THE FIRST SCHEDULE
(See Sections 34 and 36)
ARRANGEMENTS IN RESPECT OF CONTROLLED STATIONS
PART I
PART I
ASSUMPTION OF CONTROL
(a) Subject to such directions as the Board may from time to time give him, to keep the station at all times in good and substantial repair and condition and ready for use, together with adequate staff for operating, maintaining and controlling the station, and not to make any substantial alterations or renewals in, or remove any essential or substantial part of, the station without the consent in writing of the Board;
(b) To operate the station so as to generate such quantity of electricity with such units of plant at such rates of output and at such times, or to cease to generate electricity during such periods as the Board may direct;
(c) To carry out as soon as may be practicable such reasonable extensions, alterations or renewals of the station or any part thereof as the Board may from time to time direct;
(d) To supply to the Board all the electricity generated at the station.
Explanation.
Provided that where on the date of the receipt of such notice the licensee is bound under any contract to purchase any quantity of electricity from some other source, he may, for a period not exceeding two years after the date of control or for such further period, if any, as the Board may allow, continue to purchase electricity under the said contract from such other source.
(a) Such of the several controlled stations as are interconnected shall, for the purposes of this Schedule, be deemed to comprise a single controlled station, and, unless the subject or context otherwise requires, the provisions of this Schedule shall be construed as if the word "combined" had been inserted before the word "station" or the words "generating station" wherever they occur;
(b) The electricity supplied at the several controlled stations by the licensee to the Board, or by the Board to the licensee, shall each respectively be treated as single supplies ;
(c) In the application of Cl. (a) of para. XII, the costs of production at each of the several controlled stations shall be separately ascertained, and in application of Cl. (c) of the said paragraph-
(i) The sum ascertained in accordance with Cl. (a) of para. I of the Eighth Schedule in respect of each of the several controlled stations shall be separately allocated between fixed costs and running costs, and
(ii) The sum of the several fixed costs and the sum of the several running costs shall be the fixed costs and the running costs respectively of the combined station:
(d) In directing the operation of the combined station under Cl. (b) of sub-paragraph (1) of para. 1, the Board shall have regard to the nature and capacity of the licensee's transmission system inter-connecting the several controlled stations and to the requirements of the licensee at each of those stations.
(a) All the provisions of this Schedule except para. II and this paragraph shall, in relation to the licensee, cease to have effect;
(b) (b) The Board shall supply the licensee with the electricity required by him under para. 11 at such price and on such conditions as the Board may determine.
PART II
PART II
PRICE TO BE PAID FOR ELECTRICITY SUPPLIED BY THE BOARD UNDER PART I
(a) The maximum capacity of the station, that is to say, the maximum capacity (expressed in kilowatts available for supply to feeders) of such plant and works appertaining to the generation of electricity at the station as where available for reliable and regular commercial operation on the first day of the month, including the capacity of such plant and works as were temporarily out of commission;
(b) The number and size of units of plant works, forming part of the aforesaid plant and works, which ought properly to be deemed to be stand-by if the station were not a controlled station;
(c) The stand-by capacity of the station, that is to say, the number of kilowatts (expressed in kilowatts available for supply feeders) by which the maximum capacity of the station would be reduced if the stand-by plant and works referred to in Cl. (b) were to be left out of account;
(d) The actual effective capacity of the station, that is to say, the number of kilowatts by which the maximum capacity exceeds the stand-by capacity.
Provided that the licensee shall not declare to be surplus to his requirements any such units of plant or works as were installed or were an order at the date of control or which were included in any previous computation of the scheduled effective capacity :
Provided further that if as a result of the licensee declaring as surplus to his requirement any units of plant or works, the scheduled effective capacity is in respect of any month computed to be less than the maximum demand of the licensee on the station for the purposes of his own undertaking, then such units of plant or works and all further additional units of plant or works shall thereafter always be deemed to be surplus to the requirements of the licensee as aforesaid unless the Board decides otherwise.
Provided that if the station is a hydro-electric station or if any unit of a combined station is a hydroelectric unit, the number of kilowatthours which the licensee shall be entitled to purchase as aforesaid shall be reduced by such amount, if any, as may be agreed between the Board and the licensee, having regard to the number of 'kilowatt-hours actually supplied in the month from such hydroelectric station or unit.
(a) There shall be ascertained in respect of that year the cost of production at the station in accordance with the provisions of the Eighth Schedule:
(b) There shall be deducted from the total sum ascertained, in respect of the year under Cls. (b), (c), ((I). (e) and (f) of para. I of the Eighth Schedule, such proportion of the charges referred to in the said clauses as are wholly attributable to so much of the plant and works, if any, as has been declared by the licensee under Sub-paragraph (2) of para. X to be surplus to his requirements, and the balance remaining after such deduction shall, for the purposes of this schedule. be referred to as the schedule overhead charges:
Provided that in assessing the said proportion, regard shall be had to the period during which any such plant or works were declared to be surplus as aforesaid;
(c) There shall be allocated between fixed costs and running costs in accordance with the provisions of the Ninth Schedule, the sum ascertained in respect of' that year under Cl. (a) of para. I of the Eighth Schedule, and the amount of running costs divided by the number of kilowatt-hours supplied from the station in that year shall for the purposes of the Schedule, be referred to as the running charges component:
(d) There shall be ascertained in respect of that year an amount (in this Schedule referred to as the scheduled fixed works costs) calculated from the expression,
"A + A x B where 2 2 C"
"A
+
A
x
B
2
2
C"
(a) In respect of kilowatts, an amount equal to one-twelfth of the sum of the scheduled over-head charges and the scheduled fixed works costs,
(b) In respect of kilowatt-hours, a sum found by multiplying the number of kilowatt-hours supplied by the running charges component:
Provided that if in any year of account the station for any reason ceases to generate electricity for one thousand hours or more, then for the purposes of ascertaining the running charges component and the scheduled fixed works costs under Cls, (c) and (d), respectively of para. XII-
(i) The said Cl. (c) shall be construed as if there were substituted for the words "that year-" in both places where they occur, the words "the most recent year of account in which the station did not cease to generate electricity for one thousand hours or more" and as if to the said clause the following proviso were added, namely:
"Provided that so much of the said sum as is represented by the cost of fuel shall be adjusted to take account of the cost which would have been incurred had that fuel been consumed at the average prices prevailing in the actual year of account.";
(ii) In evaluating the expression contained in the said Cl. (d), the letter C shall be deemed to be equal to the sum of actual effective capacities for each month of the recent year of account in which the station did not cease to generate electricity for one thousand hours or more:
Provided further that if in any year of account there exist in the station any units of plant or works which have been declared by the licensee under sub-paragraph (2) of para. X to be surplus to his requirements in that year, there shall be added to the running charges component in respect of that year the amount, if any, by which that part of the said component attributable to the cost of fuel is less than ninety per centum of the corresponding part of the running charges component in respect of the year of account immediately preceding that in which the earliest installed capacity of the said units of plant or works first came into commercial operation in the station and in ascertaining the corresponding part as aforesaid, the fuel consumed shall be deemed to be of the same average quantity and to be consumed at the same average cost per ton as the fuel consumed in the year of account:
Provided further that if in respect of any month of the year of account any units of plant or works previously declared by the licensee as aforesaid to be surplus to his requirements are for the first time taken into account in assessing the scheduled effective capacity for that month, then in addition to the payment referred to in Cl. (a) the licensee shall pay to the Board a sum equal to any sums previously paid by the Board to the licensee on revenue account (in respect of any period prior to the date on which the said units of plant or works came into commission) by way of interest depreciation testing and turning-up expenses attributable to the said units of plant or works; and the sum to be paid as aforesaid shall become due in one or more installments and at such time or times as the Board may direct.
Provided that the Board in those circumstances may make it a condition that the licensee shall, until the date on which the scheduled effective capacity of the station becomes nil, pay to the Board in respect of each month in addition to the Grid Tariff onetwelfth of such proportion as the Board may fix of the annual charges by way of interest and depreciation which would have been payable to the Board in respect of the year of account had the said notice not been given:-
Provided further that in assessing the scheduled effective capacity for the purposes of the first proviso all units of plant or works which may have been under this Schedule declared or deemed to be surplus to the requirements of the licensee at the date of expiration of the said notice and all additional units of plant or works shall after that date always be deemed to be surplus to the requirements of the licensee:-
Provided further that after the expiration of the said notice the licensee shall not be entitled any time to purchase electricity from the Board at the price ascertained under Para. XIII.
