(a) the first machine will move on a proper authority and the others on the authority of the machine following issued to each of the operators;
(b) as a token of acknowledgement of moving in convoy, the machine operator will endorse on the permit that they are aware of number of machines in front and rear, as the case may be;
(c) caution order will be given to all the five operators in which number of machines following shall also be mentioned;
(d) machine operator will ensure that a minimum distance of one hundred twenty meters is kept between the successive machines;
(e) gateman at level crossings will be specifically advised as to the number of machines in the convoy so as not to open the gate till whole of the convoy has passed;
(f) when moving in convoy, the speed shall be restricted to forty kilometre per hour; and
(g) the permit shall be deposited with the station master at the station in advance who shall close the line only when last of the permit has been received.
(b) in case of working of track machine in station section the lines for which block is taken, shall be treated as deemed `obstructions' for the purpose of taking 'OFF' signals or train working or shunting. The affected line shall be protected by setting the points against such line and stop plugs placed over the relevant point switches or buttons. Buzzer where provided shall also be switched 'on';
(c) In case of working of track machine in block section,-
(i) the machine shall be dispatched from the station after blocking back or blocking forward the block section along with necessary authority for shunting or obstruction as in the rule 103 and the requisite caution order is given;
(ii) if the work necessitates stopping of trains on any of the adjacent line, block for the same shall be asked for by the supervisor and the affected section shall also be blocked back or blocked forward by the station master despatching the train;
(iii) if the nature of work is such that train movement need not be stopped on the adjoining line but infringement is apprehended during operation of the machine, the supervisor shall arrange to show signals in accordance with the rule 242 and loco pilot of trains proceeding into the section shall be issued caution order by station master at either end of the section.
(d) when neither the block has been taken nor signal to warn the loco pilots as in sub-clause (iii) of clause (c) of sub-rule (5) of the rule 200 have been ensured on the adjoining line, the supervisor in charge shall see that during operation of the machine adjacent lines are kept clear.
(e) after the work is completed, the supervisor incharge shall issue a memo to the station master on duty to the effect that the work is over and other lines blocked and/or fouled are clear of obstructions and are safe for the passage of trains.
(b) on getting the information from the Supervisor in-charge of the machine, the station master on duty shall arrange for reception of the machine;
(c) the Supervisor on arrival of the train at the station shall confirm to the station master in writing against the relevant entries in train signal register that the section has been cleared of the obstruction after completion of work and all the machine or machines have arrived; and
(d) normal working of trains on the line for which block was taken, shall commence only after obtaining assurance from the Supervisor as in clause (c) of this sub-rule (7) of the rule 200.
Section 200 • The Dedicated Freight Corridor Railway General Rules, 2018
200. Working of Track Maintenance Machine.
the-dedicated-freight-corridor-railway-general-rules-2018-sec-200.json
•
Section 200
{
"act_title": "The Dedicated Freight Corridor Railway General Rules, 2018",
"act_slug": "the-dedicated-freight-corridor-railway-general-rules-2018",
"section_label": "Section",
"section": {
"number": "200",
"title": "200. Working of Track Maintenance Machine.",
"chapter": null,
"content": "(a) the first machine will move on a proper authority and the others on the authority of the machine following issued to each of the operators;\n(b) as a token of acknowledgement of moving in convoy, the machine operator will endorse on the permit that they are aware of number of machines in front and rear, as the case may be;\n(c) caution order will be given to all the five operators in which number of machines following shall also be mentioned;\n(d) machine operator will ensure that a minimum distance of one hundred twenty meters is kept between the successive machines;\n(e) gateman at level crossings will be specifically advised as to the number of machines in the convoy so as not to open the gate till whole of the convoy has passed;\n(f) when moving in convoy, the speed shall be restricted to forty kilometre per hour; and\n(g) the permit shall be deposited with the station master at the station in advance who shall close the line only when last of the permit has been received.\n(b) in case of working of track machine in station section the lines for which block is taken, shall be treated as deemed `obstructions' for the purpose of taking 'OFF' signals or train working or shunting. The affected line shall be protected by setting the points against such line and stop plugs placed over the relevant point switches or buttons. Buzzer where provided shall also be switched 'on';\n(c) In case of working of track machine in block section,-\n(i) the machine shall be dispatched from the station after blocking back or blocking forward the block section along with necessary authority for shunting or obstruction as in the rule 103 and the requisite caution order is given;\n(ii) if the work necessitates stopping of trains on any of the adjacent line, block for the same shall be asked for by the supervisor and the affected section shall also be blocked back or blocked forward by the station master despatching the train;\n(iii) if the nature of work is such that train movement need not be stopped on the adjoining line but infringement is apprehended during operation of the machine, the supervisor shall arrange to show signals in accordance with the rule 242 and loco pilot of trains proceeding into the section shall be issued caution order by station master at either end of the section.\n(d) when neither the block has been taken nor signal to warn the loco pilots as in sub-clause (iii) of clause (c) of sub-rule (5) of the rule 200 have been ensured on the adjoining line, the supervisor in charge shall see that during operation of the machine adjacent lines are kept clear.\n(e) after the work is completed, the supervisor incharge shall issue a memo to the station master on duty to the effect that the work is over and other lines blocked and/or fouled are clear of obstructions and are safe for the passage of trains.\n(b) on getting the information from the Supervisor in-charge of the machine, the station master on duty shall arrange for reception of the machine;\n(c) the Supervisor on arrival of the train at the station shall confirm to the station master in writing against the relevant entries in train signal register that the section has been cleared of the obstruction after completion of work and all the machine or machines have arrived; and\n(d) normal working of trains on the line for which block was taken, shall commence only after obtaining assurance from the Supervisor as in clause (c) of this sub-rule (7) of the rule 200.",
"footnote": "",
"is_definition": false,
"sort_order": 201
},
"prev_section": "199",
"next_section": "201"
}