LLM Advocates Logo
LLM Advocates
HOME
CATEGORIES ▼
Criminal Law & Security Civil Law, Property & Contracts Constitutional, Administrative & Welfare Laws Intellectual Property Rights (IPR) Technology, Cyber & Media Laws Corporate, Commercial & Economic Laws Labour & Employment Law Taxation & Finance Laws Environmental & Wildlife Laws Family & Personal Laws Transport, Infrastructure & Energy Health, Medicine & Food
A-Z INDEX
HOME A-Z INDEX

CATEGORIES

Criminal Law & Security Civil Law, Property & Contracts Constitutional, Administrative & Welfare Laws Intellectual Property Rights (IPR) Technology, Cyber & Media Laws Corporate, Commercial & Economic Laws Labour & Employment Law Taxation & Finance Laws Environmental & Wildlife Laws Family & Personal Laws Transport, Infrastructure & Energy Health, Medicine & Food
← Back to The Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010
Section 20 • The Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010

20. If, at any point of time, the RLDC observes that there is need for revision of the schedules in the interest of better system operation, it may do so on its own, and in such cases, the revised schedules shall become effective from the 4th time block, counting the time block in which the revised schedule is issued by the RLDC to be the first one.

← Previous Section Section 17: 17. In case of any grid disturbance, scheduled generation of all the ISGS and scheduled drawal of all the beneficiaries shall be deemed to have been revised to be equal to their actual generation/drawal for all the time blocks affected by the grid disturbance. Certification of grid disturbance and its duration shall be done by the RLDC. ☰ Next Section Section 21: 21. To discourage frivolous revisions, an RLDC may, at its sole discretion, refuse to accept schedule/capability changes of less than two (2) percent of previous schedule/capability. The schedule of thermal generating stations indicating fuel shortage while intimating the Declared Capacity to the RLDC shall not be revised except in case of forced outage of generating unit. Provided that in case of gas based ISGS, for optimum utilization of gas, this shall be permitted, i.e. in case of tripping o →
the-central-electricity-regulatory-commission-indian-electricity-grid-code-regulations-2010-sec-20.json • Section 20
API ↗
{
    "act_title": "The Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010",
    "act_slug": "the-central-electricity-regulatory-commission-indian-electricity-grid-code-regulations-2010",
    "section_label": "Section",
    "section": {
        "number": "20",
        "title": "20. If, at any point of time, the RLDC observes that there is need for revision of the schedules in the interest of better system operation, it may do so on its own, and in such cases, the revised schedules shall become effective from the 4th time block, counting the time block in which the revised schedule is issued by the RLDC to be the first one.",
        "chapter": null,
        "content": "",
        "footnote": "",
        "is_definition": false,
        "sort_order": 18
    },
    "prev_section": "17",
    "next_section": "21"
}