(a) "Act" means the Electricity Act, 2003 as amended from time to time;
(b) "Ancillary Services" means in relation to power system (or grid) operation, the services necessary to support the power system (or grid) operation in maintaining power quality, reliability and security of the grid, eg. active power support for load following, reactive power support, black start, etc;
(c) "Automatic Voltage Regulator (AVR)" means a continuously acting automatic excitation control system to control the voltage of a Generating Unit measured at the generator terminals;
(d) "Available Transfer Capability (ATC)" means the transfer capability of the inter-control area transmission system available for scheduling commercial transactions (through long term access, medium term open access and short term open access) in a specific direction, taking into account the network security. Mathematically ATC is the Total Transfer Capability less Transmission Reliability Margin;
(e) "Beneficiary" means a person who has a share in an ISGS
(f) "Bilateral Transaction" means a transaction for exchange of energy (MWh) between a specified buyer and a specified seller, directly or through a trading licensee or discovered at Power Exchange through anonymous bidding, from a specified point of injection to a specified point of drawal for a fixed or varying quantum of power (MW) for any time period during a month;
(g) "Black Start Procedure" means the procedure necessary to recover from a partial or a total blackout in the region;
(h) "BIS" means the Bureau of Indian Standards;
(i) "Bulk Consumer" means any Consumer who avails supply at voltage of 33 kV or above;
(j) "Capacitor" means an electrical facility provided for generation of reactive power;
(k) "Central Generating Station" means the generating stations owned by the companies owned or controlled by the Central Government;
(l) "Central Transmission Utility (CTU)" means any Government company, which the Central Government may notify under sub-section (1) of Section 38 of the Act;
(m) "Collective Transaction" means a set of transactions discovered in power exchange through anonymous, simultaneous competitive bidding by buyers and sellers;
(n) "Congestion" means a situation where the demand for transmission capacity exceeds the Available Transfer Capability;
(o) "Connection Agreement" means an Agreement between CTU, inter-state transmission licensee other than CTU (if any) and any person setting out the terms relating to a connection to and/or use of the Inter State Transmission System;
(p) "Connection Point" means a point at which a Plant and/ or Apparatus connects to the Transmission /Distribution System;
(q) "Connectivity" means the state of getting connected to the inter-State transmission system by a generating station, including a captive generating plant, a bulk consumer or an inter-State transmission licensee;
(r) "Control Area" means an electrical system bounded by interconnections (tie lines), metering and telemetry which controls its generation and/or load to maintain its interchange schedule with other control areas whenever required to do so and contributes to frequency regulation of the synchronously operating system;
(s) "Demand" means the demand of Active Power in MW and Reactive Power in MVAr of electricity unless otherwise specified;
(t) "Demand response" means reduction in electricity usage by end customers from their normal consumption pattern, manually or automatically, in response to high UI charges being incurred by the State due to over drawal by the State at low frequency, or in response to congestion charges being incurred by the State for creating transmission congestion, or for alleviating a system contingency, for which such consumers could be given a financial incentive or lower tariff;
(u) "Despatch Schedule" means the ex-power plant net MW and MWh output of a generating station, scheduled to be exported to the Grid from time to time;
(v) "Disturbance Recorder (DR)" means a device provided to record the behaviour of the pre-selected digital and analog values of the system parameters during an Event;
(w) "Data Acquisition System (DAS)" means a system provided to record the sequence of operation in time, of the relays/equipments as well as the measurement of pre-selected system parameters; (x) "Drawal Schedule" means the summation of the station-wise ex-power plant drawal schedules from all ISGS and drawal from/injection to regional grid consequent to other long term access, medium term and short term open access transactions; (y) "DVC" means the Damodar Valley Corporation established under sub-section (1) of Section 3 of the Damodar Valley Corporation Act, 1948; (z) "Entitlement" means a Share of a beneficiary (in MW / MWh) in the installed capacity/output capability of an ISGS; (aa) "Event" means an unscheduled or unplanned occurrence on a Grid including faults, incidents and breakdowns; (bb) "Event Logging Facilities" means a device provided to record the chronological sequence of operations, of the relays and other equipment; (cc) "Ex-Power Plant" means net MW/MWh output of a generating station, after deducting auxiliary consumption and transformation losses; (dd) "Fault Locator (FL)" means a device provided at the end of a transmission line to measure/ indicate the distance at which a line fault may have occurred; (ee) "Flexible Alternating Current Transmission System (FACTS)" means a power electronics based system and other static equipment that provide control of one or more AC transmission system parameters to enhance controllability and increase power transfer capability; (ff) "Force Majeure" means any event which is beyond the control of the persons involved which they could not foresee or with' a reasonable amount of diligence could not have foreseen or which could not be prevented and which substantially affects the performance by person such being the following including but not limited to - (a) Acts of God, natural phenomena, floods, droughts, earthquakes and epidemics; (b) Enemy acts of any Government domestic or foreign, war declared or undeclared, hostilities, priorities, quarantines, embargoes; (c) Riot or Civil Commotion; (d) Grid's failure not attributable to the person, (gg) "Forced Outage" means an outage of a Generating Unit or a transmission facility due to a fault or other reasons which has not been planned; (hh) "Generating Company" means any company or body corporate or association or body of individuals, whether incorporated or not, or artificial juridical person, which owns or operates or maintains a generating station, (ii) "Generating Unit" means an electrical Generating Unit coupled to a turbine within a Power Station together with all Plant and Apparatus at that Power Station which relates exclusively to the operation of that turbo-generator; (jj) "Good Utility Practices" means any of the practices, methods and acts engaged in or approved by a significant portion of the electric utility industry during the relevant time period which could have been expected to accomplish the desired results at a reasonable cost consistent with good business practices, reliably, safely and with expedition; (kk) "Governor Droop" means in relation to the operation of the governor of a Generating Unit, the percentage drop in system frequency which would cause the Generating Unit under restricted/free governor action to change its output from zero to full load; (ll) "Grid Standards" means the standards specified by the Authority under clause (d) of the Section 73 of the Act; (mm) "Extra High Voltage (EHV)" means where the voltage exceeds 33,000 volts under normal conditions, subject, however, to the percentage variation allowed by the Authority; (nn) "Independent Power Producer (IPP)" means a generating company not owned/ controlled by the Central/State Government; (oo) "Indian Electricity Grid Code (IEGC) or Grid Code" means these regulations specifying the philosophy and the responsibilities for planning and operation of Indian power system; (pp) "Inter-State Generating Station (ISGS)" means a Central generating station or other generating station, in which two or more states have Shares; (qq) "Inter State Transmission System (ISTS)" means (i) Any system for the conveyance of electricity by means of a main transmission line from the territory of one State to another State (ii) The conveyance of electricity across the territory of an intervening State as well as conveyance within the State which is incidental to such inter-state transmission of energy (iii) The transmission of electricity within the territory of State on a system built, owned, operated, maintained or controlled by CTU; (rr) "Licensee" means a person who has been granted a license under Section 14 of the Act; (ss) "Load" means the MW/MWh /MVAR/MVARh consumed by a utility/ installation; (tt) "Long -term Access" means the right to use the inter-State transmission system for a period exceeding 12 years but not exceeding 25 years; (uu) "Long-term customer" means a person who has been granted long-term access and includes a person who has been allocated central sector generation that is electricity supply from a generating station owned or controlled by the Central Government; (vv) "Maximum Continuous Rating (MCR)" means the maximum continuous output in MW at the generator terminals guaranteed by the manufacturer at rated parameters; (ww) "Medium-term Open Access" means the right to use the interstate transmission system for a period exceeding 3 months but not exceeding 3 years; (xx) "Medium-term customer" means a person who has been granted medium-term open access: (yy) "National Grid" means the entire inter-connected electric power network of the country; (zz) "Net Drawal Schedule" means the drawal schedule of a Regional Entity after deducting the apportioned transmission losses (estimated); (aaa) "NLDC" means the Centre established under sub-section (1) of Section 26 of the Act; (bbb) "Operation" means a scheduled or planned action relating to the operation of a System; (ccc) "Operation Coordination Sub-Committee (OCC)" means a sub-committee of RPC with members from all the regional entities which decides the operational aspects of the Regional Grid; (ddd) "Operating range" means the operating range of frequency and voltage as specified under the operating code (Part-5); (eee) "Pool Account" means regional account for (i) payments regarding unscheduled-interchanges (UI Account) or (ii) reactive energy exchanges (Reactive Energy Account) (iii) Congestion Charge (iv) Renewable Regulatory charge, as the case may be; (fff) "Powergrid" means Power Grid Corporation of India Limited which has been notified as CTU. (ggg) "Power Exchange" means the power exchange which has been granted registration in accordance with CERC (Power Market Regulations), 2010 as amended from time to time; (hhh) "Power System" means all aspects of generation, transmission, distribution and supply of electricity and includes one or more of the following, namely: (a) generating stations; (b) transmission or main transmission lines; (c) sub-stations; (d) tie-lines; (e) load despatch activities; (f) mains or distribution mains; (g) electric supply lines; (h) overhead lines; (i) service lines; (j) works; (iii) "Protection Coordination Sub-Committee" means a sub-committee of RPC with members from all the regional entities which decide on the protection aspects of the Regional Grid; (jjj) "Reactor" means an electrical facility specifically designed to absorb Reactive Power; (kkk) "Regional Entity" means such persons who are in the RLDC control area and whose metering and energy accounting is done at the regional level; (lll) "Regional Power Committee (RPC)" means a Committee established by resolution by the Central Government for a specific region for facilitating the integrated operation of the power systems in that region; (mmm) "RPC Secretariat" means the Secretariat of the RPC. (nnn) "Regional Energy Account (REA)" means a regional energy account prepared on monthly basis by the RPC Secretariat for the billing and settlement of 'Capacity Charge', 'Energy Charge' and transmission charges; (ooo) "Regional Grid" means the entire synchronously connected electric power network of the concerned Region; (ppp) "Regional Load Despatch Centre (RLDC)" means the Centre established under sub-section (1) of Section 27 of the Act; (qqq) "Share" means percentage share of a beneficiary in an ISGS either notified by Government of India or agreed through contracts and implemented through long term access; (rrr) "Short-term Open Access" means open access for a period up to one (1) month at one time; (sss) "Spinning Reserve" means part loaded generating capacity with some reserve margin that is synchronized to the system and is ready to provide increased generation at short notice pursuant to despatch instruction or instantaneously in response to a frequency drop; (ttt) "Standing Committee for Transmission Planning" means a Committee constituted by the CEA to discuss, review and finalise the proposals for expansion or modification in the ISTS and associated intra-state systems; (uuu) "SEB" means State Electricity Board which term includes State Electricity Department; (vvv) "SERC" means State Electricity Regulatory Commission (www) "State Load Despatch Centre (SLDC)" means the Centre established under subsection (1) of Section 31 of the Act; (xxx) "State Transmission Utility (STU)" means the Board or the Government Company specified as such by the State Government under sub-section (1) of Section 39 of the Act; (yyy) "Static VAR Compensator (SVC)" means an electrical facility designed for the purpose of generating or absorbing Reactive Power; (zzz) "Technical Coordination Committee (TCC)" means the committee set up by RPC to coordinate the technical and commercial aspects of the operation of the regional grid; (aaaa) "Time Block" means block of 15 minutes each for which Special Energy Meters record values of specified electrical parameters with first time block starting at 00.00 Hrs; (bbbb) "Total Transfer Capability (TTC)" means the amount of electric power that can be transferred reliably over the inter-control area transmission system under a given set of operating conditions considering the effect of occurrence of the worst credible contingency; (cccc) "Transmission License" means a License granted under Section 14 of the Act to transmit electricity; (dddd) "Transmission Planning Criteria" means the policy, standards and guidelines issued by the CEA for the planning and design of the Transmission system; (eeee) "Transmission Reliability Margin (TRM)" means the amount of margin kept in the total transfer capability necessary to ensure that the interconnected transmission network is secure under a reasonable range of uncertainties in system conditions; (ffff) "Unscheduled Interchange (UI)" means in a time block for a generating station or a seller means its total actual generation minus its total scheduled generation and for a beneficiary or buyer means its total actual drawal minus its total scheduled drawal; (gggg) "User" means a person such as a Generating Company including Captive Generating Plant or Transmission Licensee (other than the Central Transmission Utility and State Transmission utility) or Distribution Licensee or Bulk Consumer, whose electrical plant is connected to the ISTS at a voltage level 33kV and above; (2) Words and expressions used in these regulations and not defined herein but defined in the Act shall have the meaning assigned to them under the Act. Part 1 General 1.1 Introduction - The Indian Power System is a conglomeration of a number of agencies. Power system means all aspects of generation, transmission, distribution and supply of electricity and includes one or more of the following, namely :- (a) generating stations; (b) transmission or main transmission lines; (c) sub-stations; (d) tie-lines; (e) load despatch activities; (f) mains or distribution mains; (g) electric supply-lines; (h) overhead lines; (i) service lines; (j) works; 1.2. Objective. - The IEGC brings together a single set of technical and commercial rules, encompassing all the Utilities connected to/or using the inter-State transmission system (ISTS) and provides the following: • Documentation of the principles and procedures which define the relationship between the various Users of the inter-State transmission system (ISTS), National Load Despatch Centre, as well as the Regional and State Load Despatch Centers • Facilitation of the optimal operation of the grid, facilitation of coordinated and optimal maintenance planning of generation and transmission facilities in the grid and facilitation of development and planning of economic and reliable National / Regional Grid • Facilitation for functioning of power markets and ancillary services by defining a common basis of operation of the ISTS, applicable to all the Users of the ISTS. • Facilitation of the development of renewable energy sources by specifying the technical and commercial aspects for integration of these resources into the grid. 1.3. Scope. - (i) All Users, SLDCs, RLDCs, NLDC, CEA, CTU, STUs, licensees, RPCs and Power Exchanges are required to abide by the principles and procedures defined in the IEGC in so far as they apply to that party. (ii) For the purpose of the IEGC, the Damodar Valley Corporation (DVC) will be treated similar to a SEB, in view of the fact that DVC is a vertically integrated utility like a SEB and has its own generation, transmission and distribution in the identified command area. Accordingly Central Load< Despatch at Maithon shall perform functions of SLDC envisaged in this code for the area of DVC. (iii) For the purpose of the IEGC, the generating stations of the Bhakra Beas Management Board (BBMB) and Sardar Sarovar Project (SSP) shall be treated as intra-State generating stations, though their transmission systems shall be a part of the ISTS. This is because of the fact that only some of the States of Northern Region/ Western Region have a Share in BBMB/ SSP, and their generating units have to be scheduled and despatched in a very special manner (in coordination with the irrigational requirements). The scheduling and despatch of the BBMB/ SSP generation shall continue to be the responsibility of the BBMB/ Narmada Control Authority (NCA), with a proviso that it shall be duly coordinated with the respective Regional Load Despatch Centre and the beneficiaries. (iv) Any neighbouring country inter-connected with Indian (National) Grid shall be treated as a separate control area. 1.4. Structure of the IEGC. - This IEGC contains the following:
(x) "Drawal Schedule" means the summation of the station-wise ex-power plant drawal schedules from all ISGS and drawal from/injection to regional grid consequent to other long term access, medium term and short term open access transactions; (y) "DVC" means the Damodar Valley Corporation established under sub-section (1) of Section 3 of the Damodar Valley Corporation Act, 1948; (z) "Entitlement" means a Share of a beneficiary (in MW / MWh) in the installed capacity/output capability of an ISGS; (aa) "Event" means an unscheduled or unplanned occurrence on a Grid including faults, incidents and breakdowns; (bb) "Event Logging Facilities" means a device provided to record the chronological sequence of operations, of the relays and other equipment; (cc) "Ex-Power Plant" means net MW/MWh output of a generating station, after deducting auxiliary consumption and transformation losses; (dd) "Fault Locator (FL)" means a device provided at the end of a transmission line to measure/ indicate the distance at which a line fault may have occurred; (ee) "Flexible Alternating Current Transmission System (FACTS)" means a power electronics based system and other static equipment that provide control of one or more AC transmission system parameters to enhance controllability and increase power transfer capability; (ff) "Force Majeure" means any event which is beyond the control of the persons involved which they could not foresee or with' a reasonable amount of diligence could not have foreseen or which could not be prevented and which substantially affects the performance by person such being the following including but not limited to - (a) Acts of God, natural phenomena, floods, droughts, earthquakes and epidemics; (b) Enemy acts of any Government domestic or foreign, war declared or undeclared, hostilities, priorities, quarantines, embargoes; (c) Riot or Civil Commotion; (d) Grid's failure not attributable to the person, (gg) "Forced Outage" means an outage of a Generating Unit or a transmission facility due to a fault or other reasons which has not been planned; (hh) "Generating Company" means any company or body corporate or association or body of individuals, whether incorporated or not, or artificial juridical person, which owns or operates or maintains a generating station, (ii) "Generating Unit" means an electrical Generating Unit coupled to a turbine within a Power Station together with all Plant and Apparatus at that Power Station which relates exclusively to the operation of that turbo-generator; (jj) "Good Utility Practices" means any of the practices, methods and acts engaged in or approved by a significant portion of the electric utility industry during the relevant time period which could have been expected to accomplish the desired results at a reasonable cost consistent with good business practices, reliably, safely and with expedition; (kk) "Governor Droop" means in relation to the operation of the governor of a Generating Unit, the percentage drop in system frequency which would cause the Generating Unit under restricted/free governor action to change its output from zero to full load; (ll) "Grid Standards" means the standards specified by the Authority under clause (d) of the Section 73 of the Act; (mm) "Extra High Voltage (EHV)" means where the voltage exceeds 33,000 volts under normal conditions, subject, however, to the percentage variation allowed by the Authority; (nn) "Independent Power Producer (IPP)" means a generating company not owned/ controlled by the Central/State Government; (oo) "Indian Electricity Grid Code (IEGC) or Grid Code" means these regulations specifying the philosophy and the responsibilities for planning and operation of Indian power system; (pp) "Inter-State Generating Station (ISGS)" means a Central generating station or other generating station, in which two or more states have Shares; (qq) "Inter State Transmission System (ISTS)" means (i) Any system for the conveyance of electricity by means of a main transmission line from the territory of one State to another State (ii) The conveyance of electricity across the territory of an intervening State as well as conveyance within the State which is incidental to such inter-state transmission of energy (iii) The transmission of electricity within the territory of State on a system built, owned, operated, maintained or controlled by CTU; (rr) "Licensee" means a person who has been granted a license under Section 14 of the Act; (ss) "Load" means the MW/MWh /MVAR/MVARh consumed by a utility/ installation; (tt) "Long -term Access" means the right to use the inter-State transmission system for a period exceeding 12 years but not exceeding 25 years; (uu) "Long-term customer" means a person who has been granted long-term access and includes a person who has been allocated central sector generation that is electricity supply from a generating station owned or controlled by the Central Government; (vv) "Maximum Continuous Rating (MCR)" means the maximum continuous output in MW at the generator terminals guaranteed by the manufacturer at rated parameters; (ww) "Medium-term Open Access" means the right to use the interstate transmission system for a period exceeding 3 months but not exceeding 3 years; (xx) "Medium-term customer" means a person who has been granted medium-term open access: (yy) "National Grid" means the entire inter-connected electric power network of the country; (zz) "Net Drawal Schedule" means the drawal schedule of a Regional Entity after deducting the apportioned transmission losses (estimated); (aaa) "NLDC" means the Centre established under sub-section (1) of Section 26 of the Act; (bbb) "Operation" means a scheduled or planned action relating to the operation of a System; (ccc) "Operation Coordination Sub-Committee (OCC)" means a sub-committee of RPC with members from all the regional entities which decides the operational aspects of the Regional Grid; (ddd) "Operating range" means the operating range of frequency and voltage as specified under the operating code (Part-5); (eee) "Pool Account" means regional account for (i) payments regarding unscheduled-interchanges (UI Account) or (ii) reactive energy exchanges (Reactive Energy Account) (iii) Congestion Charge (iv) Renewable Regulatory charge, as the case may be; (fff) "Powergrid" means Power Grid Corporation of India Limited which has been notified as CTU. (ggg) "Power Exchange" means the power exchange which has been granted registration in accordance with CERC (Power Market Regulations), 2010 as amended from time to time; (hhh) "Power System" means all aspects of generation, transmission, distribution and supply of electricity and includes one or more of the following, namely: (a) generating stations; (b) transmission or main transmission lines; (c) sub-stations; (d) tie-lines; (e) load despatch activities; (f) mains or distribution mains; (g) electric supply lines; (h) overhead lines; (i) service lines; (j) works; (iii) "Protection Coordination Sub-Committee" means a sub-committee of RPC with members from all the regional entities which decide on the protection aspects of the Regional Grid; (jjj) "Reactor" means an electrical facility specifically designed to absorb Reactive Power; (kkk) "Regional Entity" means such persons who are in the RLDC control area and whose metering and energy accounting is done at the regional level; (lll) "Regional Power Committee (RPC)" means a Committee established by resolution by the Central Government for a specific region for facilitating the integrated operation of the power systems in that region; (mmm) "RPC Secretariat" means the Secretariat of the RPC. (nnn) "Regional Energy Account (REA)" means a regional energy account prepared on monthly basis by the RPC Secretariat for the billing and settlement of 'Capacity Charge', 'Energy Charge' and transmission charges; (ooo) "Regional Grid" means the entire synchronously connected electric power network of the concerned Region; (ppp) "Regional Load Despatch Centre (RLDC)" means the Centre established under sub-section (1) of Section 27 of the Act; (qqq) "Share" means percentage share of a beneficiary in an ISGS either notified by Government of India or agreed through contracts and implemented through long term access; (rrr) "Short-term Open Access" means open access for a period up to one (1) month at one time; (sss) "Spinning Reserve" means part loaded generating capacity with some reserve margin that is synchronized to the system and is ready to provide increased generation at short notice pursuant to despatch instruction or instantaneously in response to a frequency drop; (ttt) "Standing Committee for Transmission Planning" means a Committee constituted by the CEA to discuss, review and finalise the proposals for expansion or modification in the ISTS and associated intra-state systems; (uuu) "SEB" means State Electricity Board which term includes State Electricity Department; (vvv) "SERC" means State Electricity Regulatory Commission (www) "State Load Despatch Centre (SLDC)" means the Centre established under subsection (1) of Section 31 of the Act; (xxx) "State Transmission Utility (STU)" means the Board or the Government Company specified as such by the State Government under sub-section (1) of Section 39 of the Act; (yyy) "Static VAR Compensator (SVC)" means an electrical facility designed for the purpose of generating or absorbing Reactive Power; (zzz) "Technical Coordination Committee (TCC)" means the committee set up by RPC to coordinate the technical and commercial aspects of the operation of the regional grid; (aaaa) "Time Block" means block of 15 minutes each for which Special Energy Meters record values of specified electrical parameters with first time block starting at 00.00 Hrs; (bbbb) "Total Transfer Capability (TTC)" means the amount of electric power that can be transferred reliably over the inter-control area transmission system under a given set of operating conditions considering the effect of occurrence of the worst credible contingency; (cccc) "Transmission License" means a License granted under Section 14 of the Act to transmit electricity; (dddd) "Transmission Planning Criteria" means the policy, standards and guidelines issued by the CEA for the planning and design of the Transmission system; (eeee) "Transmission Reliability Margin (TRM)" means the amount of margin kept in the total transfer capability necessary to ensure that the interconnected transmission network is secure under a reasonable range of uncertainties in system conditions; (ffff) "Unscheduled Interchange (UI)" means in a time block for a generating station or a seller means its total actual generation minus its total scheduled generation and for a beneficiary or buyer means its total actual drawal minus its total scheduled drawal; (gggg) "User" means a person such as a Generating Company including Captive Generating Plant or Transmission Licensee (other than the Central Transmission Utility and State Transmission utility) or Distribution Licensee or Bulk Consumer, whose electrical plant is connected to the ISTS at a voltage level 33kV and above; (2) Words and expressions used in these regulations and not defined herein but defined in the Act shall have the meaning assigned to them under the Act. Part 1 General 1.1 Introduction - The Indian Power System is a conglomeration of a number of agencies. Power system means all aspects of generation, transmission, distribution and supply of electricity and includes one or more of the following, namely :- (a) generating stations; (b) transmission or main transmission lines; (c) sub-stations; (d) tie-lines; (e) load despatch activities; (f) mains or distribution mains; (g) electric supply-lines; (h) overhead lines; (i) service lines; (j) works; 1.2. Objective. - The IEGC brings together a single set of technical and commercial rules, encompassing all the Utilities connected to/or using the inter-State transmission system (ISTS) and provides the following: • Documentation of the principles and procedures which define the relationship between the various Users of the inter-State transmission system (ISTS), National Load Despatch Centre, as well as the Regional and State Load Despatch Centers • Facilitation of the optimal operation of the grid, facilitation of coordinated and optimal maintenance planning of generation and transmission facilities in the grid and facilitation of development and planning of economic and reliable National / Regional Grid • Facilitation for functioning of power markets and ancillary services by defining a common basis of operation of the ISTS, applicable to all the Users of the ISTS. • Facilitation of the development of renewable energy sources by specifying the technical and commercial aspects for integration of these resources into the grid. 1.3. Scope. - (i) All Users, SLDCs, RLDCs, NLDC, CEA, CTU, STUs, licensees, RPCs and Power Exchanges are required to abide by the principles and procedures defined in the IEGC in so far as they apply to that party.
