Section 122 • The Dedicated Freight Corridor Railway General Rules, 2018
122. Procedure to pass Semi-Automatic Stop signal at 'ON'.
the-dedicated-freight-corridor-railway-general-rules-2018-sec-122.json
•
Section 122
{
"act_title": "The Dedicated Freight Corridor Railway General Rules, 2018",
"act_slug": "the-dedicated-freight-corridor-railway-general-rules-2018",
"section_label": "Section",
"section": {
"number": "122",
"title": "122. Procedure to pass Semi-Automatic Stop signal at 'ON'.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 124
},
"prev_section": "121",
"next_section": "123"
}