← Back to Directory

The Delhi Metro Railway General Rules, 2002

The Delhi Metro Railway General Rules, 2002

Raw JSON API

Sections

1. Short title and commencement.

Section 1

2. Definitions.

Section 2

3. Supply of copies of rules.

Section 3

4. Upkeep of the copy of the rules.

Section 4

5. Knowledge of rules.

Section 5

6. Assistance in observance of rules.

Section 6

7. Obedience to rules and orders.

Section 7

8. Prevention of trespass, damage or loss.

Section 8

9. Attendance for duty.

Section 9

10. Absence from duty.

Section 10

11. Taking alcoholic drink, sedative, narcotic, stimulant drug or preparation.

Section 11

12. Conduct of metro railway employees.

Section 12

13. Duty for ensuring safety.

Section 13

14. Standard time.

Section 14

15. General.

Section 15

16. Description of signals.

Section 16

17. Provisions of signals.

Section 17

18. Working of signals and points.

Section 18

19. Control of signalling.

Section 19

20. Train detained on line.

Section 20

21. Absence of cab signalling.

Section 21

22. Failure of fixed signals.

Section 22

23. Failure of route setting.

Section 23

24. General.

Section 24

25. Service regularity.

Section 25

26. Speed of trains.

Section 26

27. Caution Order.

Section 27

28. Train staffing.

Section 28

29. Train defects.

Section 29

30. Examination of trains.

Section 30

31. Duties of a Train Operator.

Section 31

32. Locomotives, works trains and maintenance vehicles.

Section 32

33. Responsibilities of Station Controller.

Section 33

34. Responsibilities of Platform Supervisor.

Section 34

35. Responsibility of booking office staff.

Section 35

36. Security.

Section 36

37. Station Working Orders.

Section 37

38. Prevention of overcrowding.

Section 38

39. Emergency evacuation.

Section 39

40. Supervision of train movements.

Section 40

41. Class of station.

Section 41

42. Report of the accident and unusual occurrences.

Section 42

43. Duties of the station staff.

Section 43

44. Train stopped between stations.

Section 44

45. Train divided.

Section 45

46. Unusual occurrences.

Section 46

47. Flooding.

Section 47

48. Other unsafe conditions.

Section 48

49. Accidents.

Section 49

50. Continuous Automatic Train Control System.

Section 50

51. Automatic Train Operation Mode.

Section 51

52. Manual Cab Signal Mode or Coded Manual Mode, or Automatic Train Protection Mode.

Section 52

53. Run On Sight Mode.

Section 53

54. Restricted Manual Mode.

Section 54

55. Cut-Out Mode.

Section 55

56. Objective of single line working.

Section 56

57. Implementation.

Section 57

58. Signalling failures.

Section 58

59. General.

Section 59

60. Track work in non-traffic hours.

Section 60

61. Track works which extend into traffic hours.

Section 61

62. Emergency track work in traffic hours.

Section 62

63. Engineer's Possessions.

Section 63

64. Works at stations.

Section 64

65. Switching on, and off, of traction and power supply distribution.

Section 65

66. Access.

Section 66

67. Arcing and fire.

Section 67

68. Inspection of electrical way and works.

Section 68

69. Issue of Caution Order.

Section 69

70. Protection of trains in case of overhead equipment failure or breakdown.

Section 70

71. Permit-to-work on electrical equipment.

Section 71

72. Work on service buildings and structures in the vicinity of live equipment.

Section 72

73. Warning to staff and public.

Section 73

74. Alterations to track.

Section 74

75. Tripping of circuit breakers of electrical Multiple Units/Other Self-Propelled vehicles in neutral sections.

Section 75

76. Tower Wagon or Inspection Car.

Section 76

77. Working of ladder trollies.

Section 77

78. Additional rules for electrified sections.

Section 78

79. Sectioning and Siding Switches.

Section 79

80. Procedure for preventing admission of electric rolling stock into or over sections of tract with dead or earthed overhead lines.

Section 80