(y) "DVC" means the Damodar Valley Corporation established under sub-section (1) of Section 3 of the Damodar Valley Corporation Act, 1948;
(z) "Entitlement" means a Share of a beneficiary (in MW / MWh) in the installed capacity/output capability of an ISGS;
(aa) "Event" means an unscheduled or unplanned occurrence on a Grid including faults, incidents and breakdowns;
(bb) "Event Logging Facilities" means a device provided to record the chronological sequence of operations, of the relays and other equipment;
(cc) "Ex-Power Plant" means net MW/MWh output of a generating station, after deducting auxiliary consumption and transformation losses;
(dd) "Fault Locator (FL)" means a device provided at the end of a transmission line to measure/ indicate the distance at which a line fault may have occurred; (ee) "Flexible Alternating Current Transmission System (FACTS)" means a power electronics based system and other static equipment that provide control of one or more AC transmission system parameters to enhance controllability and increase power transfer capability; (ff) "Force Majeure" means any event which is beyond the control of the persons involved which they could not foresee or with' a reasonable amount of diligence could not have foreseen or which could not be prevented and which substantially affects the performance by person such being the following including but not limited to - (a) Acts of God, natural phenomena, floods, droughts, earthquakes and epidemics; (b) Enemy acts of any Government domestic or foreign, war declared or undeclared, hostilities, priorities, quarantines, embargoes; (c) Riot or Civil Commotion; (d) Grid's failure not attributable to the person, (gg) "Forced Outage" means an outage of a Generating Unit or a transmission facility due to a fault or other reasons which has not been planned; (hh) "Generating Company" means any company or body corporate or association or body of individuals, whether incorporated or not, or artificial juridical person, which owns or operates or maintains a generating station, (ii) "Generating Unit" means an electrical Generating Unit coupled to a turbine within a Power Station together with all Plant and Apparatus at that Power Station which relates exclusively to the operation of that turbo-generator; (jj) "Good Utility Practices" means any of the practices, methods and acts engaged in or approved by a significant portion of the electric utility industry during the relevant time period which could have been expected to accomplish the desired results at a reasonable cost consistent with good business practices, reliably, safely and with expedition; (kk) "Governor Droop" means in relation to the operation of the governor of a Generating Unit, the percentage drop in system frequency which would cause the Generating Unit under restricted/free governor action to change its output from zero to full load; (ll) "Grid Standards" means the standards specified by the Authority under clause (d) of the Section 73 of the Act; (mm) "Extra High Voltage (EHV)" means where the voltage exceeds 33,000 volts under normal conditions, subject, however, to the percentage variation allowed by the Authority; (nn) "Independent Power Producer (IPP)" means a generating company not owned/ controlled by the Central/State Government; (oo) "Indian Electricity Grid Code (IEGC) or Grid Code" means these regulations specifying the philosophy and the responsibilities for planning and operation of Indian power system; (pp) "Inter-State Generating Station (ISGS)" means a Central generating station or other generating station, in which two or more states have Shares; (qq) "Inter State Transmission System (ISTS)" means (i) Any system for the conveyance of electricity by means of a main transmission line from the territory of one State to another State (ii) The conveyance of electricity across the territory of an intervening State as well as conveyance within the State which is incidental to such inter-state transmission of energy (iii) The transmission of electricity within the territory of State on a system built, owned, operated, maintained or controlled by CTU; (rr) "Licensee" means a person who has been granted a license under Section 14 of the Act; (ss) "Load" means the MW/MWh /MVAR/MVARh consumed by a utility/ installation; (tt) "Long -term Access" means the right to use the inter-State transmission system for a period exceeding 12 years but not exceeding 25 years; (uu) "Long-term customer" means a person who has been granted long-term access and includes a person who has been allocated central sector generation that is electricity supply from a generating station owned or controlled by the Central Government; (vv) "Maximum Continuous Rating (MCR)" means the maximum continuous output in MW at the generator terminals guaranteed by the manufacturer at rated parameters; (ww) "Medium-term Open Access" means the right to use the interstate transmission system for a period exceeding 3 months but not exceeding 3 years; (xx) "Medium-term customer" means a person who has been granted medium-term open access: (yy) "National Grid" means the entire inter-connected electric power network of the country; (zz) "Net Drawal Schedule" means the drawal schedule of a Regional Entity after deducting the apportioned transmission losses (estimated); (aaa) "NLDC" means the Centre established under sub-section (1) of Section 26 of the Act; (bbb) "Operation" means a scheduled or planned action relating to the operation of a System; (ccc) "Operation Coordination Sub-Committee (OCC)" means a sub-committee of RPC with members from all the regional entities which decides the operational aspects of the Regional Grid; (ddd) "Operating range" means the operating range of frequency and voltage as specified under the operating code (Part-5); (eee) "Pool Account" means regional account for (i) payments regarding unscheduled-interchanges (UI Account) or (ii) reactive energy exchanges (Reactive Energy Account) (iii) Congestion Charge (iv) Renewable Regulatory charge, as the case may be; (fff) "Powergrid" means Power Grid Corporation of India Limited which has been notified as CTU. (ggg) "Power Exchange" means the power exchange which has been granted registration in accordance with CERC (Power Market Regulations), 2010 as amended from time to time; (hhh) "Power System" means all aspects of generation, transmission, distribution and supply of electricity and includes one or more of the following, namely: (a) generating stations; (b) transmission or main transmission lines; (c) sub-stations; (d) tie-lines; (e) load despatch activities; (f) mains or distribution mains; (g) electric supply lines; (h) overhead lines; (i) service lines; (j) works; (iii) "Protection Coordination Sub-Committee" means a sub-committee of RPC with members from all the regional entities which decide on the protection aspects of the Regional Grid; (jjj) "Reactor" means an electrical facility specifically designed to absorb Reactive Power; (kkk) "Regional Entity" means such persons who are in the RLDC control area and whose metering and energy accounting is done at the regional level; (lll) "Regional Power Committee (RPC)" means a Committee established by resolution by the Central Government for a specific region for facilitating the integrated operation of the power systems in that region; (mmm) "RPC Secretariat" means the Secretariat of the RPC. (nnn) "Regional Energy Account (REA)" means a regional energy account prepared on monthly basis by the RPC Secretariat for the billing and settlement of 'Capacity Charge', 'Energy Charge' and transmission charges; (ooo) "Regional Grid" means the entire synchronously connected electric power network of the concerned Region; (ppp) "Regional Load Despatch Centre (RLDC)" means the Centre established under sub-section (1) of Section 27 of the Act; (qqq) "Share" means percentage share of a beneficiary in an ISGS either notified by Government of India or agreed through contracts and implemented through long term access; (rrr) "Short-term Open Access" means open access for a period up to one (1) month at one time; (sss) "Spinning Reserve" means part loaded generating capacity with some reserve margin that is synchronized to the system and is ready to provide increased generation at short notice pursuant to despatch instruction or instantaneously in response to a frequency drop; (ttt) "Standing Committee for Transmission Planning" means a Committee constituted by the CEA to discuss, review and finalise the proposals for expansion or modification in the ISTS and associated intra-state systems; (uuu) "SEB" means State Electricity Board which term includes State Electricity Department; (vvv) "SERC" means State Electricity Regulatory Commission (www) "State Load Despatch Centre (SLDC)" means the Centre established under subsection (1) of Section 31 of the Act; (xxx) "State Transmission Utility (STU)" means the Board or the Government Company specified as such by the State Government under sub-section (1) of Section 39 of the Act; (yyy) "Static VAR Compensator (SVC)" means an electrical facility designed for the purpose of generating or absorbing Reactive Power; (zzz) "Technical Coordination Committee (TCC)" means the committee set up by RPC to coordinate the technical and commercial aspects of the operation of the regional grid; (aaaa) "Time Block" means block of 15 minutes each for which Special Energy Meters record values of specified electrical parameters with first time block starting at 00.00 Hrs; (bbbb) "Total Transfer Capability (TTC)" means the amount of electric power that can be transferred reliably over the inter-control area transmission system under a given set of operating conditions considering the effect of occurrence of the worst credible contingency; (cccc) "Transmission License" means a License granted under Section 14 of the Act to transmit electricity; (dddd) "Transmission Planning Criteria" means the policy, standards and guidelines issued by the CEA for the planning and design of the Transmission system; (eeee) "Transmission Reliability Margin (TRM)" means the amount of margin kept in the total transfer capability necessary to ensure that the interconnected transmission network is secure under a reasonable range of uncertainties in system conditions; (ffff) "Unscheduled Interchange (UI)" means in a time block for a generating station or a seller means its total actual generation minus its total scheduled generation and for a beneficiary or buyer means its total actual drawal minus its total scheduled drawal; (gggg) "User" means a person such as a Generating Company including Captive Generating Plant or Transmission Licensee (other than the Central Transmission Utility and State Transmission utility) or Distribution Licensee or Bulk Consumer, whose electrical plant is connected to the ISTS at a voltage level 33kV and above; (2) Words and expressions used in these regulations and not defined herein but defined in the Act shall have the meaning assigned to them under the Act. Part 1 General 1.1 Introduction - The Indian Power System is a conglomeration of a number of agencies. Power system means all aspects of generation, transmission, distribution and supply of electricity and includes one or more of the following, namely :- (a) generating stations; (b) transmission or main transmission lines; (c) sub-stations; (d) tie-lines; (e) load despatch activities; (f) mains or distribution mains; (g) electric supply-lines; (h) overhead lines; (i) service lines; (j) works; 1.2. Objective. - The IEGC brings together a single set of technical and commercial rules, encompassing all the Utilities connected to/or using the inter-State transmission system (ISTS) and provides the following:
(ee) "Flexible Alternating Current Transmission System (FACTS)" means a power electronics based system and other static equipment that provide control of one or more AC transmission system parameters to enhance controllability and increase power transfer capability;
(ff) "Force Majeure" means any event which is beyond the control of the persons involved which they could not foresee or with' a reasonable amount of diligence could not have foreseen or which could not be prevented and which substantially affects the performance by person such being the following including but not limited to -
(a) Acts of God, natural phenomena, floods, droughts, earthquakes and epidemics;
(b) Enemy acts of any Government domestic or foreign, war declared or undeclared, hostilities, priorities, quarantines, embargoes;
(c) Riot or Civil Commotion;
(d) Grid's failure not attributable to the person,
(gg) "Forced Outage" means an outage of a Generating Unit or a transmission facility due to a fault or other reasons which has not been planned;
(hh) "Generating Company" means any company or body corporate or association or body of individuals, whether incorporated or not, or artificial juridical person, which owns or operates or maintains a generating station,
(ii) "Generating Unit" means an electrical Generating Unit coupled to a turbine within a Power Station together with all Plant and Apparatus at that Power Station which relates exclusively to the operation of that turbo-generator;
(jj) "Good Utility Practices" means any of the practices, methods and acts engaged in or approved by a significant portion of the electric utility industry during the relevant time period which could have been expected to accomplish the desired results at a reasonable cost consistent with good business practices, reliably, safely and with expedition;
(kk) "Governor Droop" means in relation to the operation of the governor of a Generating Unit, the percentage drop in system frequency which would cause the Generating Unit under restricted/free governor action to change its output from zero to full load;
(ll) "Grid Standards" means the standards specified by the Authority under clause (d) of the Section 73 of the Act;
(mm) "Extra High Voltage (EHV)" means where the voltage exceeds 33,000 volts under normal conditions, subject, however, to the percentage variation allowed by the Authority; (nn) "Independent Power Producer (IPP)" means a generating company not owned/ controlled by the Central/State Government; (oo) "Indian Electricity Grid Code (IEGC) or Grid Code" means these regulations specifying the philosophy and the responsibilities for planning and operation of Indian power system; (pp) "Inter-State Generating Station (ISGS)" means a Central generating station or other generating station, in which two or more states have Shares; (qq) "Inter State Transmission System (ISTS)" means (i) Any system for the conveyance of electricity by means of a main transmission line from the territory of one State to another State (ii) The conveyance of electricity across the territory of an intervening State as well as conveyance within the State which is incidental to such inter-state transmission of energy (iii) The transmission of electricity within the territory of State on a system built, owned, operated, maintained or controlled by CTU; (rr) "Licensee" means a person who has been granted a license under Section 14 of the Act; (ss) "Load" means the MW/MWh /MVAR/MVARh consumed by a utility/ installation; (tt) "Long -term Access" means the right to use the inter-State transmission system for a period exceeding 12 years but not exceeding 25 years; (uu) "Long-term customer" means a person who has been granted long-term access and includes a person who has been allocated central sector generation that is electricity supply from a generating station owned or controlled by the Central Government; (vv) "Maximum Continuous Rating (MCR)" means the maximum continuous output in MW at the generator terminals guaranteed by the manufacturer at rated parameters; (ww) "Medium-term Open Access" means the right to use the interstate transmission system for a period exceeding 3 months but not exceeding 3 years; (xx) "Medium-term customer" means a person who has been granted medium-term open access: (yy) "National Grid" means the entire inter-connected electric power network of the country; (zz) "Net Drawal Schedule" means the drawal schedule of a Regional Entity after deducting the apportioned transmission losses (estimated); (aaa) "NLDC" means the Centre established under sub-section (1) of Section 26 of the Act; (bbb) "Operation" means a scheduled or planned action relating to the operation of a System; (ccc) "Operation Coordination Sub-Committee (OCC)" means a sub-committee of RPC with members from all the regional entities which decides the operational aspects of the Regional Grid; (ddd) "Operating range" means the operating range of frequency and voltage as specified under the operating code (Part-5); (eee) "Pool Account" means regional account for (i) payments regarding unscheduled-interchanges (UI Account) or (ii) reactive energy exchanges (Reactive Energy Account) (iii) Congestion Charge (iv) Renewable Regulatory charge, as the case may be; (fff) "Powergrid" means Power Grid Corporation of India Limited which has been notified as CTU. (ggg) "Power Exchange" means the power exchange which has been granted registration in accordance with CERC (Power Market Regulations), 2010 as amended from time to time; (hhh) "Power System" means all aspects of generation, transmission, distribution and supply of electricity and includes one or more of the following, namely: (a) generating stations; (b) transmission or main transmission lines; (c) sub-stations; (d) tie-lines; (e) load despatch activities; (f) mains or distribution mains; (g) electric supply lines; (h) overhead lines; (i) service lines; (j) works; (iii) "Protection Coordination Sub-Committee" means a sub-committee of RPC with members from all the regional entities which decide on the protection aspects of the Regional Grid; (jjj) "Reactor" means an electrical facility specifically designed to absorb Reactive Power; (kkk) "Regional Entity" means such persons who are in the RLDC control area and whose metering and energy accounting is done at the regional level; (lll) "Regional Power Committee (RPC)" means a Committee established by resolution by the Central Government for a specific region for facilitating the integrated operation of the power systems in that region; (mmm) "RPC Secretariat" means the Secretariat of the RPC. (nnn) "Regional Energy Account (REA)" means a regional energy account prepared on monthly basis by the RPC Secretariat for the billing and settlement of 'Capacity Charge', 'Energy Charge' and transmission charges; (ooo) "Regional Grid" means the entire synchronously connected electric power network of the concerned Region; (ppp) "Regional Load Despatch Centre (RLDC)" means the Centre established under sub-section (1) of Section 27 of the Act; (qqq) "Share" means percentage share of a beneficiary in an ISGS either notified by Government of India or agreed through contracts and implemented through long term access; (rrr) "Short-term Open Access" means open access for a period up to one (1) month at one time; (sss) "Spinning Reserve" means part loaded generating capacity with some reserve margin that is synchronized to the system and is ready to provide increased generation at short notice pursuant to despatch instruction or instantaneously in response to a frequency drop; (ttt) "Standing Committee for Transmission Planning" means a Committee constituted by the CEA to discuss, review and finalise the proposals for expansion or modification in the ISTS and associated intra-state systems; (uuu) "SEB" means State Electricity Board which term includes State Electricity Department; (vvv) "SERC" means State Electricity Regulatory Commission (www) "State Load Despatch Centre (SLDC)" means the Centre established under subsection (1) of Section 31 of the Act; (xxx) "State Transmission Utility (STU)" means the Board or the Government Company specified as such by the State Government under sub-section (1) of Section 39 of the Act; (yyy) "Static VAR Compensator (SVC)" means an electrical facility designed for the purpose of generating or absorbing Reactive Power; (zzz) "Technical Coordination Committee (TCC)" means the committee set up by RPC to coordinate the technical and commercial aspects of the operation of the regional grid; (aaaa) "Time Block" means block of 15 minutes each for which Special Energy Meters record values of specified electrical parameters with first time block starting at 00.00 Hrs; (bbbb) "Total Transfer Capability (TTC)" means the amount of electric power that can be transferred reliably over the inter-control area transmission system under a given set of operating conditions considering the effect of occurrence of the worst credible contingency; (cccc) "Transmission License" means a License granted under Section 14 of the Act to transmit electricity; (dddd) "Transmission Planning Criteria" means the policy, standards and guidelines issued by the CEA for the planning and design of the Transmission system; (eeee) "Transmission Reliability Margin (TRM)" means the amount of margin kept in the total transfer capability necessary to ensure that the interconnected transmission network is secure under a reasonable range of uncertainties in system conditions; (ffff) "Unscheduled Interchange (UI)" means in a time block for a generating station or a seller means its total actual generation minus its total scheduled generation and for a beneficiary or buyer means its total actual drawal minus its total scheduled drawal; (gggg) "User" means a person such as a Generating Company including Captive Generating Plant or Transmission Licensee (other than the Central Transmission Utility and State Transmission utility) or Distribution Licensee or Bulk Consumer, whose electrical plant is connected to the ISTS at a voltage level 33kV and above; (2) Words and expressions used in these regulations and not defined herein but defined in the Act shall have the meaning assigned to them under the Act. Part 1 General 1.1 Introduction - The Indian Power System is a conglomeration of a number of agencies. Power system means all aspects of generation, transmission, distribution and supply of electricity and includes one or more of the following, namely :-
(nn) "Independent Power Producer (IPP)" means a generating company not owned/ controlled by the Central/State Government;
(oo) "Indian Electricity Grid Code (IEGC) or Grid Code" means these regulations specifying the philosophy and the responsibilities for planning and operation of Indian power system;
(pp) "Inter-State Generating Station (ISGS)" means a Central generating station or other generating station, in which two or more states have Shares;
(qq) "Inter State Transmission System (ISTS)" means
(i) Any system for the conveyance of electricity by means of a main transmission line from the territory of one State to another State
(ii) The conveyance of electricity across the territory of an intervening State as well as conveyance within the State which is incidental to such inter-state transmission of energy
(iii) The transmission of electricity within the territory of State on a system built, owned, operated, maintained or controlled by CTU;
(rr) "Licensee" means a person who has been granted a license under Section 14 of the Act;
(ss) "Load" means the MW/MWh /MVAR/MVARh consumed by a utility/ installation;
(tt) "Long -term Access" means the right to use the inter-State transmission system for a period exceeding 12 years but not exceeding 25 years;
(uu) "Long-term customer" means a person who has been granted long-term access and includes a person who has been allocated central sector generation that is electricity supply from a generating station owned or controlled by the Central Government;
(vv) "Maximum Continuous Rating (MCR)" means the maximum continuous output in MW at the generator terminals guaranteed by the manufacturer at rated parameters;
(ww) "Medium-term Open Access" means the right to use the interstate transmission system for a period exceeding 3 months but not exceeding 3 years;
(xx) "Medium-term customer" means a person who has been granted medium-term open access:
(yy) "National Grid" means the entire inter-connected electric power network of the country;
(zz) "Net Drawal Schedule" means the drawal schedule of a Regional Entity after deducting the apportioned transmission losses (estimated);
(aaa) "NLDC" means the Centre established under sub-section (1) of Section 26 of the Act;
(bbb) "Operation" means a scheduled or planned action relating to the operation of a System;
(ccc) "Operation Coordination Sub-Committee (OCC)" means a sub-committee of RPC with members from all the regional entities which decides the operational aspects of the Regional Grid;
(ddd) "Operating range" means the operating range of frequency and voltage as specified under the operating code (Part-5);
(eee) "Pool Account" means regional account for (i) payments regarding unscheduled-interchanges (UI Account) or (ii) reactive energy exchanges (Reactive Energy Account) (iii) Congestion Charge (iv) Renewable Regulatory charge, as the case may be;
(fff) "Powergrid" means Power Grid Corporation of India Limited which has been notified as CTU.
