(a) the nature and composition of the explosives and in case of plastic explosives, the name and percentage of the marking agent;
(b) the limiting range of percentage of each ingredient of the explosive, including substitutes, if any;
(c) method of function, purpose of use and performance characteristics of the explosives and instructions governing its use;
(d) in the case of a new explosive to be manufactured in India, the process of manufacture stating safe operating procedures and precautions;
(e) where an explosives is enclosed in a case or other contrivance, the dimensions of the case or other contrivance, the quantity, nature, brand of explosives contained therein and markings thereon;
(f) the box, wrapping or other container in which the explosive will be handled, used or displayed or otherwise distributed including the markings thereon;
(g) the package in which the explosive will be transported and stored including the markings thereon;
(h) country of origin with name and address of the manufacturer, UN Classification and UN number of the explosives; recommended methods of disposal; material Safety Data Sheet for the explosives and raw material;
(i) fee referred to in Part 2 of Schedule IV to these rules.
(ii) The tests referred to in clause (i) pertain to-
(a) physical properties including consistency, reaction tendency to absorb moisture, segregation in transport or otherwise of the constituents, exudation, behaviour at low temperatures, specific gravity and such other physical properties as may be considered necessary;
(b) chemical composition-determination of the percentage composition of the ingredients forming the explosive, and the quality of the ingredients employed in its manufacture;
(c) stability-determination of stability after subjection to such varying environmental conditions as would tend to produce spontaneous ignition or variation in sensitiveness of an explosive;
(d) ignition characteristics-ignition point, behaviour on ignition, liability to spontaneous ignition, behaviour on ignition in bulk;
(e) mechanical sensitiveness-determination of sensitiveness to friction and impact;
(f) air gap and transmission of detonation;
(g) velocity of detonation;
(h) determination of strength;
(i) composition of gases evolved upon explosion;
(j) ensure that plastic explosives are detected by vapour detection technique;
(k) such other tests and field trials as the Chief Controller may specify.
(a) where the explosive is declared to be an authorised explosive, shall assign the Class including any division and sub-division and category within which the explosive falls;
(b) where the explosive is not declared to be an authorised explosive, shall communicate the same with reasons thereof to the applicant.
(a) the brand or trade name of the explosives;
(b) the name and address of the manufacturers;
(c) the Class, including any division and sub-divisions thereof, within which each explosive falls; and
(d) the safety distance category and the corresponding UN Classification and UN Number.
(ii) The list of authorised explosives shall be published by the Chief Controller from time to time.
(ii) The Chief Controller may order fresh test to be carried out if the proposed alteration in the percentage, composition, nature of ingredients, process of manufacture or construction of the case or contrivance of the explosive are likely to change the results of the original test prescribed in these rules.
(i) Upon scrutiny of the proposal, the Chief Controller may grant permission to manufacture trial batches of the explosives in laboratory not exceeding explosive limit of laboratory and direct to carry out such tests, as he may consider necessary.
(ii) The applicant shall submit test report seeking permission for trial manufacture in the plant or manufacturing unit.
(iii) On receipt of test report, the Chief Controller may permit manufacture of limited quantity of the explosives in the manufacturing unit or plant on trial basis.
(iv) In case of existing plants or conventional type of explosives, the Chief Controller may permit trial manufacture directly in the manufacturing plant without manufacturing in the laboratory scale.
(v) On being satisfied with the reports of the tests as may be required by the Chief Controller, he may issue field trial permission under such conditions as he may specify.
(vi) After field trial, applicant shall submit to the Chief Controller the reports of field trial and necessary fees referred to in Part 2 of Schedule IV of these rules.
(vii) For permitted explosives, test report and field trial report from Central Mining Research Institute and Central Mine Planning and Design Institute are required to be submitted to the Chief Controller and in case of non-permitted explosives field trial report from reputed mining or construction company.
(viii) On receipt of report and being satisfied, the Chief Controller may authorise the explosives and permit its manufacture on regular basis provided that nothing in this sub-rule shall be applicable for fireworks.
