(a) before putting a locomotive in motion;
(b) when entering a tunnel;
(c) when approaching a manned or unmanned level crossing; and
(d) at such other times and places as may be prescribed by special instructions.
S.No.
S.No.
Whistle Code
Whistle Code
Indication
Indication
1
____ (long)
(a) Before starting,-
(a) Before starting,-
I. indication to loco
pilot of assisting or banking locomotive and acknowledgement by
the loco pilot of assisting or banking locomotive to leading
locomotive that the loco pilot of leading locomotive is ready to
start;
II. indication to
loco pilot of assisting or banking locomotive and acknowledgement
by the loco pilot of assisting or banking locomotive to leading
locomotive that the loco pilot of leading locomotive is ready to
start;
III. locomotive ready
to leave or go to loco yard;
IV. pressure
recreated on ghat section, remove sprags and also release brakes;
and
V. before starting a train from station or
mid-section.
(b) On run,-
(b) On run,-
(i) indication to
loco pilot of assisting or banking locomotive and acknowledgement
by the loco pilot of assisting or banking locomotive to leading
locomotive that the loco pilot of leading locomotive is that
assistance is not required;
(ii) passing stop
signal at `ON' on proper authority;
(iii) passing an
automatic stop signal;
(iv) passing an
intermediate block signal at `ON' when the loco pilot is unable
to contact the station in rear; and
(v) lower or raise pantograph to be acknowledged
by loco pilot of assisting locomotive.
2
____________ (Continuous long)
(a) Before starting,-
(a) Before starting,-
(i) recall railway servant protecting train in
rear;
(ii) material train ready to leave; and
(iii) main line cleared after backing into
siding.
(b) On run,-
(b) On run,-
(i) approaching level crossing or tunnel or area
of restricted visibility or curves or cutting or site of
accident;
(ii) running through a station;
(iii) approaching a stop signal at `ON';
(iv) detained at a stop signal;
(v) in consequence of bad weather impairing
visibility or any other reason the view of signals is obstructed;
(vi) apprehension of danger;
(vii) danger signal to the loco pilot of an
approaching train whose path is fouled or obstructed for any
reason;
(viii) while working on a single line section
when single line working is introduced on a double line section;
and
(ix) moving in wrong direction on a double line
or against the signalled direction in the automatic block
signalling territory or against the established direction in the
automatic block signalling territory on single line.
3
O O_____ (Two short one long)
insufficient air pressure in locomotive,-
4
OOO (Three short)
(a) train is out of control, guard to assist, if
present; and
(b) train cannot proceed ahead on account of
accident or failure or obstruction or any other exceptional
cause.
5
__ O __(One long, one short one long)
(a) train entered block section with wrong
`authority to proceed;
(b) train parting;
(c) train arriving incomplete;
(d) fouling mark not cleared; and
(e) signal defective.
G - Duties of Staff on Arrival
Section 192 • The Dedicated Freight Corridor Railway General Rules, 2018
192. Sounding of locomotive whistle.
the-dedicated-freight-corridor-railway-general-rules-2018-sec-192.json
•
Section 192
{
"act_title": "The Dedicated Freight Corridor Railway General Rules, 2018",
"act_slug": "the-dedicated-freight-corridor-railway-general-rules-2018",
"section_label": "Section",
"section": {
"number": "192",
"title": "192. Sounding of locomotive whistle.",
"chapter": null,
"content": "(a) before putting a locomotive in motion;\n(b) when entering a tunnel;\n(c) when approaching a manned or unmanned level crossing; and\n(d) at such other times and places as may be prescribed by special instructions.\nS.No.\nS.No.\nWhistle Code\nWhistle Code\nIndication\nIndication\n1\n____ (long)\n(a) Before starting,-\n(a) Before starting,-\nI. indication to loco\n\t\t\t\tpilot of assisting or banking locomotive and acknowledgement by\n\t\t\t\tthe loco pilot of assisting or banking locomotive to leading\n\t\t\t\tlocomotive that the loco pilot of leading locomotive is ready to\n\t\t\t\tstart;\nII. indication to\n\t\t\t\tloco pilot of assisting or banking locomotive and acknowledgement\n\t\t\t\tby the loco pilot of assisting or banking locomotive to leading\n\t\t\t\tlocomotive that the loco pilot of leading locomotive is ready to\n\t\t\t\tstart;\nIII. locomotive ready\n\t\t\t\tto leave or go to loco yard;\nIV. pressure\n\t\t\t\trecreated on ghat section, remove sprags and also release brakes;\n\t\t\t\tand\nV. before starting a train from station or\n\t\t\t\tmid-section.\n(b) On run,-\n(b) On run,-\n(i) indication to\n\t\t\t\tloco pilot of assisting or banking locomotive and acknowledgement\n\t\t\t\tby the loco pilot of assisting or banking locomotive to leading\n\t\t\t\tlocomotive that the loco pilot of leading locomotive is that\n\t\t\t\tassistance is not required;\n(ii) passing stop\n\t\t\t\tsignal at `ON' on proper authority;\n(iii) passing an\n\t\t\t\tautomatic stop signal;\n(iv) passing an\n\t\t\t\tintermediate block signal at `ON' when the loco pilot is unable\n\t\t\t\tto contact the station in rear; and\n(v) lower or raise pantograph to be acknowledged\n\t\t\t\tby loco pilot of assisting locomotive.\n2\n____________ (Continuous long)\n(a) Before starting,-\n(a) Before starting,-\n(i) recall railway servant protecting train in\n\t\t\t\trear;\n(ii) material train ready to leave; and\n(iii) main line cleared after backing into\n\t\t\t\tsiding.\n(b) On run,-\n(b) On run,-\n(i) approaching level crossing or tunnel or area\n\t\t\t\tof restricted visibility or curves or cutting or site of\n\t\t\t\taccident;\n(ii) running through a station;\n(iii) approaching a stop signal at `ON';\n(iv) detained at a stop signal;\n(v) in consequence of bad weather impairing\n\t\t\t\tvisibility or any other reason the view of signals is obstructed;\n(vi) apprehension of danger;\n(vii) danger signal to the loco pilot of an\n\t\t\t\tapproaching train whose path is fouled or obstructed for any\n\t\t\t\treason;\n(viii) while working on a single line section\n\t\t\t\twhen single line working is introduced on a double line section;\n\t\t\t\tand\n(ix) moving in wrong direction on a double line\n\t\t\t\tor against the signalled direction in the automatic block\n\t\t\t\tsignalling territory or against the established direction in the\n\t\t\t\tautomatic block signalling territory on single line.\n3\nO O_____ (Two short one long)\ninsufficient air pressure in locomotive,-\n4\nOOO (Three short)\n(a) train is out of control, guard to assist, if\n\t\t\t\tpresent; and\n(b) train cannot proceed ahead on account of\n\t\t\t\taccident or failure or obstruction or any other exceptional\n\t\t\t\tcause.\n5\n__ O __(One long, one short one long)\n(a) train entered block section with wrong\n\t\t\t\t`authority to proceed;\n(b) train parting;\n(c) train arriving incomplete;\n(d) fouling mark not cleared; and\n(e) signal defective.\nG - Duties of Staff on Arrival",
"footnote": "",
"is_definition": false,
"sort_order": 193
},
"prev_section": "191",
"next_section": "193"
}