(ggg) "Power Exchange" means the power exchange which has been granted registration in accordance with CERC (Power Market Regulations), 2010 as amended from time to time;
(hhh) "Power System" means all aspects of generation, transmission, distribution and supply of electricity and includes one or more of the following, namely:
(a) generating stations;
(b) transmission or main transmission lines;
(c) sub-stations;
(d) tie-lines;
(e) load despatch activities;
(f) mains or distribution mains;
(g) electric supply lines;
(h) overhead lines;
(i) service lines;
(j) works;
(iii) "Protection Coordination Sub-Committee" means a sub-committee of RPC with members from all the regional entities which decide on the protection aspects of the Regional Grid;
(jjj) "Reactor" means an electrical facility specifically designed to absorb Reactive Power;
(kkk) "Regional Entity" means such persons who are in the RLDC control area and whose metering and energy accounting is done at the regional level;
(lll) "Regional Power Committee (RPC)" means a Committee established by resolution by the Central Government for a specific region for facilitating the integrated operation of the power systems in that region; (mmm) "RPC Secretariat" means the Secretariat of the RPC. (nnn) "Regional Energy Account (REA)" means a regional energy account prepared on monthly basis by the RPC Secretariat for the billing and settlement of 'Capacity Charge', 'Energy Charge' and transmission charges; (ooo) "Regional Grid" means the entire synchronously connected electric power network of the concerned Region; (ppp) "Regional Load Despatch Centre (RLDC)" means the Centre established under sub-section (1) of Section 27 of the Act; (qqq) "Share" means percentage share of a beneficiary in an ISGS either notified by Government of India or agreed through contracts and implemented through long term access; (rrr) "Short-term Open Access" means open access for a period up to one (1) month at one time; (sss) "Spinning Reserve" means part loaded generating capacity with some reserve margin that is synchronized to the system and is ready to provide increased generation at short notice pursuant to despatch instruction or instantaneously in response to a frequency drop; (ttt) "Standing Committee for Transmission Planning" means a Committee constituted by the CEA to discuss, review and finalise the proposals for expansion or modification in the ISTS and associated intra-state systems; (uuu) "SEB" means State Electricity Board which term includes State Electricity Department; (vvv) "SERC" means State Electricity Regulatory Commission (www) "State Load Despatch Centre (SLDC)" means the Centre established under subsection (1) of Section 31 of the Act; (xxx) "State Transmission Utility (STU)" means the Board or the Government Company specified as such by the State Government under sub-section (1) of Section 39 of the Act; (yyy) "Static VAR Compensator (SVC)" means an electrical facility designed for the purpose of generating or absorbing Reactive Power; (zzz) "Technical Coordination Committee (TCC)" means the committee set up by RPC to coordinate the technical and commercial aspects of the operation of the regional grid; (aaaa) "Time Block" means block of 15 minutes each for which Special Energy Meters record values of specified electrical parameters with first time block starting at 00.00 Hrs; (bbbb) "Total Transfer Capability (TTC)" means the amount of electric power that can be transferred reliably over the inter-control area transmission system under a given set of operating conditions considering the effect of occurrence of the worst credible contingency; (cccc) "Transmission License" means a License granted under Section 14 of the Act to transmit electricity; (dddd) "Transmission Planning Criteria" means the policy, standards and guidelines issued by the CEA for the planning and design of the Transmission system; (eeee) "Transmission Reliability Margin (TRM)" means the amount of margin kept in the total transfer capability necessary to ensure that the interconnected transmission network is secure under a reasonable range of uncertainties in system conditions; (ffff) "Unscheduled Interchange (UI)" means in a time block for a generating station or a seller means its total actual generation minus its total scheduled generation and for a beneficiary or buyer means its total actual drawal minus its total scheduled drawal; (gggg) "User" means a person such as a Generating Company including Captive Generating Plant or Transmission Licensee (other than the Central Transmission Utility and State Transmission utility) or Distribution Licensee or Bulk Consumer, whose electrical plant is connected to the ISTS at a voltage level 33kV and above; (2) Words and expressions used in these regulations and not defined herein but defined in the Act shall have the meaning assigned to them under the Act.
(mmm) "RPC Secretariat" means the Secretariat of the RPC.
(nnn) "Regional Energy Account (REA)" means a regional energy account prepared on monthly basis by the RPC Secretariat for the billing and settlement of 'Capacity Charge', 'Energy Charge' and transmission charges;
(ooo) "Regional Grid" means the entire synchronously connected electric power network of the concerned Region;
(ppp) "Regional Load Despatch Centre (RLDC)" means the Centre established under sub-section (1) of Section 27 of the Act;
(qqq) "Share" means percentage share of a beneficiary in an ISGS either notified by Government of India or agreed through contracts and implemented through long term access;
(rrr) "Short-term Open Access" means open access for a period up to one (1) month at one time;
(sss) "Spinning Reserve" means part loaded generating capacity with some reserve margin that is synchronized to the system and is ready to provide increased generation at short notice pursuant to despatch instruction or instantaneously in response to a frequency drop;
(ttt) "Standing Committee for Transmission Planning" means a Committee constituted by the CEA to discuss, review and finalise the proposals for expansion or modification in the ISTS and associated intra-state systems;
(uuu) "SEB" means State Electricity Board which term includes State Electricity Department;
(vvv) "SERC" means State Electricity Regulatory Commission
(www) "State Load Despatch Centre (SLDC)" means the Centre established under subsection (1) of Section 31 of the Act;
(xxx) "State Transmission Utility (STU)" means the Board or the Government Company specified as such by the State Government under sub-section (1) of Section 39 of the Act;
(yyy) "Static VAR Compensator (SVC)" means an electrical facility designed for the purpose of generating or absorbing Reactive Power;
(zzz) "Technical Coordination Committee (TCC)" means the committee set up by RPC to coordinate the technical and commercial aspects of the operation of the regional grid;
(aaaa) "Time Block" means block of 15 minutes each for which Special Energy Meters record values of specified electrical parameters with first time block starting at 00.00 Hrs;
(bbbb) "Total Transfer Capability (TTC)" means the amount of electric power that can be transferred reliably over the inter-control area transmission system under a given set of operating conditions considering the effect of occurrence of the worst credible contingency;
(cccc) "Transmission License" means a License granted under Section 14 of the Act to transmit electricity;
(dddd) "Transmission Planning Criteria" means the policy, standards and guidelines issued by the CEA for the planning and design of the Transmission system;
(eeee) "Transmission Reliability Margin (TRM)" means the amount of margin kept in the total transfer capability necessary to ensure that the interconnected transmission network is secure under a reasonable range of uncertainties in system conditions;
(ffff) "Unscheduled Interchange (UI)" means in a time block for a generating station or a seller means its total actual generation minus its total scheduled generation and for a beneficiary or buyer means its total actual drawal minus its total scheduled drawal;
(gggg) "User" means a person such as a Generating Company including Captive Generating Plant or Transmission Licensee (other than the Central Transmission Utility and State Transmission utility) or Distribution Licensee or Bulk Consumer, whose electrical plant is connected to the ISTS at a voltage level 33kV and above;
Part 1
General
1.1 Introduction
(a) generating stations;
(b) transmission or main transmission lines;
(c) sub-stations;
(d) tie-lines;
(e) load despatch activities;
(f) mains or distribution mains;
(g) electric supply-lines;
(h) overhead lines;
(i) service lines;
(j) works;
1.2. Objective.
• Documentation of the principles and procedures which define the relationship between the various Users of the inter-State transmission system (ISTS), National Load Despatch Centre, as well as the Regional and State Load Despatch Centers
• Facilitation of the optimal operation of the grid, facilitation of coordinated and optimal maintenance planning of generation and transmission facilities in the grid and facilitation of development and planning of economic and reliable National / Regional Grid
• Facilitation for functioning of power markets and ancillary services by defining a common basis of operation of the ISTS, applicable to all the Users of the ISTS.
• Facilitation of the development of renewable energy sources by specifying the technical and commercial aspects for integration of these resources into the grid.
1.3. Scope.
(ii) For the purpose of the IEGC, the Damodar Valley Corporation (DVC) will be treated similar to a SEB, in view of the fact that DVC is a vertically integrated utility like a SEB and has its own generation, transmission and distribution in the identified command area. Accordingly Central Load< Despatch at Maithon shall perform functions of SLDC envisaged in this code for the area of DVC.
(iii) For the purpose of the IEGC, the generating stations of the Bhakra Beas Management Board (BBMB) and Sardar Sarovar Project (SSP) shall be treated as intra-State generating stations, though their transmission systems shall be a part of the ISTS. This is because of the fact that only some of the States of Northern Region/ Western Region have a Share in BBMB/ SSP, and their generating units have to be scheduled and despatched in a very special manner (in coordination with the irrigational requirements). The scheduling and despatch of the BBMB/ SSP generation shall continue to be the responsibility of the BBMB/ Narmada Control Authority (NCA), with a proviso that it shall be duly coordinated with the respective Regional Load Despatch Centre and the beneficiaries.
(iv) Any neighbouring country inter-connected with Indian (National) Grid shall be treated as a separate control area.
1.4. Structure of the IEGC.
(i) Part 2: Role of various Organizations and their linkages. - This Part defines the functions of the various Organizations as are relevant to IEGC.
(i) Part 2: Role of various Organizations and their linkages.
(ii) Part 3:Planning Code for inter-State transmission. - This Part provides the guidelines to be adopted in the planning and development of bulk power transfer and associated ISTS. The Planning Code lays out the detailed information exchange required between the planning agencies and the various participants of the power system for load forecasting, generation availability, and power system planning etc. for the future years under study. The Planning Code stipulates the various criteria to be adopted during the planning process.
(ii) Part 3:Planning Code for inter-State transmission.
(iii) Part 4: Connection Code. - This Part specifies minimum technical and design criteria to be complied with by STU, CTU and any User connected to the system or seeking connection to the ISTS, to maintain uniformity and quality across the system. This also includes procedure for connection to the ISIS
(iii) Part 4: Connection Code.
(iv) Part 5: Operating Code. - This Part describes the operational philosophy to maintain efficient, secure and reliable Grid Operation and contains the following sections.
(iv) Part 5: Operating Code.
(a) Operating Philosophy
(b) System security aspects. - This section describes the general security aspects to be followed by generating companies and all Regional Entities, CTU, STU, and all other Users of the Grid.
(c) Demand Estimation for operational purposes. - This section details the procedures to estimate the demand by the SEB/distribution licensees for their systems / SLDCs in their control area for the day/week/month/year ahead, which shall be used for operational planning.
(d) Demand management. - This section identifies the methodology to be adopted for demand control by each SEB/SLDC/Distribution Licensee/bulk consumer depending on, over drawal by the entity, frequency, voltage and transmission congestion and any other requirement of grid security.
(e) Periodic Reports. - This section provides various provisions for reporting of the operating parameters of the grid such as frequency profile etc.
(f) Operational liaison. - This section sets out the requirement for the exchange of information in relation to normal operation and/or events in the grid.
(g) Outage Planning. - This section indicates procedure for outage planning.
(h) Recovery procedures. - This section contains the procedures to be adopted following a major grid disturbance, for black start and resynchronization of islands, etc.
(i) Event Information. - This section indicates the procedure by which events are reported and the related information exchange requirements etc.
(v) Part 6: Scheduling and Despatch Code. - This section deals with the procedure to be adopted for scheduling and Despatch of generation of the Inter-State Generating Stations (ISGS) and scheduling for other transactions through long-term access, medium-term and short-term open access including comple-mentary commercial mechanisms, on a day-ahead and intra-day basis with the process of the flow of information between the ISGS, National Load Despatch Centre (NLDC), Regional Load Despatch Centre (RLDC), Power Exchanges and the State Load Despatch Centres (SLDCs), and other concerned persons.
(v) Part 6: Scheduling and Despatch Code.
Most of the wind and solar energy sources are presently connected and in future are likely to be connected to the STU or the State's distribution utility. However, keeping in view the variable nature of generation from such sources and the effect such variability has on the inter- state grid, and in view of the large-scale integration of such sources into the grid envisaged in view of the Government of India's thrust on renewable sources of energy, scheduling of wind and solar energy sources has been incorporated in.this Code.
(vi) Part 7: Miscellaneous
(vi) Part 7: Miscellaneous
1.5. Compliance Oversight.
(ii) The Regional Power Committee (RPC) in the region shall also continuously monitor the instances of non-compliance of the provisions of IEGC and try to sort out all operational issues and deliberate on the ways in which such cases of non-compliance are prevented in future by building consensus. The Member Secretary RPC may also report any issue that cannot be sorted out at the RPC forum to the Commission. The RPC shall also file monthly reports on status of UI payment and installation of capacitors by states vis-a-vis the requirement/targets, as decided in the RPC.
(iii) The Commission may initiate appropriate proceedings upon receipt of report of RPCs or RLDCs referred to in (i) and (ii) above respectively.
(iv) In case of non-compliance of any provisions of the IEGC by NLDC, RLDC, SLDC, RPC and any other person the matter may be reported by any person to the CERC through petition.
(iv) Notwithstanding anything contained in these regulations, the Commission, may also take suo-motu action against any person, in case of non-compliance of any of the provisions of the IEGC.
Part-2
Role of Various Organizations and Their Linkages
2.1. Introduction.
2.2. Role of NLDC.
(a) supervision over the Regional Load Despatch Centers.
(b) scheduling and despatch of electricity over inter-regional links in accordance with Grid Standards specified by the Authority and Grid Code specified by Central Commission in coordination with Regional Load Despatch Centers.
(c) coordination with Regional Load Despatch Centers for achieving maximum economy and efficiency in the operation of National Grid. ,
(d) monitoring of operations and grid security of the National Grid.
(e) supervision and control over the inter-regional links as shall be required for ensuring stability of the power system under its control.
(f) coordination with Regional Power Committees for regional outage schedule in the national perspective to ensure optimal utilization of power resources.
(g) coordination with Regional Load Despatch Centers for the energy accounting of inter-regional exchange of power.
(h) coordination for restoration of synchronous operation of national grid with Regional Load Despatch Centers.
(i) coordination for transnational exchange of power.
(j) providing operational feed back for national grid planning to the Authority and the Central Transmission Utility.
(k) levy and collection of such fee and charges from the generating companies or licensees involved in the power system, as shall be specified by the Central Commission.
(l) dissemination of information relating to operations of transmission system in accordance with directions or regulations issued by Central Electricity Regulatory Commission and the Central Government from time to time."
(i) NLDC shall be the nodal agency for collective transactions.
(ii) NLDC would act as the Central control room in case of natural & man made emergency/disaster where it affects the power system operation.
(iii) Any other function as may be assigned by the Commission by order or regulations from time to time.
2.3. Role of RLDC.
(1) The Regional Load Despatch Centre shall be the apex body to ensure integrated operation of the power system in the concerned region.
(2) The Regional Load Despatch Centre shall comply with such principles, guidelines and methodologies in respect of wheeling and optimum scheduling and despatch of electricity as may be specified in the Grid Code.
(3) The Regional Load Despatch Centre shall-
(a) be responsible for optimum scheduling and despatch of electricity within the region, in accordance with the contracts entered into with the licensees or the generating companies operating in the region;
(b) monitor grid operations;
(c) keep accounts of quantity of electricity transmitted through the regional grid;
(d) exercise supervision and control over the Inter-State transmission system; and
(e) be responsible for carrying out real time operations for grid control and despatch of electricity within the region through secure and economic operation of the regional grid in accordance with the Grid Standards and the Grid Code.
(4) The Regional Load Despatch Centre may give such directions and exercise such supervision and control as may be required for ensuring stability of grid operations and for achieving the maximum economy and efficiency in the operation of the power system in the region under its control.
(5) Every licensee, generating company, generating station, substation and any other person connected with the operation-of the power system shall comply with the directions issued by the Regional Load Despatch Centers.
(6) All directions issued by the Regional Load Despatch Centers to any transmission licensee of State transmission lines or any other licensee of the State or generating company (other than those connected to inter-State transmission system) or substation in the State shall be issued through the State Load Despatch Centre and the State Load Despatch Centers shall ensure that such directions are duly complied with by the licensee or generating company or sub-station.
(7) If any dispute arises with reference to the quality of electricity or safe, secure and integrated operation of the regional grid or in relation to any direction given by the Regional Load Despatch Centre, it shall be referred to Central Commission for decision. However, pending the decision of the Central Commission, the directions of the Regional Load Despatch Centre shall be complied with by the State Load Despatch Centre or the licensee or the generating company, as the case may be.
(a) System operation and control including inter-state transfer of power, covering contingency analysis and operational planning on real time basis;
(b) Scheduling/ re-scheduling of generation;
(c) System restoration following grid disturbances;
(d) Metering and data collection;
(e) Compiling and furnishing data pertaining to system operation;
(f) Operation of regional UI pool account, regional reactive energy account and Congestion Charge Account, provided that such functions will be undertaken by any entity(ies) other than RLDCs if the Commission so directs.
(g) Operation of ancillary services
2.4. Role of RPC.
(a) To undertake Regional Level operation analysis for improving grid performance.
(b) To facilitate inter-state/inter-regional transfer of power.
(c) To facilitate all functions of planning relating to inter-state/ intrastate transmission system with CTU/STU.
(d) To coordinate planning of maintenance of generating machines of various generating companies of the region including those of interstate generating companies supplying electricity to the Region on annual basis and also to undertake review of maintenance programmed on monthly basis.
(e) To undertake planning of outage of transmission system on annual / monthly basis.
(f) To undertake operational planning studies including protection studies for stable operation of the grid.
(g) To undertake planning for maintaining proper voltages through review of reactive compensation requirement through system study committee and monitoring of installed capacitors.
(h) To evolve consensus on all issues relating to economy and efficiency in the operation of power system in the region.
2.5. Role of CTU.
(1) (a) to undertake transmission of electricity through inter-State transmission system;
(b) to discharge all functions of planning and co-ordination relating to inter-State transmission system with (i) State Transmission Utilities (ii) Central Government; (iii) State Governments; (iv) Generating companies; (v) Regional Power Committees; (vi) Authority; (vii) Licensees; (viii) Any other person notified by the Central Government in this behalf;
(c) to ensure development of an efficient, co-ordinated and economical system of inter-State transmission lines for smooth flow of electricity from generating stations lo the load centers;
(d) to provide non-discriminatory open access to its transmission system for use by (i) any licensee or generating company on payment of the transmission charges; or (ii) any consumer and when such open access is provided by the State Commission under sub-section (2) of section 42 of the Act, on payment of the transmission charges and a surcharge thereon, as may be specified by the Central Commission.
(2) Until a Government company or authority or corporation is notified by the Central Government, the Central Transmission Utility shall operate the Regional Load Despatch Centre.
2.6. Role of CEA.
(1) (i) CEA shall formulate short-term and perspective plans for development of the electricity system and co-ordinate the activities of the planning agencies for the optimal utilization of resources to subserve the interests of the national economy and to provide reliable and affordable electricity for all consumers.
(ii) to specify the technical standards for construction of electrical plants, electric lines and connectivity to the grid;
(iii) to specify the safety requirements for construction, operation and maintenance of electrical plants and electric lines;
(iv) to specify the Grid Standards for operation and maintenance of transmission lines; and,
(v) to specify the conditions for installation of meters for transmission and supply of electricity.
(vi) to promote and assist in the timely completion of schemes and projects for improving and augmenting the electricity system;
(vii) to collect and record the data concerning the generation, transmission, trading, distribution and utilisation of electricity and carry out studies relating to cost, efficiency, competitiveness and such like matters;
(viii) to carry out, or cause to be carried out, any Investigation for the purposes of generating or transmitting or distributing electricity.
2.7. Role of SLDC.
(1) The State Load Despatch Centre shall be the apex body to ensure * integrated operation of the power system in a State.
(2) The State Load Despatch Centre shall -
(a) be responsible for optimum scheduling and despatch of electricity within a State, in accordance with the contracts entered into with the licensees or the generating companies operating in that State;
(b) monitor grid operations;
(c) keep accounts of the quantity of electricity transmitted ' through the State grid;
(d) exercise supervision and control over the intra-State transmission system; and
(e) be responsible for carrying out real time operations for grid control and despatch of electricity within the State through secure and economic operation of the State grid in accordance with the Grid Standards and the State Grid Code.
2.8. Role of STU.
(1) (a) to undertake transmission of electricity through intra-State transmission system;
(b) to discharge all functions of planning and co-ordination relating to intra-state transmission system with (i) Central Transmission Utility; (ii) State Governments; (iii) generating companies; (iv) Regional Power Committees; (v) Authority; (vi) licensees; (vii) any other person notified by the State in this behalf;
(c) to ensure development of an efficient, co-ordinated and economical system of intra-State transmission lines for smooth flow of electricity from a generating station to the load centers;
(d) to provide non-discriminatory open access to its transmission system for use by -
(i) any licensee or generating company on payment of the transmission charges; or
(ii) any consumer as and when such open access is provided by the State Commission under sub-section (2) of section 42 of the Act, on payment of the transmission charges and a surcharge thereon, as may be specified by the State Commission.
(2) Until a Government company or any authority or corporation is notified by the State Government, the State Transmission Utility shall operate the State Load Despatch Centre.
Part 3
Planning Code for Inter-State Transmission
3.1. Introduction.
(ii) In accordance with Section 38(2)(d) of Electricity Act, 2003, the Central Transmission Utility (CTU) shall inter-alia provide non-discriminatory open access to its transmission system for use by
(a) any licensee or generating company on payment of the transmission charges; or
(b) any consumer as and when such open access is provided by the State Commission under sub-section (2) of Section 42, on payment of the transmission charges and a surcharge thereon, as may be specified by the Central Commission.