PART III
PART III
PERMANENT CLOSING DOWN OF A CONTROLLED STATION
(a) (i) To sell the station at any time after date of closing down, and
(ii) To purchase the electricity supplied to him by the Board at the Grid Tariff, or
(b) (i) To require the Board to purchase the station or at the option of the licensee the undertaking of the licensee at the date of closing down at a price determined under the Fourth Schedule, and
(ii) To purchase the electricity supplied to him by the Board in accordance with the provisions of Part 11 as modified by para. XVIII:
Provided that where the station cannot be served from the distributing system of the licensee or where the severance of the station from the distributing system of the licensee is likely to affect prejudicially the interests of the licensee, the licensee shall be entitled to demand that the Board shall purchase his entire undertaking and on such demand being made the Board shall purchase the entire undertaking of the licensee. Any question arising under the proviso to this paragraph shall be referred to the arbitration under Section 76.
(a) The station shall, notwithstanding that it has been permanently closed down, be deemed to remain a controlled station in operation but to be such a station which has ceased to generate electricity for one thousand hours or more during each year of account;
(b) Cl. (a) of para. IX shall be construed as if the following were substituted thereof, namely:
"(a) The maximum capacity of the station, that is to say, the maximum capacity (expressed in kilowatts available for supply to feeders) of such plant and works appertaining to the generation of electricity at the date of closing down as would have been available for reliable and regular commercial operation on the first day of each month, had the station not been closed down under Part III and had no replacement of any major item of such plant or works been carried out;"
(c) Cl. (a) of para. XII shall be construed as if the following were substituted thereof, namely:
"(a) There shall be ascertained in respect of the year of account such annual charges by way of interest and depreciation attributable to the assets purchased by the Board under Part III as would have resulted from the application of Cls. (e) and (f)of Para. I of the Eighth Schedule had those assets remained in the ownership of the licensee:"
(d) Cls. (b) of Para. XII shall be construed as if the reference therein to Cls. (b) (c) and (d) of para. 1. of the Eighth Schedule were omitted;
(e) There shall be added to the sum payable by the licensee to the Board under Cl. (a) of Para. XIII in each month of 'the year of account a sum equal to one-twelfth of the amount calculated from the expression,-
"A x B where C"
C"
PART IV
PART IV
PURCHASE BY BOARD OF CONTROLLED STATION NOT TO BE CLOSED DOWN
(a) The station shall, notwithstanding that it has been purchased by the Board, be deemed to remain a controlled station;
(b) Cl. (a) of para. XII shall be construed as if the reference therein to the provisions of Eighth Schedule excluded a reference to Cls. (b), (c) and (d) of para. I of that Schedule, and as if the following proviso were added to the said Cl. (a), namely:-
"Provided that the annual charges to be included in accordance with Cls. (e) and (f) of para. I of the said Schedule shall be such as would have resulted had the assets purchased by the Board under Part IV remained in the ownership of the licensee,"
(c) Cl. (b) of para.XII shall be construed as if the reference therein to Cls. (b). (c) and (d) of para. I of the Eighth Schedule were omitted;
(d) There shall be added to the sum payable by the licensee to the Board under Cl. (a) of para. XIII in each month of the year of account a sum equal to one-twelfth of the amount calculated from the expression,
"A x B where C"
C"
THE SECOND SCHEDULE
(See Section 35)
SUPPLY BY BOARD TO LICENSEES OWNING STATIONS OTHER THAN CONTROLLED STATIONS
THE THIRD SCHEDULE
(See Section 36)
CLOSING DOWN OF GENERATING STATIONS OTHER THAN CONTROLLED STATIONS
Provided that where on the date of receipt of such notice the licensee is bound under any contract to purchase any/quantity of electricity from some other source, he may, for a period not exceeding two years after the date of closing down or for such further period, if any, as the Board may allow, continue to purchase electricity under the said contract from such other source.
(a)(i) To sell the station at any time after the date of closing down, and
(ii)To purchase the whole of the electricity supplied to him by the Board at the Grid Tariff, or
(b)(i) To require the Board to purchase the station [or the entire undertaking at the date of closing down at a price determined under the Fourth Schedule, and
(ii) To purchase the whole of the electricity supplied to him by the Board on the terms hereafter setout in this schedule.
(a) The maximum capacity of the station, that is to say, the maximum capacity (expressed in kilowatts available for supply to feeders) of such plant and works appertaining to the generation of electricity at the date of closing down as would have been available for reliable and regular commercial operation on the first day of the year of account, had the station not been closed down under this Schedule and had no replacement of any major item of such plant or works been carried out subsequent to the date of closing down.
(b) The number and size of units of plant and works, forming part of the aforesaid plant and works, which would have represented reasonable stand by in the section.
(c) The standby capacity of the station, that is to say, the number of kilowatts (expressed in kilowatts available for supply to feeders) by which the maximum capacity of the station would be reduced if the standby plant and works referred to Cl. (b) were to be left out of account.
(d) The agreed effective capacity of the station, that is to say, number of kilowatts by which the maximum capacity exceeds the standby capacity.
(a) The sums expended by the licensee and wholly attributable to the generation of electricity under the following heads, namely :
(i) Fuel;
(ii) Oil, water and stores consumed;
(iii) Salaries and wages and any contribution by the licensee for pensions, provident fund, superannuation and insurance of officers and servants;
(iv) Repairs and maintenance, and renewals not chargeable to capital account;
(v) Management, rents, rates and taxes (including supertax payable by the licensee as a company, but excluding other taxes on profits), insurance of plant and general establishment charges :
(vi) Any other expense on revenue account;
(b) The actual effective capacity of the station on the first day of each such year agreed in accordance with the principles set out in para, IX of the First Schedule.
(a) A number of kilowatts not exceeding the agreed effective capacity ascertained in respect of that year under para. VII, and
(b) A number of kilowatt-hours not exceeding the number of kilowatt-hours which bears the same proportion to the total number of kilowatt-hours required by the licensee in that year for the purposes of his undertaking as the agreed effective capacity ascertained in respect of that year bears to the total maximum demand of the licensee in that year for the said purposes.
(a) In respect of kilowatts, a fixed charge equal to the sum of-
"A + A x B 2 2 C"
"A
+
A
x
B
2
2
C"
"B x D C"
"B
x
D
C"
(iii) The annual charges by way of interest and depreciation ascertained in respect of the year of account under para. IX, where---
A= One-third of the total costs during the basic years under heads (ii), (iii), (iv) and (vi) set out in Cl. (a) of para. VIII ;
B= The agreed effective capacity for the year of account;
C= One-third of the sum of the actual effective capacities [ascertained under Cl. (b) of para. VIII] for each of the basic years;
D = One-third of the total costs during the basic years under head (v) set out in Cl. (a) of para. VIII;
(b) In respect of kilowatt-hours, a running charge per kilowatthour ascertained -
(i) By multiplying the total number of tons of fuel consumed in the station in the basic years by the estimate agreed between the Board and the licensee of the cost per ton which would have been incurred in delivering and handling the same quantity of fuel of equivalent calorific value to the furnaces in the station during the year of account, had the station remained in the ownership of the licensee, and
(ii) By dividing the total cost so found by the total number of units sent out from the station in the basic years.
Provided that the Board in those circumstances may make it a condition that the licensee shall, until the date on which agreed effective capacity of the station becomes nil, pay to the Board in each year of account in addition to The Grid Tariff a sum equal to such proportion as the Board may fix of the annual charges by way of interest and depreciation ascertained in respect of the year under para. IX:
Provided further that after the expiration of the said notice, the licensee shall not be entitled at any time to purchase electricity from the Board at the price ascertained under para. XI.
THE FOURTH SCHEDULE
(See Sections 23 and 37 and First and Third Schedules)
PRICE FOR UNDERTAKINGS; GENERATING STATIONS AND MAIN TRANSMISSION LINES PURCHASED BY THE BOARD
(a) "Date of vesting" means the date on which the undertaking, generating station, main transmission line or asset forming part of such station or line, as the case may be, vests in the Board;
(b) "Original cost.' of an asset means the amount of expenses certified or determined under para. II to have been properly incurred on and incidental to the provision of the asset for the purposes of the undertaking, generating station or main transmission line, as the case may be.
Provided that there shall be added to such sum as aforesaid on account of such purchase of the generating station or main transmission line such reasonable compensation as may be determined by the Board having due regard to the fact that a portion of the undertaking is to be acquired:
Provided further that if the Board or the licensee is dissatisfied with the sum so certified, the matter shall, in default of agreement between them, be determined [by arbitration] as provided in Section 76.