Section 6 • The Explosives Rules, 2008
6. Authorisation of explosives
the-explosives-rules-2008-sec-6.json
•
Section 6
{
"act_title": "The Explosives Rules, 2008",
"act_slug": "the-explosives-rules-2008",
"section_label": "Section",
"section": {
"number": "6",
"title": "6. Authorisation of explosives",
"chapter": null,
"content": "(a) the nature and composition of the explosives and in case of plastic explosives, the name and percentage of the marking agent;\n(b) the limiting range of percentage of each ingredient of the explosive, including substitutes, if any;\n(c) method of function, purpose of use and performance characteristics of the explosives and instructions governing its use;\n(d) in the case of a new explosive to be manufactured in India, the process of manufacture stating safe operating procedures and precautions;\n(e) where an explosives is enclosed in a case or other contrivance, the dimensions of the case or other contrivance, the quantity, nature, brand of explosives contained therein and markings thereon;\n(f) the box, wrapping or other container in which the explosive will be handled, used or displayed or otherwise distributed including the markings thereon;\n(g) the package in which the explosive will be transported and stored including the markings thereon;\n(h) country of origin with name and address of the manufacturer, UN Classification and UN number of the explosives; recommended methods of disposal; material Safety Data Sheet for the explosives and raw material;\n(i) fee referred to in Part 2 of Schedule IV to these rules.\n(ii) The tests referred to in clause (i) pertain to-\n(a) physical properties including consistency, reaction tendency to absorb moisture, segregation in transport or otherwise of the constituents, exudation, behaviour at low temperatures, specific gravity and such other physical properties as may be considered necessary;\n(b) chemical composition-determination of the percentage composition of the ingredients forming the explosive, and the quality of the ingredients employed in its manufacture;\n(c) stability-determination of stability after subjection to such varying environmental conditions as would tend to produce spontaneous ignition or variation in sensitiveness of an explosive;\n(d) ignition characteristics-ignition point, behaviour on ignition, liability to spontaneous ignition, behaviour on ignition in bulk;\n(e) mechanical sensitiveness-determination of sensitiveness to friction and impact;\n(f) air gap and transmission of detonation;\n(g) velocity of detonation;\n(h) determination of strength;\n(i) composition of gases evolved upon explosion;\n(j) ensure that plastic explosives are detected by vapour detection technique;\n(k) such other tests and field trials as the Chief Controller may specify.\n(a) where the explosive is declared to be an authorised explosive, shall assign the Class including any division and sub-division and category within which the explosive falls;\n(b) where the explosive is not declared to be an authorised explosive, shall communicate the same with reasons thereof to the applicant.\n(a) the brand or trade name of the explosives;\n(b) the name and address of the manufacturers;\n(c) the Class, including any division and sub-divisions thereof, within which each explosive falls; and\n(d) the safety distance category and the corresponding UN Classification and UN Number.\n(ii) The list of authorised explosives shall be published by the Chief Controller from time to time.\n(ii) The Chief Controller may order fresh test to be carried out if the proposed alteration in the percentage, composition, nature of ingredients, process of manufacture or construction of the case or contrivance of the explosive are likely to change the results of the original test prescribed in these rules.\n(i) Upon scrutiny of the proposal, the Chief Controller may grant permission to manufacture trial batches of the explosives in laboratory not exceeding explosive limit of laboratory and direct to carry out such tests, as he may consider necessary.\n(ii) The applicant shall submit test report seeking permission for trial manufacture in the plant or manufacturing unit.\n(iii) On receipt of test report, the Chief Controller may permit manufacture of limited quantity of the explosives in the manufacturing unit or plant on trial basis.\n(iv) In case of existing plants or conventional type of explosives, the Chief Controller may permit trial manufacture directly in the manufacturing plant without manufacturing in the laboratory scale.\n(v) On being satisfied with the reports of the tests as may be required by the Chief Controller, he may issue field trial permission under such conditions as he may specify.\n(vi) After field trial, applicant shall submit to the Chief Controller the reports of field trial and necessary fees referred to in Part 2 of Schedule IV of these rules.\n(vii) For permitted explosives, test report and field trial report from Central Mining Research Institute and Central Mine Planning and Design Institute are required to be submitted to the Chief Controller and in case of non-permitted explosives field trial report from reputed mining or construction company.\n(viii) On receipt of report and being satisfied, the Chief Controller may authorise the explosives and permit its manufacture on regular basis provided that nothing in this sub-rule shall be applicable for fireworks.",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
"prev_section": "5",
"next_section": "9"
}