← Back to The Explosives Rules, 2008

102. No objection certificate before construction

(a) the premises proposed to be licensed is within the factory licensed under these rules for manufacture of explosives and the required safety distances are under the control of applicant;
(b) the premises for which the new licence is required is situated within the same survey number, in which the applicant has an existing premises and a valid licence for the same.
(c) any other amendment in the existing licence is carried out which does not warrant any fresh enquiry for grant of no objection certificate.