THE FIFTH SCHEDULE
(See Section 41)
CHARGES FOR USE [BY BOARD FOR GENERATING COMPANY] OF TRANSMISSION LINES AND MAIN TRANSMISSION LINES
(a) The actual cost of maintenance of the lines, including renewals thereof not chargeable to capital account;
(b) Sums paid in respect of the lines for insurance and as rents, rates and taxes [(including all taxes payable on income and profits)] -,
(c) The proportion of management and general establishment charges properly attributable to the lines;
(d) Any other expenses on revenue account properly attributable to the lines;
(e) [Interest on the depreciated cost of the lines shown in the books, of the undertaking and properly attributable to the lines (whether defrayed out of capital or revenue and interest on such working capital as is properly attributable to the lines] :
Provided that for the purpose of ascertaining the principal on which interest is payable within the meaning of this clause, there shall be left out of account any part of principal interest on which is charged to capital;
(f) An allowance for depreciation of an amount determined in respect of the lines in accordance with the provisions of para. VI of the sixth Schedule.
(i) "Depreciated cost of the lines" means original cost thereof as determined in accordance with the provisions of subparagraph (6) of para. XVII of Sixth Schedule less the amount written of or set aside on account of depreciation on fixed assets and the amount written off in respect of intangible assets thereof in the books of the undertaking before or after the commencement of this Act;
(ii) The rate of interest shall be,-
(a) Where the licensee owning the lines is a local authority, the average rate payable on the money raised by that authority for the purpose of constructing the lines;
(b) In any other case, the Reserve Bank rate ruling at the beginning of the year referred to in para. I plus two per centum.]
THE SIXTH SCHEDULE
[(See Sections 57 and 57-A)]
FINANCIAL PRINCIPLES AND THEIR APPLICATION
Provided that such [charges] shall not be enhanced more than once in any year of account:
Provided further that the licensee shall not be deemed to have failed so to adjust his Substituted by Act 30 of 1966, Section 21, for "rates" (w.r.e.f. 1.4.1966).[charges] if the clear profit in any year of account has not exceeded the amount of reasonable return by [twenty] per centum of the amount of reasonable return:
Provided further that the licensee shall not enhance the [charges] for the supply of electricity until after the expiry of a notice in writing of not less than sixty clear days of his intention to so enhance the [charges] , given by him to the State Government and to the Board :
Provided further that if the [charges] of supply fixed in pursuance of the recommendations of a rating committee constituted under Section 57-A are lower than those notified by the licensee under and in accordance with the preceding proviso, the licensee shall refund to the consumers the excess amount recovered by him from them :]
[Provided also that nothing in this Schedule shall be deemed to prevent a licensee from levying with the previous approval of the State Government, minimum charges for supply of electricity for any purpose.]
Provided that the share of money in the Consumers' Rebate Reserve payable to the consumers who are not traceable or who have ceased to be consumers in relation to that undertaking, may be utilised in the development works of the purchaser.]
(a) Expenses or loss of profits arising out of accidents, strikes or circumstances which the management could not have prevented;
(b) Expenses on replacement or removal of plant or works other than expenses requisite for normal maintenance or renewal;
(c) Compensation payable under any law for the time being in force and for which no other provision is made.
STATE AMENDMENTS ▼
State Amendment
West Bengal
(a) after para. V (1), Sub para. (1 -A) namely:--
"(1-A)The licensee may, with the previous approval of the State Government, take an advance from the Contingency Reserve during the currency of the licence to meet such charges and on such terms and conditions as the State Government may determine".
(b) Sub-paragraph. 2, substituted the following sub-para., namely :-
"(2) On the purchase of the undertaking the following amounts shall be handed over to the purchaser and maintained as Contingency Reserve-
(a) The Contingency Reserve after deduction of the amount drawn under sub-para (1): and
(b) The amount which has not been repaid out of the taken from the Contingency Reserve under sub-paragraph (I -A), together with the interest, if any, payable on the advance:
Provided that where the undertaking is purchased by the Board or the State Government, the amounts referred to in Cls. (a) and (b) above, shall after deduction of the amount of compensation, if any, payable to the employees of the Outgoing licensee under any law for the time being in force, be handed over to the Board or the State Government, as the case may be".-W.B. Act, 42 of 1979, Section 3 (w.e f. 17th March, 1980).
Provided that if in any accounting year, the clear profit [excluding the special appropriation to be made under item (va) of Cl.(c) of sub-paragraph (2) of para. XVII together with the accumulations, if any, in the Tariffs and Dividends Control Reserve less the sum calculated as aforesaid falls short of the reasonable return, the sum to be appropriated to the Development Reserve in respect of such accounting year shall be reduced by the amount of the shortfall.
(b) Where in any particular year depreciation cannot be adjusted against revenue the same may be carried over to subsequent years.
(c) The provisions of this paragraph shall apply to the charging of depreciation for the year in which The Electricity (Supply) Amendment Act, 1978 (23 of 1978),comes into force.]
Provided that for the purpose of depreciation under para. VI, the total original cost of construction of the service lines shall be taken into account.
(a) In respect of the first Rs. 1 lakhs of such net profits - 10 percent. and
(b) In respect of all net profits in excess of Rs. 2 lakhs - 7 percent.
(a) In respect of the first Rs. 1 lakh of operating expenditure -8 per cent.
In respect of the next Rs. 2 lakhs of operating expenditure - 5 per cent.
In respect of the next Rs. 7 lakhs of operating expenditure - 2.5 per cent.
In respect of all operating expenditure in excess of Rs. 10 lakhs - 1.5 per cent.
(b) In respect of the first Rs. 1 lakh of capital expenditure incurred during the year of account - 4 per cent.
Explanation.
Definitions
Definitions
(1) "Capital base" means the sum of-
[(a) the original cost of fixed assets available for use and necessary for the purpose of the undertaking subject to the provisions of para. XII in respect of servicelines, and the excess amount referred to in the proviso to sub-paragraph (2) of para. VII in respect of any fixed asset which has ceased to be available for use;]
(b) The cost of intangible assets [including expenses on account of new capital issue] ;
(c) The original cost of works in progress:
[(d) The amount of investments compulsorily made under para. IV of this Schedule together with the amount of such investments made after the commencement of this Act from contributions towards depreciation as in the opinion of the Authority could not be utilised for the purpose of the business of electricity supply of the undertaking:]
(e) An amount on account of working capital equal to the sum of-
(i) One-twelfth of the sum of the book cost of stores, materials and supplies including fuel on hand at the end of each month of the year of account;
(ii) One-twelfth of the sum of [cash and bank balances (whether credit or debit)] and call and short-term deposits at the end of each month of the year of account, not exceeding in the aggregate an amount equal to one-quarter of the expenditure under sub-para. (2)(b) of this paragraph excluding [subclauses (i), (iv) (iv-a), (iv-b) and (x)] ;----
less-
(i) The amount written off or set aside on account of depreciation of fixed assets and amounts written off in respect of intangible assets in the books of the undertaking before or after the commencement of this Act; [***]
(ii) The amount of any loans advanced by the Board [***] ;
[(ii-a) The amount of any loans borrowed from organisations or Institutions approved by the State Government:
(ii-b) The amount of any debentures issued by the licensee :
[(iii) The amounts deposited in cash with the licensee by consumers by way of security;]
(iv) The amount standing to the credit of the Tariffs and Dividends Control Reserve 8 [at the beginning of the year of account];
[(v) The amount standing to the credit of the Development Reserve at the close of the year of account;]
(vi) The amount carried forward [at the beginning of the year of account] in the accounts of the licensee for distribution to the consumers under para. II.]
