Section 35 • The Dedicated Freight Corridor Railway General Rules, 2018
35. Placing of more than one signal on the same post.
the-dedicated-freight-corridor-railway-general-rules-2018-sec-35.json
•
Section 35
{
"act_title": "The Dedicated Freight Corridor Railway General Rules, 2018",
"act_slug": "the-dedicated-freight-corridor-railway-general-rules-2018",
"section_label": "Section",
"section": {
"number": "35",
"title": "35. Placing of more than one signal on the same post.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 39
},
"prev_section": "34",
"next_section": "36"
}