37. General.

(ii) In cases, where the charges on account of violation of the provision(s) of Tariff Schedule are withdrawn ab initio, the inspection fee deposited by the consumer shall be refunded through subsequent electricity bills.
(iii) The levy of charges on account of violation of the provision(s) of Tariff Schedule shall continue till the cause of levy is removed and verified by the licensee as per procedure laid down above.
(iv) In case, a consumer has applied for a separate new connection so as to remove the cause of levy of tariff violation charges on the existing connection, these charges be withdrawn from the billing cycle falling after a period of 14 days, (Normal time required for installation of new connection) from the date the consumer completes the requisite commercial formalities for the grant of separate connection and there is no lapse on his part. This is subject to condition that installation of such new connection shall remove the cause of levy.