The difference between the amount of income and the sum of expenditure plus specific appropriations, made up in each case as follows: -
(a) Income derived from-
(i) Gross receipts from sale of energy, less discounts applicable thereby;
(ii) Rental of meters and other apparatus hired to consumers;
(iii) Sale and repair of lamps and apparatus:
(iv) Rents, less outgoings not otherwise provided for;
(v) Transfer fees:
(vi) Investments fixed and call deposits and bank balances;
(vii) Other general receipts accountable in the assessment of Indian Income-Tax and arising from and ancillary or incidental to the business of Electricity supply, -
(b) [Expenditure properly incurred on] -
(i) Generation and purchase of energy:
(ii) Distribution and sale of energy;
(iii) Rents, rates and taxes, other than all taxes on income and profits;
(iv) Interest on loans advanced by the Board [***] ;
[(iv-a) Interest on loans borrowed from organisations or institutions approved by the State Government;
(iv-b) Interest on debentures issued by the licensee;
(v) Interest on security deposits;
(vi) Legal charges;
(vii) Bad debts;
(viii) Auditor's fees;
(ix) Management including managing agent's remuneration as provided for in para. XIII;
(x) Depreciation, computed as [hereinbefore] set out;
(xi) Other expenses [(excluding interest on debentures and loans)] , admissible under the law for the time being in force in the assessment of Indian Income-tax and arising from and ancillary or incidental to the business of electricity supply;
[(xii) Contributions to provident fund, staff pension and gratuity computed under any law for the time being in force or any such scheme as is approved by the State Government;
(xii-a) Expenses on apprentice and other training schemes;]
(a) Where any dispute regarding such bonus has been referred to any Tribunal or other authority under any law for the time being in force relating to industrial or labour disputes, in accordance with the decision of such Tribunal or authority;
(b) In any other case, with the approval of the State Government;]
(c) Special appropriations sufficient to cover-
(i) Previous losses (that is to say excess of expenditure over income) which have arisen from the business of electricity supply to the extent in any year [permitted by the State Government] ;
(ii) All taxes on income and profits;
(iii) Instalments of written-down amounts in respect of intangible assets and new capital issue expenses to the extent in any year actually appropriated for the purpose in the books of the undertaking: provided that the amounts so appropriated shall not exceed the amount found by dividing the writtendown cost of such assets by the number of complete years remaining before the next option of purchase under the licence arises;
(iv) Contributions to the Contingency Reserve, computed as [herein before] set out;
(v) Contributions towards arrears of depreciation;
[(v-a) Contributions to the Development Reserve referred to in para. V-A;]
(v-b) Debt redemption obligation of the private licensees which may be done on a year to year basis, taking into account the requirements of debt redemption and resource generation through depreciation, retained surplus;] :
(vi) Other special appropriations permitted by the State Government.
Underwriter's commission and such preliminary and promotional expenditure shown as a debit in the capital account of the undertaking, as has fairly arisen in promoting the business of electricity supply excluding any amount paid on account of goodwill.
In the case of a company, the amount of ordinary capital paid up and attributable to the undertaking of the licensee;
(a) The cost of the asset to the licensee, including the cost of delivery and all charges properly incurred in erecting and bringing the asset into beneficial use;
(c) A proper addition on account of supervision not exceeding fifteen per centum of the cost referred to in sub-paragraph (a), so however that the original cost of any asset shall not in any case exceed the original cost attributed thereto in the books of the undertaking.
The amount of paid-up capital attributable to the undertaking of the licensee, issued on such preferred term as are sufficient to qualify it for such description.
In respect of any year of account, the sum of the following : -
(a) The amount found by applying the standard rate to the capital base at the end of that year;
[(b) The income derived from investments other than those included in the capital base under provisions of Cl. (d) of sub-paragraph (1);]
(c) And amount equal to one-half of one per centum on any loans advanced by the Board [***] ;
(C-2) An amount equal to one-half of one per centum on the amounts realised by the issue of debentures;]
[(d) An amount equal to one-half of one per centum on the accumulations in the Development Reserve created under para. V-A of this Schedule;]
[(e) Such other amount as may be allowed by the Central Government, having regard to the prevailing tax structure in the country.]
(a) In relation to that part of the capital base for that year of account which is equivalent to the capital base as on the 31st day of March, 1955, seven per centum per annum;
(b) In relation to the remaining [capital base for that year, the Reserve Bank rate ruling at the beginning of that year plus-
(i) Two per centum for investments made up to the date of the commencement of The Electricity Laws (Amendment) Act, 1991; and
(ii) Five per centum for investments made thereafter:]
Original cost less the amounts set aside or written-off on account of original in the books of the undertaking.
THE SEVENTH SCHEDULE
[ Omitted by the Electricity Supply (Amendment) Act, 1978 (23 of 1978), section 24 (w.e.f. 3-6-1978). ]
THE EIGHTH SCHEDULE
( See the First and Third Schedules )
DETERMINATION OF COST OF PRODUCTION OF ELECTRICITY AT GENERATING STATIONS
(a) sums expended for fuel, oil, water and stores consumed, for salaries and wages, and contribution by the licensee for pensions, provident fund, superannuation and insurance officers and other employees] for repairs and maintenance and for renewals not chargeable to capital account;
(b) sums paid in respect of the station for insurance and as rents, rates and taxes [including all taxes payable on income and profits)] ;
(c) the proportion of management and general establishment charges properly attributable to the station;
(d) any other expenses on revenue account properly attributable to the station;
(e) [Interest on the depreciated cost of the station shown in the books of the undertaking and properly attributable to the station (whether defrayed out of capital or revenue) and interest on working capital properly attributable to the station and the production of electricity therein] :
Provided that for the purpose of ascertaining the principal on which interest is payable within the meaning of this clause, there shall be left out of account any part of principal on which interest is payable out of capital;
(f) an allowance for depreciation of an amount determined in respect of the station in accordance with the provisions of paragraph VI of the Sixth Schedule.
(i) "depreciated cost of the station" means original cost thereof as determined in accordance with the provisions of sub-paragraph (6) of paragraph XVII of the Sixth Schedule less the amount written off or set aside on account of depreciation on fixed assets and the amount written off in respect of intangible assets thereof in the books of the undertaking before or after the commencement of this Act;
(ii) the rate of interest shall be,-]
(a) on such part of the principal on which interest is payable within the meaning of the said clause as has been advanced on loan by the Board under paragraph I of the First Schedule, the actual rate charged by the Board plus one-half of one per centum per annum on the loan in the year of account;
(b) on the balance of the said principal-
(i) where the licensee owning the station is a local authority, the average rate payable in the year of account on the money raised by that authority for the purposes of the station;
(ii) in any other case, [the Reserve Bank rate ruling at the beginning of that year plus two per centaur] .
THE NINTH SCHEDULE
( See the First Schedule )
ALLOCATION OF COSTS OF PRODUCTION AT GENERATING STATIONS
(a) the average load factor of a station shall be expressed as a percentage, and shall be ascertained by multiplying the number of kilowatt hours supplied from the station during the year of account by 100, and dividing the product so obtained by the product of the average monthly maximum demand multiplied by the number of hours during which the station was in commission in the year of account;
(b) the average monthly maximum demand shall be the arithmetical average of the monthly maximum demands on the station in those calendar months during which the station was in commission in the year of account;
(c) a station shall be deemed to be in commission when the whole or any portion of the plant in the station is generating electricity or is in readiness to generate electricity upon demand;
(d) "cost of fuel" means the sums expended for fuel consumed plus the cost of any transport, handling, preparation or treatment incurred in connection with the delivery of fuel to the boiler hoppers, furnaces or engines and in connection with the disposal of the products or residues of combustion, plus the proportion of salaries and wages and any contributions made by the owner of the station for pensions, provident fund, superannuation and insurance of officers and servants properly attributable to such delivery or disposal, less any sums received from the sale of any products or residues of combustion;
(e) "cost of oil, water and stores" means the sums expended for oil, water and stores consumed;
(f) "cost of repairs, maintenance and renewals" means the sums expended for repairs and maintenance and for renewals not chargeable to capital account, together with the proportion of salaries and wages and any contributions made by the owner of the station for pensions, provident hind, superannuation and insurance of [officers and other employees] properly attributable to repairs, maintenance and renewals;
(g) "salaries and wages" means the sums expended for salaries and wages and any contributions made by the owner of the station for pensions, provident fund, superannuation and insurance of officers and servants, less the proportion of such sums properly attributable to the cost of fuel under clause (d) and to the cost of repairs, maintenance and renewals under clause (f).
(a) of the costs, charges and allowances set out in clause (a) of paragraph I of the said Schedule, portions calculated from the appropriate formulae set out in paragraph III;
(b) the whole of the costs, charges and allowances set out in the remaining clauses of paragraph I of the said Schedule.
(a) cost of fuel ... 100 100+12.8
L (b) cost of oil, water and stores ... 100 100+9.66
L (c) salaries and wages ... 100 100+0.38
L (d) cost of repairs, maintenance and renewals ... 100 100+0.0001
N L
...
100
100+12.8
L
...
100
100+9.66
L
...
100
100+0.38
L
...