(iii) Similarly, in accordance with Section 39(2)(b) of Electricity Act, 2003, the State Transmission Utilities (STUs) shall discharge all functions of planning and coordination relating to intra-State transmission system with Central Transmission Utility, State Governments, Generating Companies, Regional Power Committees, Central Electricity Authority (CEA), licensees and any other person notified by the State Government in this behalf.
(iv) In accordance with Section 39(2)(d) of Electricity Act, 2003, the State Transmission Utility (STU) shall inter-alia provide non-discriminatory open access to its transmission system for use by -
(a) any licensee or generating company on payment of the transmission charges; or
(b) any consumer as and when such open access is provided by the State Commission under sub-section (2) of Section 42, on payment of the transmission charges and a surcharge thereon, as may be specified by the State Commission.
(v) In accordance with Section 4C of Electricity Act, 2003, the transmission licensee shall inter-alia provide non-discriminatory open access to its transmission system for use by
(a) any licensee or generating company on payment of the transmission charges; or
(b) any consumer as and when such open access is provided by the State Commission under sub-section (2) of Section 42, on payment of the transmission charges and a surcharge thereon, as may be specified by the State Commission.
(vi) In accordance with Section 3 (4) of Electricity Act, 2003, CEA shall inter-alia prepare a National Electricity Plan in accordance with the National Electricity Policy and notify such plan once in five (5) years. In accordance with Section 3 (5) of Electricity Act, 2003, CEA may review or revise the National Electricity Plan in accordance with the National Electricity Policy.
(vii) In accordance with Section 73 (a) of Electricity Act, 2003, CEA is responsible to advise the Central Government on the matters relating to the National Electricity Policy, formulate short-term and perspective plans for development of the electricity system and co-ordinate the activities of planning agencies for optimal utilization of resources to sub-serve the interests of the national economy and to provide reliable and affordable electricity for all consumers.
(viii) The Planning Code specifies the philosophy and procedures to be applied in planning of National Grid, Regional Grids and Inter Regional links.
3.2 Objective.
(a) To specify the principles, procedures and criteria which shall be used in the planning and development of the ISTS and inter regional links.
(b) To promote co-ordination amongst all Users, STU,/SLDC and CTU/RLDC, NLDC, RPC and CEA in any proposed development of the ISTS.
(c) To provide methodology and information exchange amongst Users, STU/SLDC and CTU/RLDC, RPC, NLDC and CEA in the * planning and development of the ISTS.
3.3. Scope.
3.4. Planning Philosophy.
(b) The CTU shall carry out planning process from time to time as per the requirement for identification of inter-State transmission system including transmission system associated with Generation Projects, regional and inter-regional system strengthening schemes which shall fit in with the perspective plan developed by CEA. While planning schemes, the following shall be considered in addition to the data of authenticated nature collected from and in consultation with users by CTU:
(i) Perspective plan formulated by CEA.
(ii) Electric Power Survey of India published by the CEA.
(iii) Transmission Planning Criteria and guidelines issued by the CEA
(iv) Operational feedback from RPCs
(v) Operational feedback from NLDC/RLDC/SLDC
(vi) Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-state Transmission and related matters) Regulations, 2009.
(vii) Renewable capacity addition plan issued by Ministry of New and Renewable Energy Sources (MNRES), Government of India
(c) In addition to the inter-State transmission system, the CTU shall plan, from time to time, system strengthening schemes, need of which may arise to overcome the constraints in power transfer and to improve the overall performance of the grid. The interstate transmission proposals including system strengthening scheme identified on the basis of the planning studies would be discussed, reviewed and finalized in the meetings of Regional Standing Committees for Transmission Planning constituted by CEA, in consultation with the Regional Entities, RPC, CEA, NLDC and the RLDC and action may be taken by CTU on the basis of Power Purchase Agreements (PPAs) signed with the beneficiaries. In case of associated transmission system where all PPAs have not yet been signed, and where agreement could not be reached in respect of system strengthening schemes, the CTU may approach CERC for the regulatory approval in accordance with Central Electricity Regulatory Commission (Grant of Regulatory Approval for Capital Investment to CTU for execution of Inter-State Transmission Scheme) Regulations, as and when they come into force.
(d) All, STUs and Users will supply to the CTU, the desired planning data from time to time to enable to formulate and finalize its plan.
(e) As voltage management plays an important role in inter-state transmission of energy, special attention shall be accorded, by CTU, for planning of capacitors, reactors, SVC and Flexible Alternating Current Transmission Systems (FACTS), etc. Similar exercise shall be done by STU for intra-State transmission system to optimize the utilistion of the integrated transmission network.
(f) Based on Plans prepared by the CTU, State Transmission Utilities (STU) shall have to plan their systems to further evacuate power from the ISTS and to optimize the use of integrated transmission network.
(g) In case Long Term Access Applications require any strengthening in the intra-State transmission system to absorb/evacuate power beyond ISTS, the applicant shall coordinate with the concerned STU.STU shall augment the intra-state transmission system in a reasonable time to facilitate the interchange of such power.
(h) The Inter-State Transmission System and associated intra-State transmission system are complementary and inter-dependent and planning of one affects the other's planning and performance. Therefore, the associated intra-State transmission system shall also be discussed and reviewed before implementation during the discussion for finalizing ISTS proposal indicated at 3.4 (b) above.
3.5. Planning Criterion General Philosophy.
(i) As a general rule, the ISTS shall be capable of withstanding and be secured against the following contingency outages a. without necessitating load shedding or rescheduling of generation during Steady State Operation:
- Outage of a 132 kV D/C line or,
- Outage of a 220 kV D/C line or,
- Outage of a 400 kV S/C line or,
- Outage of single Interconnecting Transformer, or
- Outage of one pole of HVDC Bipole line, or one pole of HVDC back to back Station or
- Outage of 765 kV S/C line
(b) without necessitating load shedding but could be with rescheduling of generation during steady state operation-
- Outage of a 400 kV S/C line with TCSC, or
- Outage of a 400kV D/C line, or
- Outage of both pole of HVDC Bipole line or both poles of HVDC back to back Station or
- Outage of a 765kV S/C line with series compensation.
(ii) The above contingencies shall be considered assuming a pre-contingency system depletion (Planned outage) of another 220 kV D/C line or 400 kV S/C line in another corridor and not emanating from the same substation. The planning study would assume that all the Generating Units operate within their reactive capability curves and the network voltage profile are also maintained within voltage limits specified.
(c) The ISTS shall be capable of withstanding the loss of most severe single system in feed without loss of stability.
(d) Any one of these events defined above shall not cause:
(i) Loss of supply
(ii) Prolonged operation of the system frequency below and above specified limits.
(iii) Unacceptable high or low voltage
(iv) System instability
(v) Unacceptable overloading of ISTS elements.
(e) In all substations (132 kV and above), at least two transformers shall be provided.
(f) CTU shall carry out planning studies for Reactive Power compensation of ISTS including reactive power compensation requirement at the generator's /bulk consumer's switchyard and for connectivity of new generator/ bulk consumer to the ISTS in accordance with Central Electricity Regulatory Commission ( Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-state Transmission and related matters) Regulations, 2009.
(g) Suitable System Protection Schemes may be planned by NLDC/RLDC in consultation with CEA, CTU, RPC and the Regional Entities, either for enhancing transfer capability or to take care of contingencies beyond that indicated in a(i) above
3.6. Planning Data.
3.7. Implementation of Transmission Plan.
Part 4
Connection Code
4.1. Introduction.
4.2. Objective.
(a) To ensure the safe operation, integrity and reliability of the grid.
(b) That the basic rules for connectivity are complied with in order to treat all users in a non-discriminatory manner.
(c) Any new or modified connections, when established, shall neither suffer unacceptable effects due to its connectivity to the ISTS nor impose unacceptable effects on the system of any other connected User or STU.
(d) Any person seeking a new connection to the grid is required to be aware, in advance, of the procedure for connectivity to the ISTS and also the standards and conditions his system has to meet for being integrated into the grid.
4.3. Scope.
4.4. Procedure for connection.
4.5. Connection Agreement.
4.6. Important Technical Requirements for Connectivity to the Grid
4.6.1 Reactive Power Compensation.
(b) The person already connected to the grid shall also provide additional reactive compensation as per the quantum and time frame decided by respective RPC in consultation with RLDC. The Users and STUs shall provide information to RPC and RLDC regarding the installation and healthiness of the reactive compensation equipment on regular basis. RPC shall regularly monitor the status in this regard.
4.6.2 Data and Communication Facilities.
4.6.3 System Recording Instruments.
4.6.4 Responsibilities for safety.
4.6.5 Cyber Security.
4.7. International Connections to ISTS.
4.8. Schedule of assets of Regional Grid.
Part 5
Operating Code
5.1. Operating philosophy.
(b) Overall operation of the National / inter-regional grid shall be supervised from the National Load Despatch Centre (NLDC). Operation of the Regional grid shall be supervised from the Regional Load Despatch Centre (RLDC). The roles of NLDC,RLDC, RPC and SLDC shall be in accordance with the provisions made in Part-2 of the IEGC.
(c) All persons shall comply with this Operating Code, for deriving maximum benefits from the integrated operation and for equitable sharing of obligations.
(d) All licensees, generating company, generating station and any other person connected with the operation power system shall comply with the directions issued by the respective RLDC /SLDC to ensure integrated grid operation and for achieving the maximum economy and efficiency in the operation of the power system.
(e) A set of detailed operating procedures for the National grid shall be developed and maintained by the NLDC in consultation with the RLDCs, for guidance of the staff of the NLDC and it shall be consistent with IEGC to enable compliance with the requirement of this IEGC.
(f) A set of detailed operating procedures for each regional grid shall be developed and maintained by the respective RLDC in consultation with the regional entities for guidance of the staff of RLDC. and shall be consistent with IEGC to enable compliance with the requirement of this IEGC.
(g) A set of detailed operating procedures for each state grid shall be developed and maintained by the respective SLDC in consultation with the concerned persons for guidance of the staff of SLDC and shall be consistent with IEGC to facilitate compliance with the requirement of this IEGC.
(h) The control rooms of the NLDC, RLDC, all SLDCs, power plants, substation of 132 kV and above, and any other control centers of all regional entities shall be manned round the clock by qualified and adequately trained personnel. Training requirements may be notified by the Commission from time to time, by orders.
5.2. System Security Aspects.
(b) No part of the grid shall be deliberately isolated from the rest of the National/Regional grid, except (i) under an emergency, and conditions in which such isolation would prevent a total grid collapse and/or would enable early restoration of power supply, (ii) for safety of human life (iii) when serious damage to a costly equipment is imminent and such isolation would prevent it, (iv) when such isolation is specifically instructed by RLDC. Complete synchronization of grid shall be restored as soon as the conditions again permit it. The restoration process shall be supervised by RLDC, in co-ordination with NLDC /SLDC in accordance with operating procedures separately formulated NLDC/RLDC.
(c) No important element of the National/Regional grid shall be deliberately opened or removed from service at any time, except when specifically instructed by RLDC or with specific and prior clearance of RLDC. The list of such important grid elements on which the above stipulations apply shall be prepared by the RLDC in consultation with the concerned Users, CTU and STUs, and be available at the websites of NLDC/RLDC/SLDCs. In case of opening/removal of any important element of the grid under an emergency situation, the same shall be communicated to RLDC at the earliest possible time after the event. RLDC shall inform the opening/removal of the important elements of the regional grid, to NLDC, and to the concerned Regional Entities (whose grid would be affected by it) as specified in the detailed operating procedure by NLDC.
(d) Any tripping, whether manual or automatic, of any of the above elements of Regional grid shall be precisely intimated by the concerned SLDC/CTU/User to RLDC as soon as possible, say within ten minutes of the event. The reason (to the extent determined) and the likely time of restoration shall also be intimated. All reasonable attempts shall be made for the elements' restoration as soon as possible. RLDC shall inform the tripping of the important elements of the regional grid, to NLDC, and to the concerned Regional Entities (whose grid would be affected by it) as specified in the detailed operating procedure by NLDC.
(e) Any prolonged outage of power system elements of any User/CTU/STU, which is causing or likely to cause danger to the grid or sub-optimal operation of the grid shall regularly be monitored by RLDC. RLDC shall report such outages to RPC. RPC shall finalise action plan and give instructions to restore such elements in a specified time period.
(f) All thermal generating units of 200 MW and above and all hydro units of 10 MW and above, which are synchronized with the grid, irrespective of their ownership, shall have their governors in operation at all times in accordance with the following provisions:
Governor Action
Governor Action
(i) Following Thermal and hydro (except those with upto three hours pondage) generating units shall be operated under restricted governor mode of operation with effect from the date 'given below:
(a) Thermal generating units of 200 MW and above,
(1) Software based Electro Hydraulic Governor (EHG) system 01.08.2010
(2) Hardware based EHG system 01.08.2010
(b) Hydro units of 10 MW and above 01.08.2010
(ii) The restricted governor mode of operation shall essentially have the following features:
(a) There should not be any reduction in generation in case of improvement in grid frequency below 50.2 Hz. (for example if grid frequency changes from 49.3 to 49.4 Hz. then there shall not be any reduction in generation). Whereas for any fall in grid frequency, generation from the unit should increase by 5% limited to 105 % of the MCR of the unit subject to machine capability.
(b) Ripple filter of +/- 0.03 Hz. shall be provided so that small changes in frequency are ignored for load correction, in order to prevent governor hunting.
(c) If any of these generating units is required to be operated without its governor in operation as specified above, the RLDC shall be immediately advised about the reason and duration of such operation. All governors shall have a droop setting of between 3% and 6%.
(d) After stablisation of frequency around 50 Hz, the CERC may review the above provision regarding the restricted governor mode of operation and free governor mode of operation may be introduced.
(iii) All other generating units including the poundage up to 3 hours Gas turbine/Combined Cycle Power Plants, wind and solar generators and Nuclear Power Stations shall be exempted from Sections 5.2 (f) ,5.2 (g), 5.2 (h) and ,5.2(i) till the Commission reviews the situation.
(g) Facilities available with/in load limiters, Automatic Turbine Runup System (ATRS), Turbine supervisory control, coordinated control system, etc., shall not be used to suppress the normal governor action in any manner and no dead bands and/or time delays shall be deliberately introduced except as specified in para 5.2(f) above.
(h) All thermal generating units of 200 MW and above and all hydro units of 10 MW and above operating at or up to 100% of their Maximum Continuous Rating (MCR) shall normally be capable of (and shall not in any way be prevented from) instantaneously picking up to 105% and 110% of their MCR , respectively, when frequency falls suddenly. After an increase in generation as above, a generating unit may ramp back to the original level at a rate of about one percent (1%) per minute, in case continued operation at the increased level is not sustainable. Any generating unit not complying with the above requirements, shall be kept in operation (synchronized with the Regional grid) only after obtaining the permission of RLDC.
(i) The recommended rate for changing the governor setting, i.e., supplementary control for increasing or decreasing the output (generation level) for all generating units, irrespective of their type and size, would be one (ID) per cent per minute or as per manufacturer's limits. However, if frequency falls below 49.7Hz, all partly loaded generating units shall pick up additional load at a faster rate, according to their capability.
(j) Except under an emergency, or to prevent an imminent damage to a costly equipment, no User shall suddenly reduce his generating imit output by more than one hundred (100) MW (20 MW in case of NER) without prior intimation to and consent of the RLDC, particularly when frequency is falling or is below 49.5 Hz.. Similarly, no User / SEB shall cause a sudden variation in its load by more than one himdred (100 MW) without prior intimation to and consent of the RLDC.
(k) All generating units shall normally have their automatic voltage regulators (AVRs) in operation. In particular, if a generating unit of over fifty (50) MW size is required to be operated without its AVR in service, the RLDC shall be immediately intimated about the reason and duration, and its permission obtained. Power System Stabilizers (PSS) in AVRs of generating units (wherever provided), shall be got properly tuned by the respective generating unit owner as per a plan prepared for the purpose by the CTU/RPC from time to time. CTU /RPC will be allowed to carry out checking of PSS and further tuning it, wherever considered necessary.
(l) Provision of protections and relay settings shall be coordinated periodically throughout the Regional grid, as per a plan to be separately finalized by the Protection sub-Committee of the RPC.
(m) All Users, SEB, SLDCs, RLDCs, and NLDC shall take all possible measures to ensure that the grid frequency always remains within the 49.5 - 50.2 Hz band.
(n) All SEBS, distribution licensees / STUs shall provide automatic under-frequency and df/dt relays for load shedding in their respective systems, to arrest frequency decline that could result in a collapse/disintegration of the grid, as per the plan separately finalized by the concerned RPC and shall ensure its effective application to prevent cascade tripping of generating units in case of any contingency. All, SEBs, distribution licensees, CTU STUs and SLDCs shall ensure that the above under-frequency and df/dt load shedding/islanding schemes are always functional.RLDC shall inform RPC Secretariat about instances when the desired load relief is not obtained through these relays in real time operation. The provisions regarding under frequency and df/dt relays of relevant CEA Regulations shall be complied with. SLDC shall furnish monthly report of UFR and df/dt relay operation in their respective system to the respective RPC.
(o) All Users, STU/SLDC, CTU/RLDC and NLDC, shall also facilitate ' identification, installation and commissioning of System Protection Schemes (SPS) (including inter-tripping and run-back) in the power system to operate the transmission system closer to their limits and to protect against situations such as voltage collapse and cascade tripping, tripping of important corridors/flow-gates etc.. Such schemes would be finalized by the concerned RPC forum, and shall always be kept in service.If any SPS is to be taken out of service, permission of RLDC shall be obtained indicating reason and duration of anticipated outage from service.
(p) Procedures shall be developed to recover from partial / total collapse of the grid in accordance with CEA (Grid Standards)Regulations as and when the same comes into force and periodically update the same in accordance with the requirements given under section 5.8. These procedures shall be followed by all the Users , STU/SLDC and CTU,RLDC to ensure consistent, reliable and quick restoration.
(q) Each User, STU, RLDC, NLDC and CTU shall provide and maintain adequate and reliable communication facility internally and with other Users/STUs /RLDC/SLDC to ensure exchange of data/information necessary to maintain reliability and security of the grid. Wherever possible, redundancy and alternate path shall be maintained for communication along important routes, e.g., SLDC to RLDC to NLDC.
(r) All the Users , STU/SLDC and CTU shall send information/data including disturbance recorder/sequential event recorder output to RLDC within one week for purpose of analysis of any grid disturbance/event. No User,SLDC/STU or CTU shall block any data/information required by the RLDC and RPC for maintaining reliability and security of the grid and for analysis of an event.
(s) All Users, RLDC, SLDC STUs, CTU and NLDC shall take all possible measures to ensure that the grid voltage always remains within the following operating range.
Voltage - (kV rms)
Voltage - (kV rms)
Nominal
Nominal
Maximum
Maximum
Minimum
Minimum
765
800
728
400
420
380
220
245
198
132
145
122
110
121
99
66
72
60
33
36
30
(t) All Users, CTU and STUs shall provide adequate voltage control measures through voltage relay as finalized by RPC, to prevent voltage collapse and shall ensure its effective application to prevent voltage collapse/cascade tripping.
(u) Special requirements for Solar/ wind generators
(i) SLDC/RLDC may direct a wind farm to curtail its VAr drawl/ injection in case the security of grid or safety of any equipment or personnel is endangered.
(ii) During the wind generator start-up, the wind generator shall ensure that the reactive power drawl (inrush currents incase of induction generators) shall not affect the grid performance.
5.3. Demand Estimation for Operational Purposes.
(b) The demand estimation is to be done on daily/weekly/monthly /yearly basis for current year for load - generation balance planning. The SLDC shall carry out system studies for operational planning purposes using this demand estimate.
(c) Each SLDC shall develop methodologies/mechanisms for daily/weekly/ monthly/yearly demand estimation (MW, MVAr and MWh) for operational purposes. Based on this demand estimate and the estimated availability from different sources, SLDC shall plan demand management measures like load shedding, power cuts, etc. and shall ensure that the same is implemented by the SEB/distribution licensees. SLDCs. All SEBs/distribution licensees shall abide by the demand management measures of the SLDCs and shall also maintain historical database for demand estimation.
(d) Each SLDC shall carry out its own demand estimation from the historical data and weather forecast data from time to time. All distribution licensees and other concerned persons shall provide relevant data and other information as required by SLDC for demand estimate.
(e) While the demand estimation for operational purposes is to be done on a daily/weekly/monthly basis initially, mechanisms and facilities at SLDCs shall be created at the earliest but not later than 1.1.2011 to facilitate on-line estimation of demand for daily operational use for each 15 minutes block.
(f) The monthly estimated demand by the SLDC shall be provided to RLDC and RPC for better operation planning
(g) The SLDC shall take into account the Wind Energy forecasting to meet the active and reactive power requirement.
(h) In order to facilitate estimation of Total Transfer Capability /Available Transfer Capability on three month ahead basis, the SLDC shall furnish estimated demand and availability data to RLDCs.
5.4. Demand Management.
5.4.1 Introduction.
5.4.2 Demand Disconnection.
(b) The SLDC/ SEB/distribution licensee and bulk consumer shall ensure that requisite load shedding is carried out in its control area so that there is no overdrawl when frequency is 49.5 Hz. or below.
(c) Each User/STU/SLDC shall formulate contingency procedures and make arrangements that will enable demand disconnection to take place, as instructed by the RLDC/SLDC, under normal and/or contingent conditions. These contingency procedures and arrangements shall regularly be / updated by User/STU and monitored by RLDC/SLDC. RLDC/SLDC may direct any User/STU to modify the above procedures/arrangement, if required, in the interest of grid security and the concerned User/STU shall abide by these directions.
(d) The SLDC through respective State Electricity Boards/Distribution Licensees shall also formulate and implement state-of-the-art demand management schemes for automatic demand management like rotational load shedding, demand response (which may include lower tariff for interruptible loads) etc. before 01.01.2011, to reduce overdrawl in order to comply para 5.4.2 (a) and (b). A Report detailing the scheme and periodic reports on progress of implementation of the schemes shall be sent to the Central Commission by the concerned SLDC.
