(b) on occurrence of any such incidence section controller or traction power controller from Dedicated Freight Corridor Corporation shall immediately intimate concerned section controller of Indian Railway as well;
(c) on receipt of advice from the traction power controller, the Section Controller shall under exchange of private number, advise the Station Masters of all stations, who are concerned with working of trains in the affected section to treat the dead section as if the same is under emergency power block and to ensure that no train is allowed to enter into the section.
Section 269 • The Dedicated Freight Corridor Railway General Rules, 2018
269. Rules regarding shutdown of overhead equipment.
the-dedicated-freight-corridor-railway-general-rules-2018-sec-269.json
•
Section 269
{
"act_title": "The Dedicated Freight Corridor Railway General Rules, 2018",
"act_slug": "the-dedicated-freight-corridor-railway-general-rules-2018",
"section_label": "Section",
"section": {
"number": "269",
"title": "269. Rules regarding shutdown of overhead equipment.",
"chapter": null,
"content": "(b) on occurrence of any such incidence section controller or traction power controller from Dedicated Freight Corridor Corporation shall immediately intimate concerned section controller of Indian Railway as well;\n(c) on receipt of advice from the traction power controller, the Section Controller shall under exchange of private number, advise the Station Masters of all stations, who are concerned with working of trains in the affected section to treat the dead section as if the same is under emergency power block and to ensure that no train is allowed to enter into the section.",
"footnote": "",
"is_definition": false,
"sort_order": 270
},
"prev_section": "268",
"next_section": "270"
}