100
100+0.0001
N L
Section 83 • The Electricity (Supply) Act, 1948
83. Saving of application of Act
the-electricity-supply-act-1948-sec-83.json
•
Section 83
{
"act_title": "The Electricity (Supply) Act, 1948",
"act_slug": "the-electricity-supply-act-1948",
"section_label": "Section",
"section": {
"number": "83",
"title": "83. Saving of application of Act",
"chapter": null,
"content": "THE FIRST SCHEDULE\n(See Sections 34 and 36)\nARRANGEMENTS IN RESPECT OF CONTROLLED STATIONS\nPART I\nPART I\nASSUMPTION OF CONTROL\n(a) Subject to such directions as the Board may from time to time give him, to keep the station at all times in good and substantial repair and condition and ready for use, together with adequate staff for operating, maintaining and controlling the station, and not to make any substantial alterations or renewals in, or remove any essential or substantial part of, the station without the consent in writing of the Board;\n(b) To operate the station so as to generate such quantity of electricity with such units of plant at such rates of output and at such times, or to cease to generate electricity during such periods as the Board may direct;\n(c) To carry out as soon as may be practicable such reasonable extensions, alterations or renewals of the station or any part thereof as the Board may from time to time direct;\n(d) To supply to the Board all the electricity generated at the station.\nExplanation.\nProvided that where on the date of the receipt of such notice the licensee is bound under any contract to purchase any quantity of electricity from some other source, he may, for a period not exceeding two years after the date of control or for such further period, if any, as the Board may allow, continue to purchase electricity under the said contract from such other source.\n(a) Such of the several controlled stations as are interconnected shall, for the purposes of this Schedule, be deemed to comprise a single controlled station, and, unless the subject or context otherwise requires, the provisions of this Schedule shall be construed as if the word \"combined\" had been inserted before the word \"station\" or the words \"generating station\" wherever they occur;\n(b) The electricity supplied at the several controlled stations by the licensee to the Board, or by the Board to the licensee, shall each respectively be treated as single supplies ;\n(c) In the application of Cl. (a) of para. XII, the costs of production at each of the several controlled stations shall be separately ascertained, and in application of Cl. (c) of the said paragraph-\n(i) The sum ascertained in accordance with Cl. (a) of para. I of the Eighth Schedule in respect of each of the several controlled stations shall be separately allocated between fixed costs and running costs, and\n(ii) The sum of the several fixed costs and the sum of the several running costs shall be the fixed costs and the running costs respectively of the combined station:\n(d) In directing the operation of the combined station under Cl. (b) of sub-paragraph (1) of para. 1, the Board shall have regard to the nature and capacity of the licensee's transmission system inter-connecting the several controlled stations and to the requirements of the licensee at each of those stations.\n(a) All the provisions of this Schedule except para. II and this paragraph shall, in relation to the licensee, cease to have effect;\n(b) (b) The Board shall supply the licensee with the electricity required by him under para. 11 at such price and on such conditions as the Board may determine.\nPART II\nPART II\nPRICE TO BE PAID FOR ELECTRICITY SUPPLIED BY THE BOARD UNDER PART I\n(a) The maximum capacity of the station, that is to say, the maximum capacity (expressed in kilowatts available for supply to feeders) of such plant and works appertaining to the generation of electricity at the station as where available for reliable and regular commercial operation on the first day of the month, including the capacity of such plant and works as were temporarily out of commission;\n(b) The number and size of units of plant works, forming part of the aforesaid plant and works, which ought properly to be deemed to be stand-by if the station were not a controlled station;\n(c) The stand-by capacity of the station, that is to say, the number of kilowatts (expressed in kilowatts available for supply feeders) by which the maximum capacity of the station would be reduced if the stand-by plant and works referred to in Cl. (b) were to be left out of account;\n(d) The actual effective capacity of the station, that is to say, the number of kilowatts by which the maximum capacity exceeds the stand-by capacity.\nProvided that the licensee shall not declare to be surplus to his requirements any such units of plant or works as were installed or were an order at the date of control or which were included in any previous computation of the scheduled effective capacity :\nProvided further that if as a result of the licensee declaring as surplus to his requirement any units of plant or works, the scheduled effective capacity is in respect of any month computed to be less than the maximum demand of the licensee on the station for the purposes of his own undertaking, then such units of plant or works and all further additional units of plant or works shall thereafter always be deemed to be surplus to the requirements of the licensee as aforesaid unless the Board decides otherwise.\nProvided that if the station is a hydro-electric station or if any unit of a combined station is a hydroelectric unit, the number of kilowatthours which the licensee shall be entitled to purchase as aforesaid shall be reduced by such amount, if any, as may be agreed between the Board and the licensee, having regard to the number of 'kilowatt-hours actually supplied in the month from such hydroelectric station or unit.\n(a) There shall be ascertained in respect of that year the cost of production at the station in accordance with the provisions of the Eighth Schedule:\n(b) There shall be deducted from the total sum ascertained, in respect of the year under Cls. (b), (c), ((I). (e) and (f) of para. I of the Eighth Schedule, such proportion of the charges referred to in the said clauses as are wholly attributable to so much of the plant and works, if any, as has been declared by the licensee under Sub-paragraph (2) of para. X to be surplus to his requirements, and the balance remaining after such deduction shall, for the purposes of this schedule. be referred to as the schedule overhead charges:\nProvided that in assessing the said proportion, regard shall be had to the period during which any such plant or works were declared to be surplus as aforesaid;\n(c) There shall be allocated between fixed costs and running costs in accordance with the provisions of the Ninth Schedule, the sum ascertained in respect of' that year under Cl. (a) of para. I of the Eighth Schedule, and the amount of running costs divided by the number of kilowatt-hours supplied from the station in that year shall for the purposes of the Schedule, be referred to as the running charges component:\n(d) There shall be ascertained in respect of that year an amount (in this Schedule referred to as the scheduled fixed works costs) calculated from the expression,\n\"A + A x B where 2 2 C\"\n\"A\n+\nA\nx\nB\n2\n2\nC\"\n(a) In respect of kilowatts, an amount equal to one-twelfth of the sum of the scheduled over-head charges and the scheduled fixed works costs,\n(b) In respect of kilowatt-hours, a sum found by multiplying the number of kilowatt-hours supplied by the running charges component:\nProvided that if in any year of account the station for any reason ceases to generate electricity for one thousand hours or more, then for the purposes of ascertaining the running charges component and the scheduled fixed works costs under Cls, (c) and (d), respectively of para. XII-\n(i) The said Cl. (c) shall be construed as if there were substituted for the words \"that year-\" in both places where they occur, the words \"the most recent year of account in which the station did not cease to generate electricity for one thousand hours or more\" and as if to the said clause the following proviso were added, namely:\n\"Provided that so much of the said sum as is represented by the cost of fuel shall be adjusted to take account of the cost which would have been incurred had that fuel been consumed at the average prices prevailing in the actual year of account.\";\n(ii) In evaluating the expression contained in the said Cl. (d), the letter C shall be deemed to be equal to the sum of actual effective capacities for each month of the recent year of account in which the station did not cease to generate electricity for one thousand hours or more:\nProvided further that if in any year of account there exist in the station any units of plant or works which have been declared by the licensee under sub-paragraph (2) of para. X to be surplus to his requirements in that year, there shall be added to the running charges component in respect of that year the amount, if any, by which that part of the said component attributable to the cost of fuel is less than ninety per centum of the corresponding part of the running charges component in respect of the year of account immediately preceding that in which the earliest installed capacity of the said units of plant or works first came into commercial operation in the station and in ascertaining the corresponding part as aforesaid, the fuel consumed shall be deemed to be of the same average quantity and to be consumed at the same average cost per ton as the fuel consumed in the year of account:\nProvided further that if in respect of any month of the year of account any units of plant or works previously declared by the licensee as aforesaid to be surplus to his requirements are for the first time taken into account in assessing the scheduled effective capacity for that month, then in addition to the payment referred to in Cl. (a) the licensee shall pay to the Board a sum equal to any sums previously paid by the Board to the licensee on revenue account (in respect of any period prior to the date on which the said units of plant or works came into commission) by way of interest depreciation testing and turning-up expenses attributable to the said units of plant or works; and the sum to be paid as aforesaid shall become due in one or more installments and at such time or times as the Board may direct.