(e) In order to maintain the frequency within the stipulated band and maintaining the network security, the interruptible loads shall be arranged in four groups of loads, for scheduled power cuts/load shedding, loads for unscheduled load shedding, loads to be shed through under frequency relays/df/dt relays and loads to be shed under any System Protection Scheme identified at the RPC level. These loads shall be grouped in such a manner, that there is no overlapping between different Groups of loads. In case of certain contingencies and/or threat to system security, the RLDC may direct any SLDC/ SEB/distribution licensee or bulk consumer connected to the ISTS to decrease drawal of its control area by a certain quantum. Such directions shall immediately be acted upon. SLDC shall send compliance report immediately after compliance of these directions to RLDC.
(f) To comply with the direction of RLDC, SLDC may direct any SEB/distribution licensee/bulk consumer connected to the STU to curtail drawal from grid. SLDC shall monitor the action taken by the concerned entity and ensure the reduction of drawal from the grid as directed by RLDC.
(g) RLDCs shall devise standard, instantaneous, message formats in order to give directions in case of contingencies and /or threat to the system security to reduce overdrawl by the bulk consumer , SLDC/ State at different overdrawal conditions depending upon the severity of the overdrawal. The concerned SLDC shall ensure immediate compliance with these directions of RLDC and send a compliance report to the concerned RLDC.
(h) All Users, SLDC / SEB/distribution licensee or bulk consumer shall comply with direction of RLDC/SLDC and carry out requisite load shedding or backing down of generation in case of congestion in transmission system to ensure safety and reliability of the system. The procedure for application of measures to relieve congestion in real time as well as provisions of withdrawl of congestion shall be in accordance with Central Electricity Regulatory Commission (Measures to relieve congestion in real time operation) Regulations, 2009.
(i) The measures taken by the User's, SLDC SEB/distribution licensee or bulk consumer shall not be withdrawn as long as the frequency remains at a level lower than the limits specified in para 5.2 or congestion continues, unless specifically permitted by the RLDC/SLDC.
5.5. Periodic Reports.
(b) A daily report covering the performance of the regional grid shall be prepared by each RLDC based on the inputs received from SLDCs/Users and shall be put on its website. This report shall also cover the wind power generation and injection in to grid.
(c) A weekly report shall be put on its website by RLDC and shall cover the performance of the Regional grid for the previous week. Such weekly report shall also be available on the website of the RLDC concerned for at least 12 weeks.
(a) Frequency profile
(b) Voltage profile of important substations and sub-stations normally having low /high voltages
(c) Major Generation and Transmission Outages
(d) Transmission Constraints
(e) Instances of persistent/significant non-compliance of IEGC.
(f) Instances of congestion in transmission system
(g) Instances of inordinate delays in restoration of trans-mission elements and generating units
(h) Non-compliance of instructions of SLDC by SEB/distribution licenses/bulk consumers, to curtail drawal resulting in non-compliance of IEGC.
5.5.2 Other Reports.
(b) The RLDC shall also provide information/report to the RPC in the interest of smooth operation of ISTS.
5.6. Operational Liaison
5.6.1 Introduction.
(b) The Operational liaison function is a mandatory built-in hierarchical function of the NLDC, RLDC, SLDC and Users, to facilitate quick transfer of information to operational staff. It will correlate the required inputs for optimization of decision making and actions.
5.6.2 Procedure for Operational Liaison.
• Before any Operation is carried out on Regional grid, the RLDC will inform each User/SLDC/CTU, whose system may, or will, experience an operational effect, and give details of the operation to be carried out.
• Immediately following an event on Regional grid, the RLDC will inform each User/SLDC/CTU, whose system may, or will, experience an operational effect following the event, and give details of what has happened in the event.
• Any operation in a region having impact on other region(s) shall be intimated by the concerned RLDC to NLDC.
• Immediately following an event in the National / integrated Grid, NLDC would keep all RLDCs informed about such events.
(b) Operations and events on a User/STU/ system.
• Before any operation is carried out on a User/STU system, the User's/SLDC will inform the RLDC, in case the Regional grid may, or will, experience an Operational effect, and give details of the operation to be carried out. In case such operation is likely to have impact on other regions, the RLDC of those Regions shall also be informed through NLDC
• Immediately following an event on User's/STU system, the User's/SLDC will inform the RLDC, in case the Regional grid may, or will, experience an operational effect following the event, and give details of what has happened in the event but not the reasons why. In case such event is likely to have impact on other regions, the RLDCs of concerned those regions shall also be informed through NLDC.
• "Forced outages of important network elements in the grid shall be closely monitored at the RPC level. RPC shall send a monthly report of prolonged outage of generators or transmission facilities to the Commission.
5.7 Outage Planning
5.7.1 Introduction.
(b) The generation output and transmission system should be adequate after taking into account the outages to achieve the security standards.
(c) Annual outage plan shall be prepared in advance for the financial year by the RPC Secretariat in consultation with NLDC and RLDC and reviewed during the year on quarterly and Monthly basis. All,Users,CTU,STU etc shall follow these annual outage plans. If any deviation is required the same shall be with prior permission of concerned RPC and RLDC. The outage planning of run-of-the-river hydro plant, wind and solar power plant and its associated evacuation network shall be planned to extract maximum power from these renewable sources of energy. Outage of wind generator should be planned during lean wind season, outage of solar, if required during the rainy season and outage of run-of-the river hydro power plant in the lean water season.
5.7.2 Objective.
(b) To minimise surplus or deficits, if any, in the system requirement of power and energy and help operate system within Security Standards.
(c) To optimize the transmission outages of the elements of the National/Regional grid without adversely affecting the grid operation but taking into account the Generation Outage Schedule, outages of User/STU/CTU systems and maintaining system security standards.
5.7.3 Scope.
5.7.4 Outage Planning Process.
(b) All SEBs/STUs, transmission licensees, CTU, ISGS IPPs, MPPs and other generating stations shall provide RPC Secretariat their proposed outage programmes in writing for the next financial year by 30th November of each year. These shall contain identification of each generating unit/line/ICT, the preferred date for each outage and its duration and where there is flexibility, the earliest start date and latest finishing date.
(c) RPC Secretariat shall then come out with a draft outage programme for the next financial year by 31st December of each year for the Regional grid taking into account the available resources in an optimal manner and to maintain security standards. This will be done after carrying out necessary system studies and, if necessary, the outage programmes shall be rescheduled. Adequate balance between generation and load requirement shall be ensured while finalising outage programmes. The same shall be uploaded by the RPCs on their website.
(d) The outage plan shall be finalized in consultation with NLDC and RLDCs. The final outage plan shall be intimated to NLDC, Users, STUs, CTU, other generating stations connected to ISTS and the RLDC for implementation by 31st January of each year.
(e) The above annual outage plan shall be reviewed by RPC Secretariat on quarterly and monthly basis in coordination with all parties concerned, and adjustments made wherever found to be necessary.
(f) In case of emergency in the system, viz., loss of generation, break down of transmission line affecting the system, grid disturbances, system isolation, RLDC may conduct studies again before clearance of the planned outage.
(g) NLDC/RLDC are authorized to defer the planned outage in case of any of the following, taking into account the statutory requirements:
(i) grid disturbances
(ii) System isolation
(iii) Partial Black out in a state
(iv) Any other event in the system that may have an adverse impact on the system security by the proposed outage.
(h) The detailed generation and transmission outage programmes shall be based on the latest annual outage plan (with all adjustments made to date).
(i) Each User, CTU and STU shall obtain the final approval from RLDC prior to availing an outage.
(j) RPCs shall submit quarterly, half-yearly reports to the Commission indicating deviation in outages from the plan alongwith reasons. These reports shall also be put up on the RPC website.
5.8. Recovery Procedures.
(b) Detailed plans and procedures for restoration after partial/total blackout of each User's /STU / CTU system within a Region, will be finalized by the concerned User's/STU/CTU in coordination with the RLDC. The procedure will be reviewed, confirmed and/or revised once every subsequent year. Mock trial runs of the procedure for different subsystems shall be carried out by the Users/CTU/STU at least once every six months under intimation to the RLDC. Diesel Generator sets for black start would be tested on weekly basis and test report shall be sent to RLDC on quarterly basis.
(c) List of generating stations with black start facility, inter-State/ interregional ties, synchronizing points and essential loads to be restored on priority, shall be prepared and be available with NLDC, RLDC and SLDC.
(d) The RLDC is authorized during the restoration process following a black out, to operate with reduced security standards for voltage and frequency as necessary in order to achieve the fastest possible recovery of the grid.
(e) All communication channels required for restoration process shall be used for operational communication only, till grid normalcy is restored.
5.9. Event Information
5.9.1 Introduction.
5.9.2 Objective.
5.9.3 Scope.
5.9.4 Responsibility.
(b) All Users, STU,CTU and the SLDC shall be responsible for collection and reporting of all necessary data to NLDC,RLDC and RPC Secretariat for monitoring, reporting and event analysis as the case may be.
5.9.5 Reportable Events.
(i) Violation of security standards.
(ii) Grid indiscipline.
(iii) Non-compliance of RLDC's instructions.
(iv) System islanding/system split
(v) Regional black out/partial system black out
(vi) Protection failure on any element of ISTS, and on any item on the "agreed list" of the intra-State systems.
(vii) Power system instability viii) Tripping of any element of the Regional grid, ix) Sudden load rejection by any User
5.9.6 Reporting Procedure.
(b) Written Reporting of Events by RLDC to Users, STU,CTU and SLDC In the case of an event which was initially reported by RLDC to Users, STU, CTU SLDC, NLDC orally, the RLDC will give a written report to the Users, STU,CTU,SLDC,NLDC in accordance with this section.
(c) Form of Written Reports. - A written report shall be sent to NLDC, RLDC, a User, STU,CTU ,SLDC, as the case may be, in the reporting formats as devised by the appropriate load despatch Centre and will confirm the oral notification together with the following details of the event:
(i) Time and date of event
(ii) Location
(iii) Plant and/or Equipment directly involved
(iv) Description and cause of event
(v) Antecedent conditions of load and generation, including frequency, voltage and the flows in the affected area at the time of tripping including Weather Condition prior to the event
(vi) Duration of interruption and Demand and/or Generation (in MW and MWh) interrupted
(vii) All Relevant system data including copies of records of all recording instruments including Disturbance Recorder, Event Logger, DAS etc
(viii) Sequence of trippings with time.
(ix) Details of Relay Flags.
(x) Remedial measures.
Part 6
Scheduling and Despatch Code
Scheduling and Despatch Code
6.1. Introduction.
(a) Demarcation of responsibilities between various regional entities, SLDC, RLDC and NLDC in scheduling and despatch
(b) the procedure for scheduling and despatch
(c) the reactive power and voltage control mechanism
(d) Complementary commercial mechanisms (in the Annexure-1)
6.2. Objective.
6.3. Scope.
6.4. Demarcation of responsibilities.
(a) Central Generating Stations (excluding stations where full Share is allocated to host state),
(b) Ultra-Mega power projects
(c) In other cases, the control area shall be decided on the following criteria:
(i) If a generating station is connected only to the ISTS, RLDC shall coordinate the scheduling, except for Central Generating Stations where full Share is allocated to one State.
(ii) If a generating station is connected only to the State transmission network, the SLDC shall coordinate scheduling, except for the case as at (a) above.
(iii) If a generating station is connected both to ISTS and the State network, scheduling and other functions performed by the system operator of a control area will be done by SLDC, only if state has more than 50% Share of power. The role of concerned RLDC, in such a case, shall be limited to consideration of the schedule for inter state exchange of power on account of this ISGS while determining the net drawal schedules of the respective states. If the State has a Share of 50% or less, the scheduling and other functions shall be performed by RLDC.
(iv) In case commissioning of a plant is done in stages the decision regarding scheduling and other functions performed by the system operator of a control area would be taken on the basis of above criteria depending on generating capacity put into commercial operation at that point of time. Therefore it could happen that the plant may be in one control area (i.e. SLDC) at one point of time and another control area (i.e. RLDC) at another point of time. The switch over of control area would be done expeditiously after the change, w.e.f. the next billing period.
(i) scheduling/despatching their own generation (including generation of their embedded licensees),
(ii) regulating the demand of its control area,
(iii) scheduling their drawal from the ISGS (within their share in the respective plant's expected capability),
(iv) permitting long term access, medium term and short term open access transactions for embedded generators/consumers, in accordance with the contracts and
(v) regulating the net drawal of their control area from the regional grid in accordance with the respective regulations of the CERC.
6.5. Scheduling and Despatch procedure for long-term access, medium-term and short-term open access (to be read with provisions of Open Access Regulations 2008 as amended from time to time
Section 2 • The Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010
2. Definitions
the-central-electricity-regulatory-commission-indian-electricity-grid-code-regulations-2010-sec-2.json
•
Section 2
{
"act_title": "The Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2010",
"act_slug": "the-central-electricity-regulatory-commission-indian-electricity-grid-code-regulations-2010",
"section_label": "Section",
"section": {
"number": "2",
"title": "2. Definitions",
"chapter": null,
"content": "(a) \"Act\" means the Electricity Act, 2003 as amended from time to time;\n(b) \"Ancillary Services\" means in relation to power system (or grid) operation, the services necessary to support the power system (or grid) operation in maintaining power quality, reliability and security of the grid, eg. active power support for load following, reactive power support, black start, etc;\n(c) \"Automatic Voltage Regulator (AVR)\" means a continuously acting automatic excitation control system to control the voltage of a Generating Unit measured at the generator terminals;\n(d) \"Available Transfer Capability (ATC)\" means the transfer capability of the inter-control area transmission system available for scheduling commercial transactions (through long term access, medium term open access and short term open access) in a specific direction, taking into account the network security. Mathematically ATC is the Total Transfer Capability less Transmission Reliability Margin;\n(e) \"Beneficiary\" means a person who has a share in an ISGS\n(f) \"Bilateral Transaction\" means a transaction for exchange of energy (MWh) between a specified buyer and a specified seller, directly or through a trading licensee or discovered at Power Exchange through anonymous bidding, from a specified point of injection to a specified point of drawal for a fixed or varying quantum of power (MW) for any time period during a month;\n(g) \"Black Start Procedure\" means the procedure necessary to recover from a partial or a total blackout in the region;\n(h) \"BIS\" means the Bureau of Indian Standards;\n(i) \"Bulk Consumer\" means any Consumer who avails supply at voltage of 33 kV or above;\n(j) \"Capacitor\" means an electrical facility provided for generation of reactive power;\n(k) \"Central Generating Station\" means the generating stations owned by the companies owned or controlled by the Central Government;\n(l) \"Central Transmission Utility (CTU)\" means any Government company, which the Central Government may notify under sub-section (1) of Section 38 of the Act;\n(m) \"Collective Transaction\" means a set of transactions discovered in power exchange through anonymous, simultaneous competitive bidding by buyers and sellers;\n(n) \"Congestion\" means a situation where the demand for transmission capacity exceeds the Available Transfer Capability;\n(o) \"Connection Agreement\" means an Agreement between CTU, inter-state transmission licensee other than CTU (if any) and any person setting out the terms relating to a connection to and/or use of the Inter State Transmission System;\n(p) \"Connection Point\" means a point at which a Plant and/ or Apparatus connects to the Transmission /Distribution System;\n(q) \"Connectivity\" means the state of getting connected to the inter-State transmission system by a generating station, including a captive generating plant, a bulk consumer or an inter-State transmission licensee;\n(r) \"Control Area\" means an electrical system bounded by interconnections (tie lines), metering and telemetry which controls its generation and/or load to maintain its interchange schedule with other control areas whenever required to do so and contributes to frequency regulation of the synchronously operating system;\n(s) \"Demand\" means the demand of Active Power in MW and Reactive Power in MVAr of electricity unless otherwise specified;\n(t) \"Demand response\" means reduction in electricity usage by end customers from their normal consumption pattern, manually or automatically, in response to high UI charges being incurred by the State due to over drawal by the State at low frequency, or in response to congestion charges being incurred by the State for creating transmission congestion, or for alleviating a system contingency, for which such consumers could be given a financial incentive or lower tariff;\n(u) \"Despatch Schedule\" means the ex-power plant net MW and MWh output of a generating station, scheduled to be exported to the Grid from time to time;\n(v) \"Disturbance Recorder (DR)\" means a device provided to record the behaviour of the pre-selected digital and analog values of the system parameters during an Event;\n(w) \"Data Acquisition System (DAS)\" means a system provided to record the sequence of operation in time, of the relays/equipments as well as the measurement of pre-selected system parameters; (x) \"Drawal Schedule\" means the summation of the station-wise ex-power plant drawal schedules from all ISGS and drawal from/injection to regional grid consequent to other long term access, medium term and short term open access transactions; (y) \"DVC\" means the Damodar Valley Corporation established under sub-section (1) of Section 3 of the Damodar Valley Corporation Act, 1948; (z) \"Entitlement\" means a Share of a beneficiary (in MW / MWh) in the installed capacity/output capability of an ISGS; (aa) \"Event\" means an unscheduled or unplanned occurrence on a Grid including faults, incidents and breakdowns; (bb) \"Event Logging Facilities\" means a device provided to record the chronological sequence of operations, of the relays and other equipment; (cc) \"Ex-Power Plant\" means net MW/MWh output of a generating station, after deducting auxiliary consumption and transformation losses; (dd) \"Fault Locator (FL)\" means a device provided at the end of a transmission line to measure/ indicate the distance at which a line fault may have occurred; (ee) \"Flexible Alternating Current Transmission System (FACTS)\" means a power electronics based system and other static equipment that provide control of one or more AC transmission system parameters to enhance controllability and increase power transfer capability; (ff) \"Force Majeure\" means any event which is beyond the control of the persons involved which they could not foresee or with' a reasonable amount of diligence could not have foreseen or which could not be prevented and which substantially affects the performance by person such being the following including but not limited to - (a) Acts of God, natural phenomena, floods, droughts, earthquakes and epidemics; (b) Enemy acts of any Government domestic or foreign, war declared or undeclared, hostilities, priorities, quarantines, embargoes; (c) Riot or Civil Commotion; (d) Grid's failure not attributable to the person, (gg) \"Forced Outage\" means an outage of a Generating Unit or a transmission facility due to a fault or other reasons which has not been planned; (hh) \"Generating Company\" means any company or body corporate or association or body of individuals, whether incorporated or not, or artificial juridical person, which owns or operates or maintains a generating station, (ii) \"Generating Unit\" means an electrical Generating Unit coupled to a turbine within a Power Station together with all Plant and Apparatus at that Power Station which relates exclusively to the operation of that turbo-generator; (jj) \"Good Utility Practices\" means any of the practices, methods and acts engaged in or approved by a significant portion of the electric utility industry during the relevant time period which could have been expected to accomplish the desired results at a reasonable cost consistent with good business practices, reliably, safely and with expedition; (kk) \"Governor Droop\" means in relation to the operation of the governor of a Generating Unit, the percentage drop in system frequency which would cause the Generating Unit under restricted/free governor action to change its output from zero to full load; (ll) \"Grid Standards\" means the standards specified by the Authority under clause (d) of the Section 73 of the Act; (mm) \"Extra High Voltage (EHV)\" means where the voltage exceeds 33,000 volts under normal conditions, subject, however, to the percentage variation allowed by the Authority; (nn) \"Independent Power Producer (IPP)\" means a generating company not owned/ controlled by the Central/State Government; (oo) \"Indian Electricity Grid Code (IEGC) or Grid Code\" means these regulations specifying the philosophy and the responsibilities for planning and operation of Indian power system; (pp) \"Inter-State Generating Station (ISGS)\" means a Central generating station or other generating station, in which two or more states have Shares; (qq) \"Inter State Transmission System (ISTS)\" means (i) Any system for the conveyance of electricity by means of a main transmission line from the territory of one State to another State (ii) The conveyance of electricity across the territory of an intervening State as well as conveyance within the State which is incidental to such inter-state transmission of energy (iii) The transmission of electricity within the territory of State on a system built, owned, operated, maintained or controlled by CTU; (rr) \"Licensee\" means a person who has been granted a license under Section 14 of the Act; (ss) \"Load\" means the MW/MWh /MVAR/MVARh consumed by a utility/ installation; (tt) \"Long -term Access\" means the right to use the inter-State transmission system for a period exceeding 12 years but not exceeding 25 years; (uu) \"Long-term customer\" means a person who has been granted long-term access and includes a person who has been allocated central sector generation that is electricity supply from a generating station owned or controlled by the Central Government; (vv) \"Maximum Continuous Rating (MCR)\" means the maximum continuous output in MW at the generator terminals guaranteed by the manufacturer at rated parameters; (ww) \"Medium-term Open Access\" means the right to use the interstate transmission system for a period exceeding 3 months but not exceeding 3 years; (xx) \"Medium-term customer\" means a person who has been granted medium-term open access: (yy) \"National Grid\" means the entire inter-connected electric power network of the country; (zz) \"Net Drawal Schedule\" means the drawal schedule of a Regional Entity after deducting the apportioned transmission losses (estimated); (aaa) \"NLDC\" means the Centre established under sub-section (1) of Section 26 of the Act; (bbb) \"Operation\" means a scheduled or planned action relating to the operation of a System; (ccc) \"Operation Coordination Sub-Committee (OCC)\" means a sub-committee of RPC with members from all the regional entities which decides the operational aspects of the Regional Grid; (ddd) \"Operating range\" means the operating range of frequency and voltage as specified under the operating code (Part-5); (eee) \"Pool Account\" means regional account for (i) payments regarding unscheduled-interchanges (UI Account) or (ii) reactive energy exchanges (Reactive Energy Account) (iii) Congestion Charge (iv) Renewable Regulatory charge, as the case may be; (fff) \"Powergrid\" means Power Grid Corporation of India Limited which has been notified as CTU. (ggg) \"Power Exchange\" means the power exchange which has been granted registration in accordance with CERC (Power Market Regulations), 2010 as amended from time to time; (hhh) \"Power System\" means all aspects of generation, transmission, distribution and supply of electricity and includes one or more of the following, namely: (a) generating stations; (b) transmission or main transmission lines; (c) sub-stations; (d) tie-lines; (e) load despatch activities; (f) mains or distribution mains; (g) electric supply lines; (h) overhead lines; (i) service lines; (j) works; (iii) \"Protection Coordination Sub-Committee\" means a sub-committee of RPC with members from all the regional entities which decide on the protection aspects of the Regional