4. Circumstances in which the permission to extend to construct a canal to be fed from any notified source can not be accorded.

(a) where the length of the water course from its head to its point of contact with field exceeds 3 kilometres; or
(b) where the water supply or water in the canal, distributary, or water course is already fully utilised; or
(c) where, in the opinion of the Collector loss from wastage is likely to occur.