\nProvided that the Board in those circumstances may make it a condition that the licensee shall, until the date on which the scheduled effective capacity of the station becomes nil, pay to the Board in respect of each month in addition to the Grid Tariff onetwelfth of such proportion as the Board may fix of the annual charges by way of interest and depreciation which would have been payable to the Board in respect of the year of account had the said notice not been given:-\nProvided further that in assessing the scheduled effective capacity for the purposes of the first proviso all units of plant or works which may have been under this Schedule declared or deemed to be surplus to the requirements of the licensee at the date of expiration of the said notice and all additional units of plant or works shall after that date always be deemed to be surplus to the requirements of the licensee:-\nProvided further that after the expiration of the said notice the licensee shall not be entitled any time to purchase electricity from the Board at the price ascertained under Para. XIII.\nPART III\nPART III\nPERMANENT CLOSING DOWN OF A CONTROLLED STATION\n(a) (i) To sell the station at any time after date of closing down, and\n(ii) To purchase the electricity supplied to him by the Board at the Grid Tariff, or\n(b) (i) To require the Board to purchase the station or at the option of the licensee the undertaking of the licensee at the date of closing down at a price determined under the Fourth Schedule, and\n(ii) To purchase the electricity supplied to him by the Board in accordance with the provisions of Part 11 as modified by para. XVIII:\nProvided that where the station cannot be served from the distributing system of the licensee or where the severance of the station from the distributing system of the licensee is likely to affect prejudicially the interests of the licensee, the licensee shall be entitled to demand that the Board shall purchase his entire undertaking and on such demand being made the Board shall purchase the entire undertaking of the licensee. Any question arising under the proviso to this paragraph shall be referred to the arbitration under Section 76.\n(a) The station shall, notwithstanding that it has been permanently closed down, be deemed to remain a controlled station in operation but to be such a station which has ceased to generate electricity for one thousand hours or more during each year of account;\n(b) Cl. (a) of para. IX shall be construed as if the following were substituted thereof, namely:\n\"(a) The maximum capacity of the station, that is to say, the maximum capacity (expressed in kilowatts available for supply to feeders) of such plant and works appertaining to the generation of electricity at the date of closing down as would have been available for reliable and regular commercial operation on the first day of each month, had the station not been closed down under Part III and had no replacement of any major item of such plant or works been carried out;\"\n(c) Cl. (a) of para. XII shall be construed as if the following were substituted thereof, namely:\n\"(a) There shall be ascertained in respect of the year of account such annual charges by way of interest and depreciation attributable to the assets purchased by the Board under Part III as would have resulted from the application of Cls. (e) and (f)of Para. I of the Eighth Schedule had those assets remained in the ownership of the licensee:\"\n(d) Cls. (b) of Para. XII shall be construed as if the reference therein to Cls. (b) (c) and (d) of para. 1. of the Eighth Schedule were omitted;\n(e) There shall be added to the sum payable by the licensee to the Board under Cl. (a) of Para. XIII in each month of 'the year of account a sum equal to one-twelfth of the amount calculated from the expression,-\n\"A x B where C\"\nC\"\nPART IV\nPART IV\nPURCHASE BY BOARD OF CONTROLLED STATION NOT TO BE CLOSED DOWN\n(a) The station shall, notwithstanding that it has been purchased by the Board, be deemed to remain a controlled station;\n(b) Cl. (a) of para. XII shall be construed as if the reference therein to the provisions of Eighth Schedule excluded a reference to Cls. (b), (c) and (d) of para. I of that Schedule, and as if the following proviso were added to the said Cl. (a), namely:-\n\"Provided that the annual charges to be included in accordance with Cls. (e) and (f) of para. I of the said Schedule shall be such as would have resulted had the assets purchased by the Board under Part IV remained in the ownership of the licensee,\"\n(c) Cl. (b) of para.XII shall be construed as if the reference therein to Cls. (b). (c) and (d) of para. I of the Eighth Schedule were omitted;\n(d) There shall be added to the sum payable by the licensee to the Board under Cl. (a) of para. XIII in each month of the year of account a sum equal to one-twelfth of the amount calculated from the expression,\n\"A x B where C\"\nC\"\nTHE SECOND SCHEDULE\n(See Section 35)\nSUPPLY BY BOARD TO LICENSEES OWNING STATIONS OTHER THAN CONTROLLED STATIONS\nTHE THIRD SCHEDULE\n(See Section 36)\nCLOSING DOWN OF GENERATING STATIONS OTHER THAN CONTROLLED STATIONS\nProvided that where on the date of receipt of such notice the licensee is bound under any contract to purchase any/quantity of electricity from some other source, he may, for a period not exceeding two years after the date of closing down or for such further period, if any, as the Board may allow, continue to purchase electricity under the said contract from such other source.\n(a)(i) To sell the station at any time after the date of closing down, and\n(ii)To purchase the whole of the electricity supplied to him by the Board at the Grid Tariff, or\n(b)(i) To require the Board to purchase the station [or the entire undertaking at the date of closing down at a price determined under the Fourth Schedule, and\n(ii) To purchase the whole of the electricity supplied to him by the Board on the terms hereafter setout in this schedule.\n(a) The maximum capacity of the station, that is to say, the maximum capacity (expressed in kilowatts available for supply to feeders) of such plant and works appertaining to the generation of electricity at the date of closing down as would have been available for reliable and regular commercial operation on the first day of the year of account, had the station not been closed down under this Schedule and had no replacement of any major item of such plant or works been carried out subsequent to the date of closing down.\n(b) The number and size of units of plant and works, forming part of the aforesaid plant and works, which would have represented reasonable stand by in the section.\n(c) The standby capacity of the station, that is to say, the number of kilowatts (expressed in kilowatts available for supply to feeders) by which the maximum capacity of the station would be reduced if the standby plant and works referred to Cl. (b) were to be left out of account.\n(d) The agreed effective capacity of the station, that is to say, number of kilowatts by which the maximum capacity exceeds the standby capacity.\n(a) The sums expended by the licensee and wholly attributable to the generation of electricity under the following heads, namely :\n(i) Fuel;\n(ii) Oil, water and stores consumed;\n(iii) Salaries and wages and any contribution by the licensee for pensions, provident fund, superannuation and insurance of officers and servants;\n(iv) Repairs and maintenance, and renewals not chargeable to capital account;\n(v) Management, rents, rates and taxes (including supertax payable by the licensee as a company, but excluding other taxes on profits), insurance of plant and general establishment charges :\n(vi) Any other expense on revenue account;\n(b) The actual effective capacity of the station on the first day of each such year agreed in accordance with the principles set out in para, IX of the First Schedule.\n(a) A number of kilowatts not exceeding the agreed effective capacity ascertained in respect of that year under para. VII, and\n(b) A number of kilowatt-hours not exceeding the number of kilowatt-hours which bears the same proportion to the total number of kilowatt-hours required by the licensee in that year for the purposes of his undertaking as the agreed effective capacity ascertained in respect of that year bears to the total maximum demand of the licensee in that year for the said purposes.\n(a) In respect of kilowatts, a fixed charge equal to the sum of-\n\"A + A x B 2 2 C\"\n\"A\n+\nA\nx\nB\n2\n2\nC\"\n\"B x D C\"\n\"B\nx\nD\nC\"\n(iii) The annual charges by way of interest and depreciation ascertained in respect of the year of account under para. IX, where---\nA= One-third of the total costs during the basic years under heads (ii), (iii), (iv) and (vi) set out in Cl. (a) of para. VIII ;\nB= The agreed effective capacity for the year of account;\nC= One-third of the sum of the actual effective capacities [ascertained under Cl. (b) of para. VIII] for each of the basic years;\nD = One-third of the total costs during the basic years under head (v) set out in Cl. (a) of para. VIII;\n(b) In respect of kilowatt-hours, a running charge per kilowatthour ascertained -\n(i) By multiplying the total number of tons of fuel consumed in the station in the basic years by the estimate agreed between the Board and the licensee of the cost per ton which would have been incurred in delivering and handling the same quantity of fuel of equivalent calorific value to the furnaces in the station during the year of account, had the station remained in the ownership of the licensee, and\n(ii) By dividing the total cost so found by the total number of units sent out from the station in the basic years.\nProvided that the Board in those circumstances may make it a condition that the licensee shall, until the date on which agreed effective capacity of the station becomes nil, pay to the Board in each year of account in addition to The Grid Tariff a sum equal to such proportion as the Board may fix of the annual charges by way of interest and depreciation ascertained in respect of the year under para. IX:\nProvided further that after the expiration of the said notice, the licensee shall not be entitled at any time to purchase electricity from the Board at the price ascertained under para. XI.\nTHE FOURTH SCHEDULE\n(See Sections 23 and 37 and First and Third Schedules)\nPRICE FOR UNDERTAKINGS; GENERATING STATIONS AND MAIN TRANSMISSION LINES PURCHASED BY THE BOARD\n(a) \"Date of vesting\" means the date on which the undertaking, generating station, main transmission line or asset forming part of such station or line, as the case may be, vests in the Board;\n(b) \"Original cost.' of an asset means the amount of expenses certified or determined under para. II to have been properly incurred on and incidental to the provision of the asset for the purposes of the undertaking, generating station or main transmission line, as the case may be.