Grid; (jjj) \"Reactor\" means an electrical facility specifically designed to absorb Reactive Power; (kkk) \"Regional Entity\" means such persons who are in the RLDC control area and whose metering and energy accounting is done at the regional level; (lll) \"Regional Power Committee (RPC)\" means a Committee established by resolution by the Central Government for a specific region for facilitating the integrated operation of the power systems in that region; (mmm) \"RPC Secretariat\" means the Secretariat of the RPC. (nnn) \"Regional Energy Account (REA)\" means a regional energy account prepared on monthly basis by the RPC Secretariat for the billing and settlement of 'Capacity Charge', 'Energy Charge' and transmission charges; (ooo) \"Regional Grid\" means the entire synchronously connected electric power network of the concerned Region; (ppp) \"Regional Load Despatch Centre (RLDC)\" means the Centre established under sub-section (1) of Section 27 of the Act; (qqq) \"Share\" means percentage share of a beneficiary in an ISGS either notified by Government of India or agreed through contracts and implemented through long term access; (rrr) \"Short-term Open Access\" means open access for a period up to one (1) month at one time; (sss) \"Spinning Reserve\" means part loaded generating capacity with some reserve margin that is synchronized to the system and is ready to provide increased generation at short notice pursuant to despatch instruction or instantaneously in response to a frequency drop; (ttt) \"Standing Committee for Transmission Planning\" means a Committee constituted by the CEA to discuss, review and finalise the proposals for expansion or modification in the ISTS and associated intra-state systems; (uuu) \"SEB\" means State Electricity Board which term includes State Electricity Department; (vvv) \"SERC\" means State Electricity Regulatory Commission (www) \"State Load Despatch Centre (SLDC)\" means the Centre established under subsection (1) of Section 31 of the Act; (xxx) \"State Transmission Utility (STU)\" means the Board or the Government Company specified as such by the State Government under sub-section (1) of Section 39 of the Act; (yyy) \"Static VAR Compensator (SVC)\" means an electrical facility designed for the purpose of generating or absorbing Reactive Power; (zzz) \"Technical Coordination Committee (TCC)\" means the committee set up by RPC to coordinate the technical and commercial aspects of the operation of the regional grid; (aaaa) \"Time Block\" means block of 15 minutes each for which Special Energy Meters record values of specified electrical parameters with first time block starting at 00.00 Hrs; (bbbb) \"Total Transfer Capability (TTC)\" means the amount of electric power that can be transferred reliably over the inter-control area transmission system under a given set of operating conditions considering the effect of occurrence of the worst credible contingency; (cccc) \"Transmission License\" means a License granted under Section 14 of the Act to transmit electricity; (dddd) \"Transmission Planning Criteria\" means the policy, standards and guidelines issued by the CEA for the planning and design of the Transmission system; (eeee) \"Transmission Reliability Margin (TRM)\" means the amount of margin kept in the total transfer capability necessary to ensure that the interconnected transmission network is secure under a reasonable range of uncertainties in system conditions; (ffff) \"Unscheduled Interchange (UI)\" means in a time block for a generating station or a seller means its total actual generation minus its total scheduled generation and for a beneficiary or buyer means its total actual drawal minus its total scheduled drawal; (gggg) \"User\" means a person such as a Generating Company including Captive Generating Plant or Transmission Licensee (other than the Central Transmission Utility and State Transmission utility) or Distribution Licensee or Bulk Consumer, whose electrical plant is connected to the ISTS at a voltage level 33kV and above; (2) Words and expressions used in these regulations and not defined herein but defined in the Act shall have the meaning assigned to them under the Act. Part 1 General 1.1 Introduction - The Indian Power System is a conglomeration of a number of agencies. Power system means all aspects of generation, transmission, distribution and supply of electricity and includes one or more of the following, namely :- (a) generating stations; (b) transmission or main transmission lines; (c) sub-stations; (d) tie-lines; (e) load despatch activities; (f) mains or distribution mains; (g) electric supply-lines; (h) overhead lines; (i) service lines; (j) works; 1.2. Objective. - The IEGC brings together a single set of technical and commercial rules, encompassing all the Utilities connected to/or using the inter-State transmission system (ISTS) and provides the following: • Documentation of the principles and procedures which define the relationship between the various Users of the inter-State transmission system (ISTS), National Load Despatch Centre, as well as the Regional and State Load Despatch Centers • Facilitation of the optimal operation of the grid, facilitation of coordinated and optimal maintenance planning of generation and transmission facilities in the grid and facilitation of development and planning of economic and reliable National / Regional Grid • Facilitation for functioning of power markets and ancillary services by defining a common basis of operation of the ISTS, applicable to all the Users of the ISTS. • Facilitation of the development of renewable energy sources by specifying the technical and commercial aspects for integration of these resources into the grid. 1.3. Scope. - (i) All Users, SLDCs, RLDCs, NLDC, CEA, CTU, STUs, licensees, RPCs and Power Exchanges are required to abide by the principles and procedures defined in the IEGC in so far as they apply to that party. (ii) For the purpose of the IEGC, the Damodar Valley Corporation (DVC) will be treated similar to a SEB, in view of the fact that DVC is a vertically integrated utility like a SEB and has its own generation, transmission and distribution in the identified command area. Accordingly Central Load< Despatch at Maithon shall perform functions of SLDC envisaged in this code for the area of DVC. (iii) For the purpose of the IEGC, the generating stations of the Bhakra Beas Management Board (BBMB) and Sardar Sarovar Project (SSP) shall be treated as intra-State generating stations, though their transmission systems shall be a part of the ISTS. This is because of the fact that only some of the States of Northern Region/ Western Region have a Share in BBMB/ SSP, and their generating units have to be scheduled and despatched in a very special manner (in coordination with the irrigational requirements). The scheduling and despatch of the BBMB/ SSP generation shall continue to be the responsibility of the BBMB/ Narmada Control Authority (NCA), with a proviso that it shall be duly coordinated with the respective Regional Load Despatch Centre and the beneficiaries. (iv) Any neighbouring country inter-connected with Indian (National) Grid shall be treated as a separate control area. 1.4. Structure of the IEGC. - This IEGC contains the following:\n(x) \"Drawal Schedule\" means the summation of the station-wise ex-power plant drawal schedules from all ISGS and drawal from/injection to regional grid consequent to other long term access, medium term and short term open access transactions; (y) \"DVC\" means the Damodar Valley Corporation established under sub-section (1) of Section 3 of the Damodar Valley Corporation Act, 1948; (z) \"Entitlement\" means a Share of a beneficiary (in MW / MWh) in the installed capacity/output capability of an ISGS; (aa) \"Event\" means an unscheduled or unplanned occurrence on a Grid including faults, incidents and breakdowns; (bb) \"Event Logging Facilities\" means a device provided to record the chronological sequence of operations, of the relays and other equipment; (cc) \"Ex-Power Plant\" means net MW/MWh output of a generating station, after deducting auxiliary consumption and transformation losses; (dd) \"Fault Locator (FL)\" means a device provided at the end of a transmission line to measure/ indicate the distance at which a line fault may have occurred; (ee) \"Flexible Alternating Current Transmission System (FACTS)\" means a power electronics based system and other static equipment that provide control of one or more AC transmission system parameters to enhance controllability and increase power transfer capability; (ff) \"Force Majeure\" means any event which is beyond the control of the persons involved which they could not foresee or with' a reasonable amount of diligence could not have foreseen or which could not be prevented and which substantially affects the performance by person such being the following including but not limited to - (a) Acts of God, natural phenomena, floods, droughts, earthquakes and epidemics; (b) Enemy acts of any Government domestic or foreign, war declared or undeclared, hostilities, priorities, quarantines, embargoes; (c) Riot or Civil Commotion; (d) Grid's failure not attributable to the person, (gg) \"Forced Outage\" means an outage of a Generating Unit or a transmission facility due to a fault or other reasons which has not been planned; (hh) \"Generating Company\" means any company or body corporate or association or body of individuals, whether incorporated or not, or artificial juridical person, which owns or operates or maintains a generating station, (ii) \"Generating Unit\" means an electrical Generating Unit coupled to a turbine within a Power Station together with all Plant and Apparatus at that Power Station which relates exclusively to the operation of that turbo-generator; (jj) \"Good Utility Practices\" means any of the practices, methods and acts engaged in or approved by a significant portion of the electric utility industry during the relevant time period which could have been expected to accomplish the desired results at a reasonable cost consistent with good business practices, reliably, safely and with expedition; (kk) \"Governor Droop\" means in relation to the operation of the governor of a Generating Unit, the percentage drop in system frequency which would cause the Generating Unit under restricted/free governor action to change its output from zero to full load; (ll) \"Grid Standards\" means the standards specified by the Authority under clause (d) of the Section 73 of the Act; (mm) \"Extra High Voltage (EHV)\" means where the voltage exceeds 33,000 volts under normal conditions, subject, however, to the percentage variation allowed by the Authority; (nn) \"Independent Power Producer (IPP)\" means a generating company not owned/ controlled by the Central/State Government; (oo) \"Indian Electricity Grid Code (IEGC) or Grid Code\" means these regulations specifying the philosophy and the responsibilities for planning and operation of Indian power system; (pp) \"Inter-State Generating Station (ISGS)\" means a Central generating station or other generating station, in which two or more states have Shares; (qq) \"Inter State Transmission System (ISTS)\" means (i) Any system for the conveyance of electricity by means of a main transmission line from the territory of one State to another State (ii) The conveyance of electricity across the territory of an intervening State as well as conveyance within the State which is incidental to such inter-state transmission of energy (iii) The transmission of electricity within the territory of State on a system built, owned, operated, maintained or controlled by CTU; (rr) \"Licensee\" means a person who has been granted a license under Section 14 of the Act; (ss) \"Load\" means the MW/MWh /MVAR/MVARh consumed by a utility/ installation; (tt) \"Long -term Access\" means the right to use the inter-State transmission system for a period exceeding 12 years but not exceeding 25 years; (uu) \"Long-term customer\" means a person who has been granted long-term access and includes a person who has been allocated central sector generation that is electricity supply from a generating station owned or controlled by the Central Government; (vv) \"Maximum Continuous Rating (MCR)\" means the maximum continuous output in MW at the generator terminals guaranteed by the manufacturer at rated parameters; (ww) \"Medium-term Open Access\" means the right to use the interstate transmission system for a period exceeding 3 months but not exceeding 3 years; (xx) \"Medium-term customer\" means a person who has been granted medium-term open access: (yy) \"National Grid\" means the entire inter-connected electric power network of the country; (zz) \"Net Drawal Schedule\" means the drawal schedule of a Regional Entity after deducting the apportioned transmission losses (estimated); (aaa) \"NLDC\" means the Centre established under sub-section (1) of Section 26 of the Act; (bbb) \"Operation\" means a scheduled or planned action relating to the operation of a System; (ccc) \"Operation Coordination Sub-Committee (OCC)\" means a sub-committee of RPC with members from all the regional entities which decides the operational aspects of the Regional Grid; (ddd) \"Operating range\" means the operating range of frequency and voltage as specified under the operating code (Part-5); (eee) \"Pool Account\" means regional account for (i) payments regarding unscheduled-interchanges (UI Account) or (ii) reactive energy exchanges (Reactive Energy Account) (iii) Congestion Charge (iv) Renewable Regulatory charge, as the case may be; (fff) \"Powergrid\" means Power Grid Corporation of India Limited which has been notified as CTU. (ggg) \"Power Exchange\" means the power exchange which has been granted registration in accordance with CERC (Power Market Regulations), 2010 as amended from time to time; (hhh) \"Power System\" means all aspects of generation, transmission, distribution and supply of electricity and includes one or more of the following, namely: (a) generating stations; (b) transmission or main transmission lines; (c) sub-stations; (d) tie-lines; (e) load despatch activities; (f) mains or distribution mains; (g) electric supply lines; (h) overhead lines; (i) service lines; (j) works; (iii) \"Protection Coordination Sub-Committee\" means a sub-committee of RPC with members from all the regional entities which decide on the protection aspects of the Regional Grid; (jjj) \"Reactor\" means an electrical facility specifically designed to absorb Reactive Power; (kkk) \"Regional Entity\" means such persons who are in the RLDC control area and whose metering and energy accounting is done at the regional level; (lll) \"Regional Power Committee (RPC)\" means a Committee established by resolution by the Central Government for a specific region for facilitating the integrated operation of the power systems in that region; (mmm) \"RPC Secretariat\" means the Secretariat of the RPC. (nnn) \"Regional Energy Account (REA)\" means a regional energy account prepared on monthly basis by the RPC Secretariat for the billing and settlement of 'Capacity Charge', 'Energy Charge' and transmission charges; (ooo) \"Regional Grid\" means the entire synchronously connected electric power network of the concerned Region; (ppp) \"Regional Load Despatch Centre (RLDC)\" means the Centre established under sub-section (1) of Section 27 of the Act; (qqq) \"Share\" means percentage share of a beneficiary in an ISGS either notified by Government of India or agreed through contracts and implemented through long term access; (rrr) \"Short-term Open Access\" means open access for a period up to one (1) month at one time; (sss) \"Spinning Reserve\" means part loaded generating capacity with some reserve margin that is synchronized to the system and is ready to provide increased generation at short notice pursuant to despatch instruction or instantaneously in response to a frequency drop; (ttt) \"Standing Committee for Transmission Planning\" means a Committee constituted by the CEA to discuss, review and finalise the proposals for expansion or modification in the ISTS and associated intra-state systems; (uuu) \"SEB\" means State Electricity Board which term includes State Electricity Department; (vvv) \"SERC\" means State Electricity Regulatory Commission (www) \"State Load Despatch Centre (SLDC)\" means the Centre established under subsection (1) of Section 31 of the Act; (xxx) \"State Transmission Utility (STU)\" means the Board or the Government Company specified as such by the State Government under sub-section (1) of Section 39 of the Act; (yyy) \"Static VAR Compensator (SVC)\" means an electrical facility designed for the purpose of generating or absorbing Reactive Power; (zzz) \"Technical Coordination Committee (TCC)\" means the committee set up by RPC to coordinate the technical and commercial aspects of the operation of the regional grid; (aaaa) \"Time Block\" means block of 15 minutes each for which Special Energy Meters record values of specified electrical parameters with first time block starting at 00.00 Hrs; (bbbb) \"Total Transfer Capability (TTC)\" means the amount of electric power that can be transferred reliably over the inter-control area transmission system under a given set of operating conditions considering the effect of occurrence of the worst credible contingency; (cccc) \"Transmission License\" means a License granted under Section 14 of the Act to transmit electricity; (dddd) \"Transmission Planning Criteria\" means the policy, standards and guidelines issued by the CEA for the planning and design of the Transmission system; (eeee) \"Transmission Reliability Margin (TRM)\" means the amount of margin kept in the total transfer capability necessary to ensure that the interconnected transmission network is secure under a reasonable range of uncertainties in system conditions; (ffff) \"Unscheduled Interchange (UI)\" means in a time block for a generating station or a seller means its total actual generation minus its total scheduled generation and for a beneficiary or buyer means its total actual drawal minus its total scheduled drawal; (gggg) \"User\" means a person such as a Generating Company including Captive Generating Plant or Transmission Licensee (other than the Central Transmission Utility and State Transmission utility) or Distribution Licensee or Bulk Consumer, whose electrical plant is connected to the ISTS at a voltage level 33kV and above; (2) Words and expressions used in these regulations and not defined herein but defined in the Act shall have the meaning assigned to them under the Act. Part 1 General 1.1 Introduction - The Indian Power System is a conglomeration of a number of agencies. Power system means all aspects of generation, transmission, distribution and supply of electricity and includes one or more of the following, namely :- (a) generating stations; (b) transmission or main transmission lines; (c) sub-stations; (d) tie-lines; (e) load despatch activities; (f) mains or distribution mains; (g) electric supply-lines; (h) overhead lines; (i) service lines; (j) works; 1.2. Objective. - The IEGC brings together a single set of technical and commercial rules, encompassing all the Utilities connected to/or using the inter-State transmission system (ISTS) and provides the following: • Documentation of the principles and procedures which define the relationship between the various Users of the inter-State transmission system (ISTS), National Load Despatch Centre, as well as the Regional and State Load Despatch Centers • Facilitation of the optimal operation of the grid, facilitation of coordinated and optimal maintenance planning of generation and transmission facilities in the grid and facilitation of development and planning of economic and reliable National / Regional Grid • Facilitation for functioning of power markets and ancillary services by defining a common basis of operation of the ISTS, applicable to all the Users of the ISTS. • Facilitation of the development of renewable energy sources by specifying the technical and commercial aspects for integration of these resources into the grid. 1.3. Scope. - (i) All Users, SLDCs, RLDCs, NLDC, CEA, CTU, STUs, licensees, RPCs and Power Exchanges are required to abide by the principles and procedures defined in the IEGC in so far as they apply to that party.\n(y) \"DVC\" means the Damodar Valley Corporation established under sub-section (1) of Section 3 of the Damodar Valley Corporation Act, 1948;\n(z) \"Entitlement\" means a Share of a beneficiary (in MW / MWh) in the installed capacity/output capability of an ISGS;\n(aa) \"Event\" means an unscheduled or unplanned occurrence on a Grid including faults, incidents and breakdowns;\n(bb) \"Event Logging Facilities\" means a device provided to record the chronological sequence of operations, of the relays and other equipment;\n(cc) \"Ex-Power Plant\" means net MW/MWh output of a generating station, after deducting auxiliary consumption and transformation losses;\n(dd) \"Fault Locator (FL)\" means a device provided at the end of a transmission line to measure/ indicate the distance at which a line fault may have occurred; (ee) \"Flexible Alternating Current Transmission System (FACTS)\" means a power electronics based system and other static equipment that provide control of one or more AC transmission system parameters to enhance controllability and increase power transfer capability; (ff) \"Force Majeure\" means any event which is beyond the control of the persons involved which they could not foresee or with' a reasonable amount of diligence could not have foreseen or which could not be prevented and which substantially affects the performance by person such being the following including but not limited to - (a) Acts of God, natural phenomena, floods, droughts, earthquakes and epidemics; (b) Enemy acts of any Government domestic or foreign, war declared or undeclared, hostilities, priorities, quarantines, embargoes; (c) Riot or Civil Commotion; (d) Grid's failure not attributable to the person, (gg) \"Forced Outage\" means an outage of a Generating Unit or a transmission facility due to a fault or other reasons which has not been planned; (hh) \"Generating Company\" means any company or body corporate or association or body of individuals, whether incorporated or not, or artificial juridical person, which owns or operates or maintains a generating station, (ii) \"Generating Unit\" means an electrical Generating Unit coupled to a turbine within a Power Station together with all Plant and Apparatus at that Power Station which relates exclusively to the operation of that turbo-generator; (jj) \"Good Utility Practices\" means any of the practices, methods and acts engaged in or approved by a significant portion of the electric utility industry during the relevant time period which could have been expected to accomplish the desired results at a reasonable cost consistent with good business practices, reliably, safely and with expedition; (kk) \"Governor Droop\" means in relation to the operation of the governor of a Generating Unit, the percentage drop in system frequency which would cause the Generating Unit under restricted/free governor action to change its output from zero to full load; (ll) \"Grid Standards\" means the standards specified by the Authority under clause (d) of the Section 73 of the Act; (mm) \"Extra High Voltage (EHV)\" means where the voltage exceeds 33,000 volts under normal conditions, subject, however, to the percentage variation allowed by the Authority; (nn) \"Independent Power Producer (IPP)\" means a generating company not owned/ controlled by the Central/State Government; (oo) \"Indian Electricity Grid Code (IEGC) or Grid Code\" means these regulations specifying the philosophy and the responsibilities for planning and operation of Indian power system; (pp) \"Inter-State Generating Station (ISGS)\" means a Central generating station or other generating station, in which two or more states have Shares; (qq) \"Inter State Transmission System (ISTS)\" means (i) Any system for the conveyance of electricity by means of a main transmission line from the territory of one State to another State (ii) The conveyance of electricity across the territory of an intervening State as well as conveyance within the State which is incidental to such inter-state transmission of energy (iii) The transmission of electricity within the territory of State on a system built, owned, operated, maintained or controlled by CTU; (rr) \"Licensee\" means a person who has been granted a license under Section 14 of the Act; (ss) \"Load\" means the MW/MWh /MVAR/MVARh consumed by a utility/ installation; (tt) \"Long -term Access\" means the right to use the inter-State transmission system for a period exceeding 12 years but not exceeding 25 years; (uu) \"Long-term customer\" means a person who has been granted long-term access and includes a person who has been allocated central sector generation that is electricity supply from a generating station owned or controlled by the Central Government; (vv) \"Maximum Continuous Rating (MCR)\" means the maximum continuous output in MW at the generator terminals guaranteed by the manufacturer at rated parameters; (ww) \"Medium-term Open Access\" means the right to use the interstate transmission system for a period exceeding 3 months but not exceeding 3 years; (xx) \"Medium-term customer\" means a person who has been granted medium-term open access: (yy) \"National Grid\" means the entire inter-connected electric power network of the country; (zz) \"Net Drawal Schedule\" means the drawal schedule of a Regional Entity after deducting the apportioned transmission losses (estimated); (aaa) \"NLDC\" means the Centre established under sub-section (1) of Section 26 of the Act; (bbb) \"Operation\" means a scheduled or planned action relating to the operation of a System; (ccc) \"Operation Coordination Sub-Committee (OCC)\" means a sub-committee of RPC with members from all the regional entities which decides the operational aspects of the Regional Grid; (ddd) \"Operating range\" means the operating range of frequency and voltage as specified under the operating code (Part-5); (eee) \"Pool Account\" means regional account for (i) payments regarding unscheduled-interchanges (UI Account) or (ii) reactive energy exchanges (Reactive Energy Account) (iii) Congestion Charge (iv) Renewable Regulatory charge, as the case may be; (fff) \"Powergrid\" means Power Grid Corporation of India Limited which has been notified as CTU. (ggg) \"Power Exchange\" means the power exchange which has been granted registration in accordance with CERC (Power Market Regulations), 2010 as amended from time to time; (hhh) \"Power System\" means all aspects of generation, transmission, distribution and supply of electricity and includes one or more of the following, namely: (a) generating stations; (b) transmission or main transmission lines; (c) sub-stations; (d) tie-lines; (e) load despatch activities; (f) mains or distribution mains; (g) electric supply lines; (h) overhead lines; (i) service lines; (j) works; (iii) \"Protection Coordination Sub-Committee\" means a sub-committee of RPC with members from all the regional entities which decide on the protection aspects of the Regional Grid; (jjj) \"Reactor\" means