4. The above information of the foreseen capabilities of the ISGS and the corresponding MW and MWh entitlements of each State, shall be compiled by the RLDC every day for the next day, and advised to all beneficiaries by 10 AM. The SLDCs shall review it vis-a-vis their foreseen load pattern and their own generating capability including bilateral exchanges, if any, and advise the RLDC by 3 PM their drawal schedule for each of the ISGS in which they have Shares, long-term and medium-term bilateral

5. [Schedule of Day-Ahed Collective transection] . - NLDC shall indicate to Power Exchange(s), the list of interfaces/control areas/regional transmission systems on which unconstrained flows are required to be advised by the Power Exchange(s) to the NLDC. Power Exchange(s) shall furnish the interchange on various interfaces/control areas/regional transmission systems as intimated by NLDC. Power Exchange(s) shall also furnish the information of total drawal and injection in each of the regions. Based on the information furnished by the Power Exchanges, NLDC shall check for congestion. In case of congestion, NLDC shall inform the Exchanges about the period of congestion and the available limit for scheduling of collective transaction on respective interface/control area/transmission systems during the period of congestion for Scheduling of Collective Transaction through the respective Power Exchange. The limit for scheduling of collective transaction for respective Power Exchange shall be worked out in accordance with CERC directives. Based on the application for scheduling of Collective Transaction submitted by the Power Exchange(s), NLDC shall send the detads (Scheduling Request of Collective Transaction) to different RLDCs for final checking and incorporating them in their schedules. After getting confirmation from RLDCs, NLDC shall convey the acceptance of scheduling of collective transaction to Power Exchange(s). RLDCs shall schedule the Collective Transaction at the respective periphery of the Regional Entities.
[(aa) Scheduling of Real-time collective transaction: NLDC shall indicate to Power Exchange(s), margin available in each of the transmission corridors before the gate closure, i.e. before the window for trade closes for a specified duration. Power Exchange(s) shall clear the buy and sell bids for the said duration under consideration on various interfaces or control areas or regional transmission systems as intimated by NLDC. The limit for scheduling of collective transaction during real time for respective Power Exchanges shall be worked out in accordance with the directives of the Commission. NLDC shall furnish the available transmission corridors to the Power Exchange(s) before the trading for real time market for a specified duration closes. Based on the information furnished by NLDC, Power Exchange shall clear the RTM bids and announce the Market Clearing price and volume. Based on the volume cleared by the Power Exchanges, NLDC shall communicate the schedules to the respective RLDCs. After getting confirmation from RLDCs, NLDC shall convey the acceptance of scheduling of collective transaction to Power Exchange(s). RLDCs shall schedule the Collective Transactions at the respective periphery of the Regional Entities.]
(b) The individual transactions for State Utilities/intra-State Entities shall be scheduled by the respective SLDCs. Power Exchange(s) shall send the detailed break up of each point of injection and each point of drawal within the State to respective SLDCs after receipt of acceptance from NLDC. Power Exchange(s) shall ensure necessary coordination with SLDCs for scheduling of the transactions.
(c) Timeline for above activities will be as per detailed procedure for Scheduling of Collective Transaction issued in accordance with CERC(Open access in inter-state transmission) Regulations,2008 and as amended from time to time.