\nProvided that there shall be added to such sum as aforesaid on account of such purchase of the generating station or main transmission line such reasonable compensation as may be determined by the Board having due regard to the fact that a portion of the undertaking is to be acquired:\nProvided further that if the Board or the licensee is dissatisfied with the sum so certified, the matter shall, in default of agreement between them, be determined [by arbitration] as provided in Section 76.\nTHE FIFTH SCHEDULE\n(See Section 41)\nCHARGES FOR USE [BY BOARD FOR GENERATING COMPANY] OF TRANSMISSION LINES AND MAIN TRANSMISSION LINES\n(a) The actual cost of maintenance of the lines, including renewals thereof not chargeable to capital account;\n(b) Sums paid in respect of the lines for insurance and as rents, rates and taxes [(including all taxes payable on income and profits)] -,\n(c) The proportion of management and general establishment charges properly attributable to the lines;\n(d) Any other expenses on revenue account properly attributable to the lines;\n(e) [Interest on the depreciated cost of the lines shown in the books, of the undertaking and properly attributable to the lines (whether defrayed out of capital or revenue and interest on such working capital as is properly attributable to the lines] :\nProvided that for the purpose of ascertaining the principal on which interest is payable within the meaning of this clause, there shall be left out of account any part of principal interest on which is charged to capital;\n(f) An allowance for depreciation of an amount determined in respect of the lines in accordance with the provisions of para. VI of the sixth Schedule.\n(i) \"Depreciated cost of the lines\" means original cost thereof as determined in accordance with the provisions of subparagraph (6) of para. XVII of Sixth Schedule less the amount written of or set aside on account of depreciation on fixed assets and the amount written off in respect of intangible assets thereof in the books of the undertaking before or after the commencement of this Act;\n(ii) The rate of interest shall be,-\n(a) Where the licensee owning the lines is a local authority, the average rate payable on the money raised by that authority for the purpose of constructing the lines;\n(b) In any other case, the Reserve Bank rate ruling at the beginning of the year referred to in para. I plus two per centum.]\nTHE SIXTH SCHEDULE\n[(See Sections 57 and 57-A)]\nFINANCIAL PRINCIPLES AND THEIR APPLICATION\nProvided that such [charges] shall not be enhanced more than once in any year of account:\nProvided further that the licensee shall not be deemed to have failed so to adjust his Substituted by Act 30 of 1966, Section 21, for \"rates\" (w.r.e.f. 1.4.1966).[charges] if the clear profit in any year of account has not exceeded the amount of reasonable return by [twenty] per centum of the amount of reasonable return:\nProvided further that the licensee shall not enhance the [charges] for the supply of electricity until after the expiry of a notice in writing of not less than sixty clear days of his intention to so enhance the [charges] , given by him to the State Government and to the Board :\nProvided further that if the [charges] of supply fixed in pursuance of the recommendations of a rating committee constituted under Section 57-A are lower than those notified by the licensee under and in accordance with the preceding proviso, the licensee shall refund to the consumers the excess amount recovered by him from them :]\n[Provided also that nothing in this Schedule shall be deemed to prevent a licensee from levying with the previous approval of the State Government, minimum charges for supply of electricity for any purpose.]\nProvided that the share of money in the Consumers' Rebate Reserve payable to the consumers who are not traceable or who have ceased to be consumers in relation to that undertaking, may be utilised in the development works of the purchaser.]\n(a) Expenses or loss of profits arising out of accidents, strikes or circumstances which the management could not have prevented;\n(b) Expenses on replacement or removal of plant or works other than expenses requisite for normal maintenance or renewal;\n(c) Compensation payable under any law for the time being in force and for which no other provision is made.\nSTATE AMENDMENTS ▼\nState Amendment\nWest Bengal\n(a) after para. V (1), Sub para. (1 -A) namely:--\n\"(1-A)The licensee may, with the previous approval of the State Government, take an advance from the Contingency Reserve during the currency of the licence to meet such charges and on such terms and conditions as the State Government may determine\".\n(b) Sub-paragraph. 2, substituted the following sub-para., namely :-\n\"(2) On the purchase of the undertaking the following amounts shall be handed over to the purchaser and maintained as Contingency Reserve-\n(a) The Contingency Reserve after deduction of the amount drawn under sub-para (1): and\n(b) The amount which has not been repaid out of the taken from the Contingency Reserve under sub-paragraph (I -A), together with the interest, if any, payable on the advance:\nProvided that where the undertaking is purchased by the Board or the State Government, the amounts referred to in Cls. (a) and (b) above, shall after deduction of the amount of compensation, if any, payable to the employees of the Outgoing licensee under any law for the time being in force, be handed over to the Board or the State Government, as the case may be\".-W.B. Act, 42 of 1979, Section 3 (w.e f. 17th March, 1980).\nProvided that if in any accounting year, the clear profit [excluding the special appropriation to be made under item (va) of Cl.(c) of sub-paragraph (2) of para. XVII together with the accumulations, if any, in the Tariffs and Dividends Control Reserve less the sum calculated as aforesaid falls short of the reasonable return, the sum to be appropriated to the Development Reserve in respect of such accounting year shall be reduced by the amount of the shortfall.\n(b) Where in any particular year depreciation cannot be adjusted against revenue the same may be carried over to subsequent years.\n(c) The provisions of this paragraph shall apply to the charging of depreciation for the year in which The Electricity (Supply) Amendment Act, 1978 (23 of 1978),comes into force.]\nProvided that for the purpose of depreciation under para. VI, the total original cost of construction of the service lines shall be taken into account.\n(a) In respect of the first Rs. 1 lakhs of such net profits - 10 percent. and\n(b) In respect of all net profits in excess of Rs. 2 lakhs - 7 percent.\n(a) In respect of the first Rs. 1 lakh of operating expenditure -8 per cent.\nIn respect of the next Rs. 2 lakhs of operating expenditure - 5 per cent.\nIn respect of the next Rs. 7 lakhs of operating expenditure - 2.5 per cent.\nIn respect of all operating expenditure in excess of Rs. 10 lakhs - 1.5 per cent.\n(b) In respect of the first Rs. 1 lakh of capital expenditure incurred during the year of account - 4 per cent.\nExplanation.\nDefinitions\nDefinitions\n(1) \"Capital base\" means the sum of-\n[(a) the original cost of fixed assets available for use and necessary for the purpose of the undertaking subject to the provisions of para. XII in respect of servicelines, and the excess amount referred to in the proviso to sub-paragraph (2) of para. VII in respect of any fixed asset which has ceased to be available for use;]\n(b) The cost of intangible assets [including expenses on account of new capital issue] ;\n(c) The original cost of works in progress:\n[(d) The amount of investments compulsorily made under para. IV of this Schedule together with the amount of such investments made after the commencement of this Act from contributions towards depreciation as in the opinion of the Authority could not be utilised for the purpose of the business of electricity supply of the undertaking:]\n(e) An amount on account of working capital equal to the sum of-\n(i) One-twelfth of the sum of the book cost of stores, materials and supplies including fuel on hand at the end of each month of the year of account;\n(ii) One-twelfth of the sum of [cash and bank balances (whether credit or debit)] and call and short-term deposits at the end of each month of the year of account, not exceeding in the aggregate an amount equal to one-quarter of the expenditure under sub-para. (2)(b) of this paragraph excluding [subclauses (i), (iv) (iv-a), (iv-b) and (x)] ;----\nless-\n(i) The amount written off or set aside on account of depreciation of fixed assets and amounts written off in respect of intangible assets in the books of the undertaking before or after the commencement of this Act; [***]\n(ii) The amount of any loans advanced by the Board [***] ;\n[(ii-a) The amount of any loans borrowed from organisations or Institutions approved by the State Government:\n(ii-b) The amount of any debentures issued by the licensee :\n[(iii) The amounts deposited in cash with the licensee by consumers by way of security;]\n(iv) The amount standing to the credit of the Tariffs and Dividends Control Reserve 8 [at the beginning of the year of account];\n[(v) The amount standing to the credit of the Development Reserve at the close of the year of account;]\n(vi) The amount carried forward [at the beginning of the year of account] in the accounts of the licensee for distribution to the consumers under para. II.]