← Back to The M.P. Boilers Rules, 1969

18. Duties of Deputy Chief Inspector.

(a) check the registration and memorandum of inspection books of all boilers proposed for registration;
(b) scrutinise plans and drawings submitted in advance under Regulation 393 or Regulation 395;
(c) examine and countersign the memorandum of Inspection Book of each boiler after each inspection;
(d) enter his own signature any subsequent entries required in the registration book;
(e) enquire into serious accidents to boilers within his jurisdiction and submit reports to the Chief Inspector for a personal enquiry by him if considered necessary;
(f) maintain a register in Form A attached to these rules, of all boilers registered within the State and those which have been transferred to the State;
(g) keep in his office the memorandum of inspection books of all boilers borne on the register;
(h) scrutinise the certificate prepared in Form II, Form III, Form III-A, Form III-B, Form III-C and Form IV;
(i) perform the duties of an Inspecting Officer when deputed to do so by the Inspecting Authority;
(j) keep a register of all registration and inspection fees received;
(k) generally assist the Chief Inspector in the administration of the Act.