an electrical facility specifically designed to absorb Reactive Power; (kkk) \"Regional Entity\" means such persons who are in the RLDC control area and whose metering and energy accounting is done at the regional level; (lll) \"Regional Power Committee (RPC)\" means a Committee established by resolution by the Central Government for a specific region for facilitating the integrated operation of the power systems in that region; (mmm) \"RPC Secretariat\" means the Secretariat of the RPC. (nnn) \"Regional Energy Account (REA)\" means a regional energy account prepared on monthly basis by the RPC Secretariat for the billing and settlement of 'Capacity Charge', 'Energy Charge' and transmission charges; (ooo) \"Regional Grid\" means the entire synchronously connected electric power network of the concerned Region; (ppp) \"Regional Load Despatch Centre (RLDC)\" means the Centre established under sub-section (1) of Section 27 of the Act; (qqq) \"Share\" means percentage share of a beneficiary in an ISGS either notified by Government of India or agreed through contracts and implemented through long term access; (rrr) \"Short-term Open Access\" means open access for a period up to one (1) month at one time; (sss) \"Spinning Reserve\" means part loaded generating capacity with some reserve margin that is synchronized to the system and is ready to provide increased generation at short notice pursuant to despatch instruction or instantaneously in response to a frequency drop; (ttt) \"Standing Committee for Transmission Planning\" means a Committee constituted by the CEA to discuss, review and finalise the proposals for expansion or modification in the ISTS and associated intra-state systems; (uuu) \"SEB\" means State Electricity Board which term includes State Electricity Department; (vvv) \"SERC\" means State Electricity Regulatory Commission (www) \"State Load Despatch Centre (SLDC)\" means the Centre established under subsection (1) of Section 31 of the Act; (xxx) \"State Transmission Utility (STU)\" means the Board or the Government Company specified as such by the State Government under sub-section (1) of Section 39 of the Act; (yyy) \"Static VAR Compensator (SVC)\" means an electrical facility designed for the purpose of generating or absorbing Reactive Power; (zzz) \"Technical Coordination Committee (TCC)\" means the committee set up by RPC to coordinate the technical and commercial aspects of the operation of the regional grid; (aaaa) \"Time Block\" means block of 15 minutes each for which Special Energy Meters record values of specified electrical parameters with first time block starting at 00.00 Hrs; (bbbb) \"Total Transfer Capability (TTC)\" means the amount of electric power that can be transferred reliably over the inter-control area transmission system under a given set of operating conditions considering the effect of occurrence of the worst credible contingency; (cccc) \"Transmission License\" means a License granted under Section 14 of the Act to transmit electricity; (dddd) \"Transmission Planning Criteria\" means the policy, standards and guidelines issued by the CEA for the planning and design of the Transmission system; (eeee) \"Transmission Reliability Margin (TRM)\" means the amount of margin kept in the total transfer capability necessary to ensure that the interconnected transmission network is secure under a reasonable range of uncertainties in system conditions; (ffff) \"Unscheduled Interchange (UI)\" means in a time block for a generating station or a seller means its total actual generation minus its total scheduled generation and for a beneficiary or buyer means its total actual drawal minus its total scheduled drawal; (gggg) \"User\" means a person such as a Generating Company including Captive Generating Plant or Transmission Licensee (other than the Central Transmission Utility and State Transmission utility) or Distribution Licensee or Bulk Consumer, whose electrical plant is connected to the ISTS at a voltage level 33kV and above; (2) Words and expressions used in these regulations and not defined herein but defined in the Act shall have the meaning assigned to them under the Act. Part 1 General 1.1 Introduction - The Indian Power System is a conglomeration of a number of agencies. Power system means all aspects of generation, transmission, distribution and supply of electricity and includes one or more of the following, namely :- (a) generating stations; (b) transmission or main transmission lines; (c) sub-stations; (d) tie-lines; (e) load despatch activities; (f) mains or distribution mains; (g) electric supply-lines; (h) overhead lines; (i) service lines; (j) works; 1.2. Objective. - The IEGC brings together a single set of technical and commercial rules, encompassing all the Utilities connected to/or using the inter-State transmission system (ISTS) and provides the following:\n(ee) \"Flexible Alternating Current Transmission System (FACTS)\" means a power electronics based system and other static equipment that provide control of one or more AC transmission system parameters to enhance controllability and increase power transfer capability;\n(ff) \"Force Majeure\" means any event which is beyond the control of the persons involved which they could not foresee or with' a reasonable amount of diligence could not have foreseen or which could not be prevented and which substantially affects the performance by person such being the following including but not limited to -\n(a) Acts of God, natural phenomena, floods, droughts, earthquakes and epidemics;\n(b) Enemy acts of any Government domestic or foreign, war declared or undeclared, hostilities, priorities, quarantines, embargoes;\n(c) Riot or Civil Commotion;\n(d) Grid's failure not attributable to the person,\n(gg) \"Forced Outage\" means an outage of a Generating Unit or a transmission facility due to a fault or other reasons which has not been planned;\n(hh) \"Generating Company\" means any company or body corporate or association or body of individuals, whether incorporated or not, or artificial juridical person, which owns or operates or maintains a generating station,\n(ii) \"Generating Unit\" means an electrical Generating Unit coupled to a turbine within a Power Station together with all Plant and Apparatus at that Power Station which relates exclusively to the operation of that turbo-generator;\n(jj) \"Good Utility Practices\" means any of the practices, methods and acts engaged in or approved by a significant portion of the electric utility industry during the relevant time period which could have been expected to accomplish the desired results at a reasonable cost consistent with good business practices, reliably, safely and with expedition;\n(kk) \"Governor Droop\" means in relation to the operation of the governor of a Generating Unit, the percentage drop in system frequency which would cause the Generating Unit under restricted/free governor action to change its output from zero to full load;\n(ll) \"Grid Standards\" means the standards specified by the Authority under clause (d) of the Section 73 of the Act;\n(mm) \"Extra High Voltage (EHV)\" means where the voltage exceeds 33,000 volts under normal conditions, subject, however, to the percentage variation allowed by the Authority; (nn) \"Independent Power Producer (IPP)\" means a generating company not owned/ controlled by the Central/State Government; (oo) \"Indian Electricity Grid Code (IEGC) or Grid Code\" means these regulations specifying the philosophy and the responsibilities for planning and operation of Indian power system; (pp) \"Inter-State Generating Station (ISGS)\" means a Central generating station or other generating station, in which two or more states have Shares; (qq) \"Inter State Transmission System (ISTS)\" means (i) Any system for the conveyance of electricity by means of a main transmission line from the territory of one State to another State (ii) The conveyance of electricity across the territory of an intervening State as well as conveyance within the State which is incidental to such inter-state transmission of energy (iii) The transmission of electricity within the territory of State on a system built, owned, operated, maintained or controlled by CTU; (rr) \"Licensee\" means a person who has been granted a license under Section 14 of the Act; (ss) \"Load\" means the MW/MWh /MVAR/MVARh consumed by a utility/ installation; (tt) \"Long -term Access\" means the right to use the inter-State transmission system for a period exceeding 12 years but not exceeding 25 years; (uu) \"Long-term customer\" means a person who has been granted long-term access and includes a person who has been allocated central sector generation that is electricity supply from a generating station owned or controlled by the Central Government; (vv) \"Maximum Continuous Rating (MCR)\" means the maximum continuous output in MW at the generator terminals guaranteed by the manufacturer at rated parameters; (ww) \"Medium-term Open Access\" means the right to use the interstate transmission system for a period exceeding 3 months but not exceeding 3 years; (xx) \"Medium-term customer\" means a person who has been granted medium-term open access: (yy) \"National Grid\" means the entire inter-connected electric power network of the country; (zz) \"Net Drawal Schedule\" means the drawal schedule of a Regional Entity after deducting the apportioned transmission losses (estimated); (aaa) \"NLDC\" means the Centre established under sub-section (1) of Section 26 of the Act; (bbb) \"Operation\" means a scheduled or planned action relating to the operation of a System; (ccc) \"Operation Coordination Sub-Committee (OCC)\" means a sub-committee of RPC with members from all the regional entities which decides the operational aspects of the Regional Grid; (ddd) \"Operating range\" means the operating range of frequency and voltage as specified under the operating code (Part-5); (eee) \"Pool Account\" means regional account for (i) payments regarding unscheduled-interchanges (UI Account) or (ii) reactive energy exchanges (Reactive Energy Account) (iii) Congestion Charge (iv) Renewable Regulatory charge, as the case may be; (fff) \"Powergrid\" means Power Grid Corporation of India Limited which has been notified as CTU. (ggg) \"Power Exchange\" means the power exchange which has been granted registration in accordance with CERC (Power Market Regulations), 2010 as amended from time to time; (hhh) \"Power System\" means all aspects of generation, transmission, distribution and supply of electricity and includes one or more of the following, namely: (a) generating stations; (b) transmission or main transmission lines; (c) sub-stations; (d) tie-lines; (e) load despatch activities; (f) mains or distribution mains; (g) electric supply lines; (h) overhead lines; (i) service lines; (j) works; (iii) \"Protection Coordination Sub-Committee\" means a sub-committee of RPC with members from all the regional entities which decide on the protection aspects of the Regional Grid; (jjj) \"Reactor\" means an electrical facility specifically designed to absorb Reactive Power; (kkk) \"Regional Entity\" means such persons who are in the RLDC control area and whose metering and energy accounting is done at the regional level; (lll) \"Regional Power Committee (RPC)\" means a Committee established by resolution by the Central Government for a specific region for facilitating the integrated operation of the power systems in that region; (mmm) \"RPC Secretariat\" means the Secretariat of the RPC. (nnn) \"Regional Energy Account (REA)\" means a regional energy account prepared on monthly basis by the RPC Secretariat for the billing and settlement of 'Capacity Charge', 'Energy Charge' and transmission charges; (ooo) \"Regional Grid\" means the entire synchronously connected electric power network of the concerned Region; (ppp) \"Regional Load Despatch Centre (RLDC)\" means the Centre established under sub-section (1) of Section 27 of the Act; (qqq) \"Share\" means percentage share of a beneficiary in an ISGS either notified by Government of India or agreed through contracts and implemented through long term access; (rrr) \"Short-term Open Access\" means open access for a period up to one (1) month at one time; (sss) \"Spinning Reserve\" means part loaded generating capacity with some reserve margin that is synchronized to the system and is ready to provide increased generation at short notice pursuant to despatch instruction or instantaneously in response to a frequency drop; (ttt) \"Standing Committee for Transmission Planning\" means a Committee constituted by the CEA to discuss, review and finalise the proposals for expansion or modification in the ISTS and associated intra-state systems; (uuu) \"SEB\" means State Electricity Board which term includes State Electricity Department; (vvv) \"SERC\" means State Electricity Regulatory Commission (www) \"State Load Despatch Centre (SLDC)\" means the Centre established under subsection (1) of Section 31 of the Act; (xxx) \"State Transmission Utility (STU)\" means the Board or the Government Company specified as such by the State Government under sub-section (1) of Section 39 of the Act; (yyy) \"Static VAR Compensator (SVC)\" means an electrical facility designed for the purpose of generating or absorbing Reactive Power; (zzz) \"Technical Coordination Committee (TCC)\" means the committee set up by RPC to coordinate the technical and commercial aspects of the operation of the regional grid; (aaaa) \"Time Block\" means block of 15 minutes each for which Special Energy Meters record values of specified electrical parameters with first time block starting at 00.00 Hrs; (bbbb) \"Total Transfer Capability (TTC)\" means the amount of electric power that can be transferred reliably over the inter-control area transmission system under a given set of operating conditions considering the effect of occurrence of the worst credible contingency; (cccc) \"Transmission License\" means a License granted under Section 14 of the Act to transmit electricity; (dddd) \"Transmission Planning Criteria\" means the policy, standards and guidelines issued by the CEA for the planning and design of the Transmission system; (eeee) \"Transmission Reliability Margin (TRM)\" means the amount of margin kept in the total transfer capability necessary to ensure that the interconnected transmission network is secure under a reasonable range of uncertainties in system conditions; (ffff) \"Unscheduled Interchange (UI)\" means in a time block for a generating station or a seller means its total actual generation minus its total scheduled generation and for a beneficiary or buyer means its total actual drawal minus its total scheduled drawal; (gggg) \"User\" means a person such as a Generating Company including Captive Generating Plant or Transmission Licensee (other than the Central Transmission Utility and State Transmission utility) or Distribution Licensee or Bulk Consumer, whose electrical plant is connected to the ISTS at a voltage level 33kV and above; (2) Words and expressions used in these regulations and not defined herein but defined in the Act shall have the meaning assigned to them under the Act. Part 1 General 1.1 Introduction - The Indian Power System is a conglomeration of a number of agencies. Power system means all aspects of generation, transmission, distribution and supply of electricity and includes one or more of the following, namely :-\n(nn) \"Independent Power Producer (IPP)\" means a generating company not owned/ controlled by the Central/State Government;\n(oo) \"Indian Electricity Grid Code (IEGC) or Grid Code\" means these regulations specifying the philosophy and the responsibilities for planning and operation of Indian power system;\n(pp) \"Inter-State Generating Station (ISGS)\" means a Central generating station or other generating station, in which two or more states have Shares;\n(qq) \"Inter State Transmission System (ISTS)\" means\n(i) Any system for the conveyance of electricity by means of a main transmission line from the territory of one State to another State\n(ii) The conveyance of electricity across the territory of an intervening State as well as conveyance within the State which is incidental to such inter-state transmission of energy\n(iii) The transmission of electricity within the territory of State on a system built, owned, operated, maintained or controlled by CTU;\n(rr) \"Licensee\" means a person who has been granted a license under Section 14 of the Act;\n(ss) \"Load\" means the MW/MWh /MVAR/MVARh consumed by a utility/ installation;\n(tt) \"Long -term Access\" means the right to use the inter-State transmission system for a period exceeding 12 years but not exceeding 25 years;\n(uu) \"Long-term customer\" means a person who has been granted long-term access and includes a person who has been allocated central sector generation that is electricity supply from a generating station owned or controlled by the Central Government;\n(vv) \"Maximum Continuous Rating (MCR)\" means the maximum continuous output in MW at the generator terminals guaranteed by the manufacturer at rated parameters;\n(ww) \"Medium-term Open Access\" means the right to use the interstate transmission system for a period exceeding 3 months but not exceeding 3 years;\n(xx) \"Medium-term customer\" means a person who has been granted medium-term open access:\n(yy) \"National Grid\" means the entire inter-connected electric power network of the country;\n(zz) \"Net Drawal Schedule\" means the drawal schedule of a Regional Entity after deducting the apportioned transmission losses (estimated);\n(aaa) \"NLDC\" means the Centre established under sub-section (1) of Section 26 of the Act;\n(bbb) \"Operation\" means a scheduled or planned action relating to the operation of a System;\n(ccc) \"Operation Coordination Sub-Committee (OCC)\" means a sub-committee of RPC with members from all the regional entities which decides the operational aspects of the Regional Grid;\n(ddd) \"Operating range\" means the operating range of frequency and voltage as specified under the operating code (Part-5);\n(eee) \"Pool Account\" means regional account for (i) payments regarding unscheduled-interchanges (UI Account) or (ii) reactive energy exchanges (Reactive Energy Account) (iii) Congestion Charge (iv) Renewable Regulatory charge, as the case may be;\n(fff) \"Powergrid\" means Power Grid Corporation of India Limited which has been notified as CTU.\n(ggg) \"Power Exchange\" means the power exchange which has been granted registration in accordance with CERC (Power Market Regulations), 2010 as amended from time to time;\n(hhh) \"Power System\" means all aspects of generation, transmission, distribution and supply of electricity and includes one or more of the following, namely:\n(a) generating stations;\n(b) transmission or main transmission lines;\n(c) sub-stations;\n(d) tie-lines;\n(e) load despatch activities;\n(f) mains or distribution mains;\n(g) electric supply lines;\n(h) overhead lines;\n(i) service lines;\n(j) works;\n(iii) \"Protection Coordination Sub-Committee\" means a sub-committee of RPC with members from all the regional entities which decide on the protection aspects of the Regional Grid;\n(jjj) \"Reactor\" means an electrical facility specifically designed to absorb Reactive Power;\n(kkk) \"Regional Entity\" means such persons who are in the RLDC control area and whose metering and energy accounting is done at the regional level;\n(lll) \"Regional Power Committee (RPC)\" means a Committee established by resolution by the Central Government for a specific region for facilitating the integrated operation of the power systems in that region; (mmm) \"RPC Secretariat\" means the Secretariat of the RPC. (nnn) \"Regional Energy Account (REA)\" means a regional energy account prepared on monthly basis by the RPC Secretariat for the billing and settlement of 'Capacity Charge', 'Energy Charge' and transmission charges; (ooo) \"Regional Grid\" means the entire synchronously connected electric power network of the concerned Region; (ppp) \"Regional Load Despatch Centre (RLDC)\" means the Centre established under sub-section (1) of Section 27 of the Act; (qqq) \"Share\" means percentage share of a beneficiary in an ISGS either notified by Government of India or agreed through contracts and implemented through long term access; (rrr) \"Short-term Open Access\" means open access for a period up to one (1) month at one time; (sss) \"Spinning Reserve\" means part loaded generating capacity with some reserve margin that is synchronized to the system and is ready to provide increased generation at short notice pursuant to despatch instruction or instantaneously in response to a frequency drop; (ttt) \"Standing Committee for Transmission Planning\" means a Committee constituted by the CEA to discuss, review and finalise the proposals for expansion or modification in the ISTS and associated intra-state systems; (uuu) \"SEB\" means State Electricity Board which term includes State Electricity Department; (vvv) \"SERC\" means State Electricity Regulatory Commission (www) \"State Load Despatch Centre (SLDC)\" means the Centre established under subsection (1) of Section 31 of the Act; (xxx) \"State Transmission Utility (STU)\" means the Board or the Government Company specified as such by the State Government under sub-section (1) of Section 39 of the Act; (yyy) \"Static VAR Compensator (SVC)\" means an electrical facility designed for the purpose of generating or absorbing Reactive Power; (zzz) \"Technical Coordination Committee (TCC)\" means the committee set up by RPC to coordinate the technical and commercial aspects of the operation of the regional grid; (aaaa) \"Time Block\" means block of 15 minutes each for which Special Energy Meters record values of specified electrical parameters with first time block starting at 00.00 Hrs; (bbbb) \"Total Transfer Capability (TTC)\" means the amount of electric power that can be transferred reliably over the inter-control area transmission system under a given set of operating conditions considering the effect of occurrence of the worst credible contingency; (cccc) \"Transmission License\" means a License granted under Section 14 of the Act to transmit electricity; (dddd) \"Transmission Planning Criteria\" means the policy, standards and guidelines issued by the CEA for the planning and design of the Transmission system; (eeee) \"Transmission Reliability Margin (TRM)\" means the amount of margin kept in the total transfer capability necessary to ensure that the interconnected transmission network is secure under a reasonable range of uncertainties in system conditions; (ffff) \"Unscheduled Interchange (UI)\" means in a time block for a generating station or a seller means its total actual generation minus its total scheduled generation and for a beneficiary or buyer means its total actual drawal minus its total scheduled drawal; (gggg) \"User\" means a person such as a Generating Company including Captive Generating Plant or Transmission Licensee (other than the Central Transmission Utility and State Transmission utility) or Distribution Licensee or Bulk Consumer, whose electrical plant is connected to the ISTS at a voltage level 33kV and above; (2) Words and expressions used in these regulations and not defined herein but defined in the Act shall have the meaning assigned to them under the Act.\n(mmm) \"RPC Secretariat\" means the Secretariat of the RPC.\n(nnn) \"Regional Energy Account (REA)\" means a regional energy account prepared on monthly basis by the RPC Secretariat for the billing and settlement of 'Capacity Charge', 'Energy Charge' and transmission charges;\n(ooo) \"Regional Grid\" means the entire synchronously connected electric power network of the concerned Region;\n(ppp) \"Regional Load Despatch Centre (RLDC)\" means the Centre established under sub-section (1) of Section 27 of the Act;\n(qqq) \"Share\" means percentage share of a beneficiary in an ISGS either notified by Government of India or agreed through contracts and implemented through long term access;\n(rrr) \"Short-term Open Access\" means open access for a period up to one (1) month at one time;\n(sss) \"Spinning Reserve\" means part loaded generating capacity with some reserve margin that is synchronized to the system and is ready to provide increased generation at short notice pursuant to despatch instruction or instantaneously in response to a frequency drop;\n(ttt) \"Standing Committee for Transmission Planning\" means a Committee constituted by the CEA to discuss, review and finalise the proposals for expansion or modification in the ISTS and associated intra-state systems;\n(uuu) \"SEB\" means State Electricity Board which term includes State Electricity Department;\n(vvv) \"SERC\" means State Electricity Regulatory Commission\n(www) \"State Load Despatch Centre (SLDC)\" means the Centre established under subsection (1) of Section 31 of the Act;\n(xxx) \"State Transmission Utility (STU)\" means the Board or the Government Company specified as such by the State Government under sub-section (1) of Section 39 of the Act;\n(yyy) \"Static VAR Compensator (SVC)\" means an electrical facility designed for the purpose of generating or absorbing Reactive Power;\n(zzz) \"Technical Coordination Committee (TCC)\" means the committee set up by RPC to coordinate the technical and commercial aspects of the operation of the regional grid;\n(aaaa) \"Time Block\" means block of 15 minutes each for which Special Energy Meters record values of specified electrical parameters with first time block starting at 00.00 Hrs;\n(bbbb) \"Total Transfer Capability (TTC)\" means the amount of electric power that can be transferred reliably over the inter-control area transmission system under a given set of operating conditions considering the effect of occurrence of the worst credible contingency;\n(cccc) \"Transmission License\" means a License granted under Section 14 of the Act to transmit electricity;\n(dddd) \"Transmission Planning Criteria\" means the policy, standards and guidelines issued by the CEA for the planning and design of the Transmission system;\n(eeee) \"Transmission Reliability Margin (TRM)\" means the amount of margin kept in the total transfer capability necessary to ensure that the interconnected transmission network is secure under a reasonable range of uncertainties in system conditions;\n(ffff) \"Unscheduled Interchange (UI)\" means in a time block for a generating station or a seller means its total actual generation minus its total scheduled generation and for a beneficiary or buyer means its total actual drawal minus its total scheduled drawal;\n(gggg) \"User\" means a person such as a Generating Company including Captive Generating Plant or Transmission Licensee (other than the Central Transmission Utility and State Transmission utility) or Distribution Licensee or Bulk Consumer, whose electrical plant is connected to the ISTS at a voltage level 33kV and above;\nPart 1\nGeneral\n1.1 Introduction\n(a) generating stations;\n(b) transmission or main transmission lines;\n(c) sub-stations;\n(d) tie-lines;\n(e) load despatch activities;\n(f) mains or distribution mains;\n(g) electric supply-lines;\n(h) overhead lines;\n(i) service lines;\n(j) works;\n1.2. Objective.