\nThe difference between the amount of income and the sum of expenditure plus specific appropriations, made up in each case as follows: -\n(a) Income derived from-\n(i) Gross receipts from sale of energy, less discounts applicable thereby;\n(ii) Rental of meters and other apparatus hired to consumers;\n(iii) Sale and repair of lamps and apparatus:\n(iv) Rents, less outgoings not otherwise provided for;\n(v) Transfer fees:\n(vi) Investments fixed and call deposits and bank balances;\n(vii) Other general receipts accountable in the assessment of Indian Income-Tax and arising from and ancillary or incidental to the business of Electricity supply, -\n(b) [Expenditure properly incurred on] -\n(i) Generation and purchase of energy:\n(ii) Distribution and sale of energy;\n(iii) Rents, rates and taxes, other than all taxes on income and profits;\n(iv) Interest on loans advanced by the Board [***] ;\n[(iv-a) Interest on loans borrowed from organisations or institutions approved by the State Government;\n(iv-b) Interest on debentures issued by the licensee;\n(v) Interest on security deposits;\n(vi) Legal charges;\n(vii) Bad debts;\n(viii) Auditor's fees;\n(ix) Management including managing agent's remuneration as provided for in para. XIII;\n(x) Depreciation, computed as [hereinbefore] set out;\n(xi) Other expenses [(excluding interest on debentures and loans)] , admissible under the law for the time being in force in the assessment of Indian Income-tax and arising from and ancillary or incidental to the business of electricity supply;\n[(xii) Contributions to provident fund, staff pension and gratuity computed under any law for the time being in force or any such scheme as is approved by the State Government;\n(xii-a) Expenses on apprentice and other training schemes;]\n(a) Where any dispute regarding such bonus has been referred to any Tribunal or other authority under any law for the time being in force relating to industrial or labour disputes, in accordance with the decision of such Tribunal or authority;\n(b) In any other case, with the approval of the State Government;]\n(c) Special appropriations sufficient to cover-\n(i) Previous losses (that is to say excess of expenditure over income) which have arisen from the business of electricity supply to the extent in any year [permitted by the State Government] ;\n(ii) All taxes on income and profits;\n(iii) Instalments of written-down amounts in respect of intangible assets and new capital issue expenses to the extent in any year actually appropriated for the purpose in the books of the undertaking: provided that the amounts so appropriated shall not exceed the amount found by dividing the writtendown cost of such assets by the number of complete years remaining before the next option of purchase under the licence arises;\n(iv) Contributions to the Contingency Reserve, computed as [herein before] set out;\n(v) Contributions towards arrears of depreciation;\n[(v-a) Contributions to the Development Reserve referred to in para. V-A;]\n(v-b) Debt redemption obligation of the private licensees which may be done on a year to year basis, taking into account the requirements of debt redemption and resource generation through depreciation, retained surplus;] :\n(vi) Other special appropriations permitted by the State Government.\nUnderwriter's commission and such preliminary and promotional expenditure shown as a debit in the capital account of the undertaking, as has fairly arisen in promoting the business of electricity supply excluding any amount paid on account of goodwill.\nIn the case of a company, the amount of ordinary capital paid up and attributable to the undertaking of the licensee;\n(a) The cost of the asset to the licensee, including the cost of delivery and all charges properly incurred in erecting and bringing the asset into beneficial use;\n(c) A proper addition on account of supervision not exceeding fifteen per centum of the cost referred to in sub-paragraph (a), so however that the original cost of any asset shall not in any case exceed the original cost attributed thereto in the books of the undertaking.\nThe amount of paid-up capital attributable to the undertaking of the licensee, issued on such preferred term as are sufficient to qualify it for such description.\nIn respect of any year of account, the sum of the following : -\n(a) The amount found by applying the standard rate to the capital base at the end of that year;\n[(b) The income derived from investments other than those included in the capital base under provisions of Cl. (d) of sub-paragraph (1);]\n(c) And amount equal to one-half of one per centum on any loans advanced by the Board [***] ;\n(C-2) An amount equal to one-half of one per centum on the amounts realised by the issue of debentures;]\n[(d) An amount equal to one-half of one per centum on the accumulations in the Development Reserve created under para. V-A of this Schedule;]\n[(e) Such other amount as may be allowed by the Central Government, having regard to the prevailing tax structure in the country.]\n(a) In relation to that part of the capital base for that year of account which is equivalent to the capital base as on the 31st day of March, 1955, seven per centum per annum;\n(b) In relation to the remaining [capital base for that year, the Reserve Bank rate ruling at the beginning of that year plus-\n(i) Two per centum for investments made up to the date of the commencement of The Electricity Laws (Amendment) Act, 1991; and\n(ii) Five per centum for investments made thereafter:]\nOriginal cost less the amounts set aside or written-off on account of original in the books of the undertaking.\nTHE SEVENTH SCHEDULE\n[ Omitted by the Electricity Supply (Amendment) Act, 1978 (23 of 1978), section 24 (w.e.f. 3-6-1978). ]\nTHE EIGHTH SCHEDULE\n( See the First and Third Schedules )\nDETERMINATION OF COST OF PRODUCTION OF ELECTRICITY AT GENERATING STATIONS\n(a) sums expended for fuel, oil, water and stores consumed, for salaries and wages, and contribution by the licensee for pensions, provident fund, superannuation and insurance officers and other employees] for repairs and maintenance and for renewals not chargeable to capital account;\n(b) sums paid in respect of the station for insurance and as rents, rates and taxes [including all taxes payable on income and profits)] ;\n(c) the proportion of management and general establishment charges properly attributable to the station;\n(d) any other expenses on revenue account properly attributable to the station;\n(e) [Interest on the depreciated cost of the station shown in the books of the undertaking and properly attributable to the station (whether defrayed out of capital or revenue) and interest on working capital properly attributable to the station and the production of electricity therein] :\nProvided that for the purpose of ascertaining the principal on which interest is payable within the meaning of this clause, there shall be left out of account any part of principal on which interest is payable out of capital;\n(f) an allowance for depreciation of an amount determined in respect of the station in accordance with the provisions of paragraph VI of the Sixth Schedule.\n(i) \"depreciated cost of the station\" means original cost thereof as determined in accordance with the provisions of sub-paragraph (6) of paragraph XVII of the Sixth Schedule less the amount written off or set aside on account of depreciation on fixed assets and the amount written off in respect of intangible assets thereof in the books of the undertaking before or after the commencement of this Act;\n(ii) the rate of interest shall be,-]\n(a) on such part of the principal on which interest is payable within the meaning of the said clause as has been advanced on loan by the Board under paragraph I of the First Schedule, the actual rate charged by the Board plus one-half of one per centum per annum on the loan in the year of account;\n(b) on the balance of the said principal-\n(i) where the licensee owning the station is a local authority, the average rate payable in the year of account on the money raised by that authority for the purposes of the station;\n(ii) in any other case, [the Reserve Bank rate ruling at the beginning of that year plus two per centaur] .\nTHE NINTH SCHEDULE\n( See the First Schedule )\nALLOCATION OF COSTS OF PRODUCTION AT GENERATING STATIONS\n(a) the average load factor of a station shall be expressed as a percentage, and shall be ascertained by multiplying the number of kilowatt hours supplied from the station during the year of account by 100, and dividing the product so obtained by the product of the average monthly maximum demand multiplied by the number of hours during which the station was in commission in the year of account;\n(b) the average monthly maximum demand shall be the arithmetical average of the monthly maximum demands on the station in those calendar months during which the station was in commission in the year of account;\n(c) a station shall be deemed to be in commission when the whole or any portion of the plant in the station is generating electricity or is in readiness to generate electricity upon demand;\n(d) \"cost of fuel\" means the sums expended for fuel consumed plus the cost of any transport, handling, preparation or treatment incurred in connection with the delivery of fuel to the boiler hoppers, furnaces or engines and in connection with the disposal of the products or residues of combustion, plus the proportion of salaries and wages and any contributions made by the owner of the station for pensions, provident fund, superannuation and insurance of officers and servants properly attributable to such delivery or disposal, less any sums received from the sale of any products or residues of combustion;\n(e) \"cost of oil, water and stores\" means the sums expended for oil, water and stores consumed;\n(f) \"cost of repairs, maintenance and renewals\" means the sums expended for repairs and maintenance and for renewals not chargeable to capital account, together with the proportion of salaries and wages and any contributions made by the owner of the station for pensions, provident hind, superannuation and insurance of [officers and other employees] properly attributable to repairs, maintenance and renewals;\n(g) \"salaries and wages\" means the sums expended for salaries and wages and any contributions made by the owner of the station for pensions, provident fund, superannuation and insurance of officers and servants, less the proportion of such sums properly attributable to the cost of fuel under clause (d) and to the cost of repairs, maintenance and renewals under clause (f).\n(a) of the costs, charges and allowances set out in clause (a) of paragraph I of the said Schedule, portions calculated from the appropriate formulae set out in paragraph III;\n(b) the whole of the costs, charges and allowances set out in the remaining clauses of paragraph I of the said Schedule.\n(a) cost of fuel ... 100 100+12.8\nL (b) cost of oil, water and stores ... 100 100+9.66\nL (c) salaries and wages ... 100 100+0.38\nL (d) cost of repairs, maintenance and renewals ... 100 100+0.0001\nN L\n...\n100\n100+12.8\nL\n...\n100\n100+9.66\nL\n...\n100\n100+0.38\nL\n...\n100\n100+0.0001\nN L",
"footnote": "",
"is_definition": false,
"sort_order": 75
},
"prev_section": "82",
"next_section": null
}