(i)
Group A1
Residential (In the case of single family
residential buildings , if the total floor area of the building
is upto 150 sq.metres and if the plot area is upto 320 sq.metres,
the rainwater storage arrangements are not mandatory.)
(ii)
Group A2
Lodging Houses
(iii)
Group B
Educational
(iv)
Group C
Medical/Hospital
(v)
Group D
Assembly
(vi)
Group E
Office/Business
(vii)
Group F
Mercantile/Commercial (If the total floor area
of the building is upto 100 sq.metres and if the plot area is
upto 200 sq.metres, the rainwater storage arrangements are not
mandatory.)
(viii)
Group G1 and Group G2
Industrial (only for workshops, assembly plants,
laboratories, dry cleaning plants, power plants, Gas plants,
refineries, diaries, food processing units and any other
occupancies notified by the Government from time to time).
[***]
(i) Roof gutters;
(ii) Down pipe and first flush pipe arrangement;
(iii) Filter unit; and
(iv) Storage tank with provisions for drawing water and spill-over.
Group A1
25 litres/sq.m.of floor area
Group A2
25 litres/sq.m.of floor area
Group B
50 litres/sq.m.of floor area
Group C
50 litres/sq.m.of floor area
Group D
50 litres/sq.m.of floor area
Group E
50 litres/sq.m of floor area
Group F
25 litres/sq.m of floor area
Group G1 and Group G2
50 litres/sq.m.of floor area
[***]
[ Note. - 'Coverage' means the area mentioned in item (y) of sub-rule (1) of rule 2.]
Note.
Chapter XVII
Solar Assisted Water Heating/ Lighting System
Section 102 • The Kerala Panchayat Buildings Rules, 2011
102. Rainwater storage Arrangements.
the-kerala-panchayat-buildings-rules-2011-sec-102.json
•
Section 102
{
"act_title": "The Kerala Panchayat Buildings Rules, 2011",
"act_slug": "the-kerala-panchayat-buildings-rules-2011",
"section_label": "Section",
"section": {
"number": "102",
"title": "102. Rainwater storage Arrangements.",
"chapter": null,
"content": "(i)\nGroup A1\nResidential (In the case of single family\n\t\t\t\tresidential buildings , if the total floor area of the building\n\t\t\t\tis upto 150 sq.metres and if the plot area is upto 320 sq.metres,\n\t\t\t\tthe rainwater storage arrangements are not mandatory.)\n(ii)\nGroup A2\nLodging Houses\n(iii)\nGroup B\nEducational\n(iv)\nGroup C\nMedical/Hospital\n(v)\nGroup D\nAssembly\n(vi)\nGroup E\nOffice/Business\n(vii)\nGroup F\nMercantile/Commercial (If the total floor area\n\t\t\t\tof the building is upto 100 sq.metres and if the plot area is\n\t\t\t\tupto 200 sq.metres, the rainwater storage arrangements are not\n\t\t\t\tmandatory.)\n(viii)\nGroup G1 and Group G2\nIndustrial (only for workshops, assembly plants,\n\t\t\t\tlaboratories, dry cleaning plants, power plants, Gas plants,\n\t\t\t\trefineries, diaries, food processing units and any other\n\t\t\t\toccupancies notified by the Government from time to time).\n[***]\n(i) Roof gutters;\n(ii) Down pipe and first flush pipe arrangement;\n(iii) Filter unit; and\n(iv) Storage tank with provisions for drawing water and spill-over.\nGroup A1\n25 litres/sq.m.of floor area\nGroup A2\n25 litres/sq.m.of floor area\nGroup B\n50 litres/sq.m.of floor area\nGroup C\n50 litres/sq.m.of floor area\nGroup D\n50 litres/sq.m.of floor area\nGroup E\n50 litres/sq.m of floor area\nGroup F\n25 litres/sq.m of floor area\nGroup G1 and Group G2\n50 litres/sq.m.of floor area\n[***]\n[ Note. - 'Coverage' means the area mentioned in item (y) of sub-rule (1) of rule 2.]\nNote.\nChapter XVII\nSolar Assisted Water Heating/ Lighting System",
"footnote": "",
"is_definition": false,
"sort_order": 109
},
"prev_section": "101",
"next_section": "103"
}