LLM Advocates Logo
LLM Advocates
HOME
CATEGORIES ▼
Criminal Law & Security Civil Law, Property & Contracts Constitutional, Administrative & Welfare Laws Intellectual Property Rights (IPR) Technology, Cyber & Media Laws Corporate, Commercial & Economic Laws Labour & Employment Law Taxation & Finance Laws Environmental & Wildlife Laws Family & Personal Laws Transport, Infrastructure & Energy Health, Medicine & Food
A-Z INDEX
HOME A-Z INDEX

CATEGORIES

Criminal Law & Security Civil Law, Property & Contracts Constitutional, Administrative & Welfare Laws Intellectual Property Rights (IPR) Technology, Cyber & Media Laws Corporate, Commercial & Economic Laws Labour & Employment Law Taxation & Finance Laws Environmental & Wildlife Laws Family & Personal Laws Transport, Infrastructure & Energy Health, Medicine & Food
← Back to The Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010
Section 22 • The Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010

22. The Regional Load Despatch Centre shall also formulate the procedure for meeting contingencies both in the long run and in the short run (Daily scheduling).

← Previous Section Section 21: 21. To discourage frivolous revisions, an RLDC may, at its sole discretion, refuse to accept schedule/capability changes of less than two (2) percent of previous schedule/capability. The schedule of thermal generating stations indicating fuel shortage while intimating the Declared Capacity to the RLDC shall not be revised except in case of forced outage of generating unit. Provided that in case of gas based ISGS, for optimum utilization of gas, this shall be permitted, i.e. in case of tripping o ☰ Next Section Section 23: 23. Special dispensation for scheduling of wind and solar generation. - (i) With effect from 1.1.2011 Scheduling of wind power generation plants would have to be done for the purpose of UI where the sum of generation capacity of such plants connected at the connection point to the transmission or distribution system is 10 MW and above and connection point is 33 KV and above, and where PPA has not yet been signed. For capacity and voltage level below this, as well as for old wind farms (A wind fa →
the-central-electricity-regulatory-commission-indian-electricity-grid-code-regulations-2010-sec-22.json • Section 22
API ↗
{
    "act_title": "The Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010",
    "act_slug": "the-central-electricity-regulatory-commission-indian-electricity-grid-code-regulations-2010",
    "section_label": "Section",
    "section": {
        "number": "22",
        "title": "22. The Regional Load Despatch Centre shall also formulate the procedure for meeting contingencies both in the long run and in the short run (Daily scheduling).",
        "chapter": null,
        "content": "",
        "footnote": "",
        "is_definition": false,
        "sort_order": 20
    },
    "prev_section": "21",
    "next_section": "23"
}

Ready to Discuss Your Case?

GET STARTED
© 2026 LLM Advocates. All rights reserved.
RESOURCES ABOUT BLOGS FAQ CONTACT PRIVACY POLICY TERMS