(a) the design of the road or bridge projects shall be carried out as per the relevant Central Government codes and guidelines;
(b) for quality Control of the works, authorised procedures prescribed by The Central Government shall be followed;
(c) project monitoring shall be done at regular interval in a methodical manner to avoid time and cost over run.
Section 10 • The Central Road Fund (State Roads) Rules, 2007
10. Execution of works
the-central-road-fund-state-roads-rules-2007-sec-10.json
•
Section 10
{
"act_title": "The Central Road Fund (State Roads) Rules, 2007",
"act_slug": "the-central-road-fund-state-roads-rules-2007",
"section_label": "Section",
"section": {
"number": "10",
"title": "10. Execution of works",
"chapter": null,
"content": "(a) the design of the road or bridge projects shall be carried out as per the relevant Central Government codes and guidelines;\n(b) for quality Control of the works, authorised procedures prescribed by The Central Government shall be followed;\n(c) project monitoring shall be done at regular interval in a methodical manner to avoid time and cost over run.",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
"prev_section": "9",
"next_section": "11"
}