The average monthly output in tonnes
No. of Surveyors
For below ground mines
8,000 tonnes and below Above 8,000 tonnes
One One for every additional 15,000 tonnes or part thereof
For opencast mines
The average monthly material handled in cum
No. of Surveyors
50,000 cum upto 9.00 lakhs cum
One for every 3.0 lakhs cum
Above 9.0 lakhs cum
One every 5.00 lakhs Cum
(b) Notwithstanding anything contained in this regulation, the Regional Inspector may, by an order in writing and subject to such conditions as he may specify therein, permit or require the appointment of surveyors in variation of these provisions depending upon the conditions prevailing in the mines.
Section 37 • The Coal Mines Regulations, 2011
37. Appointment of Surveyor.
the-coal-mines-regulations-2011-sec-37.json
•
Section 37
{
"act_title": "The Coal Mines Regulations, 2011",
"act_slug": "the-coal-mines-regulations-2011",
"section_label": "Section",
"section": {
"number": "37",
"title": "37. Appointment of Surveyor.",
"chapter": null,
"content": "The average monthly output in tonnes\nNo. of Surveyors\nFor below ground mines\n8,000 tonnes and below Above 8,000 tonnes\nOne One for every additional 15,000 tonnes or part thereof\nFor opencast mines\nThe average monthly material handled in cum\nNo. of Surveyors\n50,000 cum upto 9.00 lakhs cum\nOne for every 3.0 lakhs cum\nAbove 9.0 lakhs cum\nOne every 5.00 lakhs Cum\n(b) Notwithstanding anything contained in this regulation, the Regional Inspector may, by an order in writing and subject to such conditions as he may specify therein, permit or require the appointment of surveyors in variation of these provisions depending upon the conditions prevailing in the mines.",
"footnote": "",
"is_definition": false,
"sort_order": 36
},
"prev_section": "36",
"next_section": "38"
}