumers for the month of\n(Kilowatt-hours in millions)\nDomestic heat and small power\nDomestic light and fans\nCommercial heat and small power\nCommercial light and fans\nIndustrial power at low and medium voltage\nIndustrial power at high voltage\nPublic lighting\nTraction\nIrrigation and agricultural watering\nPublic water works and sewage pumping\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\n(10)",
"footnote": "",
"is_definition": false,
"sort_order": 56
},
"prev_section": "59",
"next_section": null
}