\n• Documentation of the principles and procedures which define the relationship between the various Users of the inter-State transmission system (ISTS), National Load Despatch Centre, as well as the Regional and State Load Despatch Centers\n• Facilitation of the optimal operation of the grid, facilitation of coordinated and optimal maintenance planning of generation and transmission facilities in the grid and facilitation of development and planning of economic and reliable National / Regional Grid\n• Facilitation for functioning of power markets and ancillary services by defining a common basis of operation of the ISTS, applicable to all the Users of the ISTS.\n• Facilitation of the development of renewable energy sources by specifying the technical and commercial aspects for integration of these resources into the grid.\n1.3. Scope.\n(ii) For the purpose of the IEGC, the Damodar Valley Corporation (DVC) will be treated similar to a SEB, in view of the fact that DVC is a vertically integrated utility like a SEB and has its own generation, transmission and distribution in the identified command area. Accordingly Central Load< Despatch at Maithon shall perform functions of SLDC envisaged in this code for the area of DVC.\n(iii) For the purpose of the IEGC, the generating stations of the Bhakra Beas Management Board (BBMB) and Sardar Sarovar Project (SSP) shall be treated as intra-State generating stations, though their transmission systems shall be a part of the ISTS. This is because of the fact that only some of the States of Northern Region/ Western Region have a Share in BBMB/ SSP, and their generating units have to be scheduled and despatched in a very special manner (in coordination with the irrigational requirements). The scheduling and despatch of the BBMB/ SSP generation shall continue to be the responsibility of the BBMB/ Narmada Control Authority (NCA), with a proviso that it shall be duly coordinated with the respective Regional Load Despatch Centre and the beneficiaries.\n(iv) Any neighbouring country inter-connected with Indian (National) Grid shall be treated as a separate control area.\n1.4. Structure of the IEGC.\n(i) Part 2: Role of various Organizations and their linkages. - This Part defines the functions of the various Organizations as are relevant to IEGC.\n(i) Part 2: Role of various Organizations and their linkages.\n(ii) Part 3:Planning Code for inter-State transmission. - This Part provides the guidelines to be adopted in the planning and development of bulk power transfer and associated ISTS. The Planning Code lays out the detailed information exchange required between the planning agencies and the various participants of the power system for load forecasting, generation availability, and power system planning etc. for the future years under study. The Planning Code stipulates the various criteria to be adopted during the planning process.\n(ii) Part 3:Planning Code for inter-State transmission.\n(iii) Part 4: Connection Code. - This Part specifies minimum technical and design criteria to be complied with by STU, CTU and any User connected to the system or seeking connection to the ISTS, to maintain uniformity and quality across the system. This also includes procedure for connection to the ISIS\n(iii) Part 4: Connection Code.\n(iv) Part 5: Operating Code. - This Part describes the operational philosophy to maintain efficient, secure and reliable Grid Operation and contains the following sections.\n(iv) Part 5: Operating Code.\n(a) Operating Philosophy\n(b) System security aspects. - This section describes the general security aspects to be followed by generating companies and all Regional Entities, CTU, STU, and all other Users of the Grid.\n(c) Demand Estimation for operational purposes. - This section details the procedures to estimate the demand by the SEB/distribution licensees for their systems / SLDCs in their control area for the day/week/month/year ahead, which shall be used for operational planning.\n(d) Demand management. - This section identifies the methodology to be adopted for demand control by each SEB/SLDC/Distribution Licensee/bulk consumer depending on, over drawal by the entity, frequency, voltage and transmission congestion and any other requirement of grid security.\n(e) Periodic Reports. - This section provides various provisions for reporting of the operating parameters of the grid such as frequency profile etc.\n(f) Operational liaison. - This section sets out the requirement for the exchange of information in relation to normal operation and/or events in the grid.\n(g) Outage Planning. - This section indicates procedure for outage planning.\n(h) Recovery procedures. - This section contains the procedures to be adopted following a major grid disturbance, for black start and resynchronization of islands, etc.\n(i) Event Information. - This section indicates the procedure by which events are reported and the related information exchange requirements etc.\n(v) Part 6: Scheduling and Despatch Code. - This section deals with the procedure to be adopted for scheduling and Despatch of generation of the Inter-State Generating Stations (ISGS) and scheduling for other transactions through long-term access, medium-term and short-term open access including comple-mentary commercial mechanisms, on a day-ahead and intra-day basis with the process of the flow of information between the ISGS, National Load Despatch Centre (NLDC), Regional Load Despatch Centre (RLDC), Power Exchanges and the State Load Despatch Centres (SLDCs), and other concerned persons.\n(v) Part 6: Scheduling and Despatch Code.\nMost of the wind and solar energy sources are presently connected and in future are likely to be connected to the STU or the State's distribution utility. However, keeping in view the variable nature of generation from such sources and the effect such variability has on the inter- state grid, and in view of the large-scale integration of such sources into the grid envisaged in view of the Government of India's thrust on renewable sources of energy, scheduling of wind and solar energy sources has been incorporated in.this Code.\n(vi) Part 7: Miscellaneous\n(vi) Part 7: Miscellaneous\n1.5. Compliance Oversight.\n(ii) The Regional Power Committee (RPC) in the region shall also continuously monitor the instances of non-compliance of the provisions of IEGC and try to sort out all operational issues and deliberate on the ways in which such cases of non-compliance are prevented in future by building consensus. The Member Secretary RPC may also report any issue that cannot be sorted out at the RPC forum to the Commission. The RPC shall also file monthly reports on status of UI payment and installation of capacitors by states vis-a-vis the requirement/targets, as decided in the RPC.\n(iii) The Commission may initiate appropriate proceedings upon receipt of report of RPCs or RLDCs referred to in (i) and (ii) above respectively.\n(iv) In case of non-compliance of any provisions of the IEGC by NLDC, RLDC, SLDC, RPC and any other person the matter may be reported by any person to the CERC through petition.\n(iv) Notwithstanding anything contained in these regulations, the Commission, may also take suo-motu action against any person, in case of non-compliance of any of the provisions of the IEGC.\nPart-2\nRole of Various Organizations and Their Linkages\n2.1. Introduction.\n2.2. Role of NLDC.\n(a) supervision over the Regional Load Despatch Centers.\n(b) scheduling and despatch of electricity over inter-regional links in accordance with Grid Standards specified by the Authority and Grid Code specified by Central Commission in coordination with Regional Load Despatch Centers.\n(c) coordination with Regional Load Despatch Centers for achieving maximum economy and efficiency in the operation of National Grid. ,\n(d) monitoring of operations and grid security of the National Grid.\n(e) supervision and control over the inter-regional links as shall be required for ensuring stability of the power system under its control.\n(f) coordination with Regional Power Committees for regional outage schedule in the national perspective to ensure optimal utilization of power resources.\n(g) coordination with Regional Load Despatch Centers for the energy accounting of inter-regional exchange of power.\n(h) coordination for restoration of synchronous operation of national grid with Regional Load Despatch Centers.\n(i) coordination for transnational exchange of power.\n(j) providing operational feed back for national grid planning to the Authority and the Central Transmission Utility.\n(k) levy and collection of such fee and charges from the generating companies or licensees involved in the power system, as shall be specified by the Central Commission.\n(l) dissemination of information relating to operations of transmission system in accordance with directions or regulations issued by Central Electricity Regulatory Commission and the Central Government from time to time.\"\n(i) NLDC shall be the nodal agency for collective transactions.\n(ii) NLDC would act as the Central control room in case of natural & man made emergency/disaster where it affects the power system operation.\n(iii) Any other function as may be assigned by the Commission by order or regulations from time to time.\n2.3. Role of RLDC.\n(1) The Regional Load Despatch Centre shall be the apex body to ensure integrated operation of the power system in the concerned region.\n(2) The Regional Load Despatch Centre shall comply with such principles, guidelines and methodologies in respect of wheeling and optimum scheduling and despatch of electricity as may be specified in the Grid Code.\n(3) The Regional Load Despatch Centre shall-\n(a) be responsible for optimum scheduling and despatch of electricity within the region, in accordance with the contracts entered into with the licensees or the generating companies operating in the region;\n(b) monitor grid operations;\n(c) keep accounts of quantity of electricity transmitted through the regional grid;\n(d) exercise supervision and control over the Inter-State transmission system; and\n(e) be responsible for carrying out real time operations for grid control and despatch of electricity within the region through secure and economic operation of the regional grid in accordance with the Grid Standards and the Grid Code.\n(4) The Regional Load Despatch Centre may give such directions and exercise such supervision and control as may be required for ensuring stability of grid operations and for achieving the maximum economy and efficiency in the operation of the power system in the region under its control.\n(5) Every licensee, generating company, generating station, substation and any other person connected with the operation-of the power system shall comply with the directions issued by the Regional Load Despatch Centers.\n(6) All directions issued by the Regional Load Despatch Centers to any transmission licensee of State transmission lines or any other licensee of the State or generating company (other than those connected to inter-State transmission system) or substation in the State shall be issued through the State Load Despatch Centre and the State Load Despatch Centers shall ensure that such directions are duly complied with by the licensee or generating company or sub-station.\n(7) If any dispute arises with reference to the quality of electricity or safe, secure and integrated operation of the regional grid or in relation to any direction given by the Regional Load Despatch Centre, it shall be referred to Central Commission for decision. However, pending the decision of the Central Commission, the directions of the Regional Load Despatch Centre shall be complied with by the State Load Despatch Centre or the licensee or the generating company, as the case may be.\n(a) System operation and control including inter-state transfer of power, covering contingency analysis and operational planning on real time basis;\n(b) Scheduling/ re-scheduling of generation;\n(c) System restoration following grid disturbances;\n(d) Metering and data collection;\n(e) Compiling and furnishing data pertaining to system operation;\n(f) Operation of regional UI pool account, regional reactive energy account and Congestion Charge Account, provided that such functions will be undertaken by any entity(ies) other than RLDCs if the Commission so directs.\n(g) Operation of ancillary services\n2.4. Role of RPC.\n(a) To undertake Regional Level operation analysis for improving grid performance.\n(b) To facilitate inter-state/inter-regional transfer of power.\n(c) To facilitate all functions of planning relating to inter-state/ intrastate transmission system with CTU/STU.\n(d) To coordinate planning of maintenance of generating machines of various generating companies of the region including those of interstate generating companies supplying electricity to the Region on annual basis and also to undertake review of maintenance programmed on monthly basis.\n(e) To undertake planning of outage of transmission system on annual / monthly basis.\n(f) To undertake operational planning studies including protection studies for stable operation of the grid.\n(g) To undertake planning for maintaining proper voltages through review of reactive compensation requirement through system study committee and monitoring of installed capacitors.\n(h) To evolve consensus on all issues relating to economy and efficiency in the operation of power system in the region.\n2.5. Role of CTU.\n(1) (a) to undertake transmission of electricity through inter-State transmission system;\n(b) to discharge all functions of planning and co-ordination relating to inter-State transmission system with (i) State Transmission Utilities (ii) Central Government; (iii) State Governments; (iv) Generating companies; (v) Regional Power Committees; (vi) Authority; (vii) Licensees; (viii) Any other person notified by the Central Government in this behalf;\n(c) to ensure development of an efficient, co-ordinated and economical system of inter-State transmission lines for smooth flow of electricity from generating stations lo the load centers;\n(d) to provide non-discriminatory open access to its transmission system for use by (i) any licensee or generating company on payment of the transmission charges; or (ii) any consumer and when such open access is provided by the State Commission under sub-section (2) of section 42 of the Act, on payment of the transmission charges and a surcharge thereon, as may be specified by the Central Commission.\n(2) Until a Government company or authority or corporation is notified by the Central Government, the Central Transmission Utility shall operate the Regional Load Despatch Centre.\n2.6. Role of CEA.\n(1) (i) CEA shall formulate short-term and perspective plans for development of the electricity system and co-ordinate the activities of the planning agencies for the optimal utilization of resources to subserve the interests of the national economy and to provide reliable and affordable electricity for all consumers.\n(ii) to specify the technical standards for construction of electrical plants, electric lines and connectivity to the grid;\n(iii) to specify the safety requirements for construction, operation and maintenance of electrical plants and electric lines;\n(iv) to specify the Grid Standards for operation and maintenance of transmission lines; and,\n(v) to specify the conditions for installation of meters for transmission and supply of electricity.\n(vi) to promote and assist in the timely completion of schemes and projects for improving and augmenting the electricity system;\n(vii) to collect and record the data concerning the generation, transmission, trading, distribution and utilisation of electricity and carry out studies relating to cost, efficiency, competitiveness and such like matters;\n(viii) to carry out, or cause to be carried out, any Investigation for the purposes of generating or transmitting or distributing electricity.\n2.7. Role of SLDC.\n(1) The State Load Despatch Centre shall be the apex body to ensure * integrated operation of the power system in a State.\n(2) The State Load Despatch Centre shall -\n(a) be responsible for optimum scheduling and despatch of electricity within a State, in accordance with the contracts entered into with the licensees or the generating companies operating in that State;\n(b) monitor grid operations;\n(c) keep accounts of the quantity of electricity transmitted ' through the State grid;\n(d) exercise supervision and control over the intra-State transmission system; and\n(e) be responsible for carrying out real time operations for grid control and despatch of electricity within the State through secure and economic operation of the State grid in accordance with the Grid Standards and the State Grid Code.\n2.8. Role of STU.\n(1) (a) to undertake transmission of electricity through intra-State transmission system;\n(b) to discharge all functions of planning and co-ordination relating to intra-state transmission system with (i) Central Transmission Utility; (ii) State Governments; (iii) generating companies; (iv) Regional Power Committees; (v) Authority; (vi) licensees; (vii) any other person notified by the State in this behalf;\n(c) to ensure development of an efficient, co-ordinated and economical system of intra-State transmission lines for smooth flow of electricity from a generating station to the load centers;\n(d) to provide non-discriminatory open access to its transmission system for use by -\n(i) any licensee or generating company on payment of the transmission charges; or\n(ii) any consumer as and when such open access is provided by the State Commission under sub-section (2) of section 42 of the Act, on payment of the transmission charges and a surcharge thereon, as may be specified by the State Commission.\n(2) Until a Government company or any authority or corporation is notified by the State Government, the State Transmission Utility shall operate the State Load Despatch Centre.\nPart 3\nPlanning Code for Inter-State Transmission\n3.1. Introduction.\n(ii) In accordance with Section 38(2)(d) of Electricity Act, 2003, the Central Transmission Utility (CTU) shall inter-alia provide non-discriminatory open access to its transmission system for use by\n(a) any licensee or generating company on payment of the transmission charges; or\n(b) any consumer as and when such open access is provided by the State Commission under sub-section (2) of Section 42, on payment of the transmission charges and a surcharge thereon, as may be specified by the Central Commission.\n(iii) Similarly, in accordance with Section 39(2)(b) of Electricity Act, 2003, the State Transmission Utilities (STUs) shall discharge all functions of planning and coordination relating to intra-State transmission system with Central Transmission Utility, State Governments, Generating Companies, Regional Power Committees, Central Electricity Authority (CEA), licensees and any other person notified by the State Government in this behalf.\n(iv) In accordance with Section 39(2)(d) of Electricity Act, 2003, the State Transmission Utility (STU) shall inter-alia provide non-discriminatory open access to its transmission system for use by -\n(a) any licensee or generating company on payment of the transmission charges; or\n(b) any consumer as and when such open access is provided by the State Commission under sub-section (2) of Section 42, on payment of the transmission charges and a surcharge thereon, as may be specified by the State Commission.\n(v) In accordance with Section 4C of Electricity Act, 2003, the transmission licensee shall inter-alia provide non-discriminatory open access to its transmission system for use by\n(a) any licensee or generating company on payment of the transmission charges; or\n(b) any consumer as and when such open access is provided by the State Commission under sub-section (2) of Section 42, on payment of the transmission charges and a surcharge thereon, as may be specified by the State Commission.\n(vi) In accordance with Section 3 (4) of Electricity Act, 2003, CEA shall inter-alia prepare a National Electricity Plan in accordance with the National Electricity Policy and notify such plan once in five (5) years. In accordance with Section 3 (5) of Electricity Act, 2003, CEA may review or revise the National Electricity Plan in accordance with the National Electricity Policy.\n(vii) In accordance with Section 73 (a) of Electricity Act, 2003, CEA is responsible to advise the Central Government on the matters relating to the National Electricity Policy, formulate short-term and perspective plans for development of the electricity system and co-ordinate the activities of planning agencies for optimal utilization of resources to sub-serve the interests of the national economy and to provide reliable and affordable electricity for all consumers.\n(viii) The Planning Code specifies the philosophy and procedures to be applied in planning of National Grid, Regional Grids and Inter Regional links.\n3.2 Objective.\n(a) To specify the principles, procedures and criteria which shall be used in the planning and development of the ISTS and inter regional links.\n(b) To promote co-ordination amongst all Users, STU,/SLDC and CTU/RLDC, NLDC, RPC and CEA in any proposed development of the ISTS.\n(c) To provide methodology and information exchange amongst Users, STU/SLDC and CTU/RLDC, RPC, NLDC and CEA in the * planning and development of the ISTS.\n3.3. Scope.\n3.4. Planning Philosophy.\n(b) The CTU shall carry out planning process from time to time as per the requirement for identification of inter-State transmission system including transmission system associated with Generation Projects, regional and inter-regional system strengthening schemes which shall fit in with the perspective plan developed by CEA. While planning schemes, the following shall be considered in addition to the data of authenticated nature collected from and in consultation with users by CTU:\n(i) Perspective plan formulated by CEA.\n(ii) Electric Power Survey of India published by the CEA.\n(iii) Transmission Planning Criteria and guidelines issued by the CEA\n(iv) Operational feedback from RPCs\n(v) Operational feedback from NLDC/RLDC/SLDC\n(vi) Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-state Transmission and related matters) Regulations, 2009.\n(vii) Renewable capacity addition plan issued by Ministry of New and Renewable Energy Sources (MNRES), Government of India\n(c) In addition to the inter-State transmission system, the CTU shall plan, from time to time, system strengthening schemes, need of which may arise to overcome the constraints in power transfer and to improve the overall performance of the grid. The interstate transmission proposals including system strengthening scheme identified on the basis of the planning studies would be discussed, reviewed and finalized in the meetings of Regional Standing Committees for Transmission Planning constituted by CEA, in consultation with the Regional Entities, RPC, CEA, NLDC and the RLDC and action may be taken by CTU on the basis of Power Purchase Agreements (PPAs) signed with the beneficiaries. In case of associated transmission system where all PPAs have not yet been signed, and where agreement could not be reached in respect of system strengthening schemes, the CTU may approach CERC for the regulatory approval in accordance with Central Electricity Regulatory Commission (Grant of Regulatory Approval for Capital Investment to CTU for execution of Inter-State Transmission Scheme) Regulations, as and when they come into force.\n(d) All, STUs and Users will supply to the CTU, the desired planning data from time to time to enable to formulate and finalize its plan.\n(e) As voltage management plays an important role in inter-state transmission of energy, special attention shall be accorded, by CTU, for planning of capacitors, reactors, SVC and Flexible Alternating Current Transmission Systems (FACTS), etc. Similar exercise shall be done by STU for intra-State transmission system to optimize the utilistion of the integrated transmission network.\n(f) Based on Plans prepared by the CTU, State Transmission Utilities (STU) shall have to plan their systems to further evacuate power from the ISTS and to optimize the use of integrated transmission network.\n(g) In case Long Term Access Applications require any strengthening in the intra-State transmission system to absorb/evacuate power beyond ISTS, the applicant shall coordinate with the concerned STU.STU shall augment the intra-state transmission system in a reasonable time to facilitate the interchange of such power.\n(h) The Inter-State Transmission System and associated intra-State transmission system are complementary and inter-dependent and planning of one affects the other's planning and performance. Therefore, the associated intra-State transmission system shall also be discussed and reviewed before implementation during the discussion for finalizing ISTS proposal indicated at 3.4 (b) above.\n3.5. Planning Criterion General Philosophy.\n(i) As a general rule, the ISTS shall be capable of withstanding and be secured against the following contingency outages a. without necessitating load shedding or rescheduling of generation during Steady State Operation:\n- Outage of a 132 kV D/C line or,\n- Outage of a 220 kV D/C line or,\n- Outage of a 400 kV S/C line or,\n- Outage of single Interconnecting Transformer, or\n- Outage of one pole of HVDC Bipole line, or one pole of HVDC back to back Station or\n- Outage of 765 kV S/C line\n(b) without necessitating load shedding but could be with rescheduling of generation during steady state operation-\n- Outage of a 400 kV S/C line with TCSC, or\n- Outage of a 400kV D/C line, or\n- Outage of both pole of HVDC Bipole line or both poles of HVDC back to back Station or\n- Outage of a 765kV S/C line with series compensation.\n(ii) The above contingencies shall be considered assuming a pre-contingency system depletion (Planned outage) of another 220 kV D/C line or 400 kV S/C line in another corridor and not emanating from the same substation. The planning study would assume that all the Generating Units operate within their reactive capability curves and the network voltage profile are also maintained within voltage limits specified.\n(c) The ISTS shall be capable of withstanding the loss of most severe single system in feed without loss of stability.\n(d) Any one of these events defined above shall not cause:\n(i) Loss of supply\n(ii) Prolonged operation of the system frequency below and above specified limits.\n(iii) Unacceptable high or low voltage\n(iv) System instability\n(v) Unacceptable overloading of ISTS elements.\n(e) In all substations (132 kV and above), at least two transformers shall be provided.\n(f) CTU shall carry out planning studies for Reactive Power compensation of ISTS including reactive power compensation requirement at the generator's /bulk consumer's switchyard and for connectivity of new generator/ bulk consumer to the ISTS in accordance with Central Electricity Regulatory Commission ( Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-state Transmission and related matters) Regulations, 2009.\n(g) Suitable System Protection Schemes may be planned by NLDC/RLDC in consultation with CEA, CTU, RPC and the Regional Entities, either for enhancing transfer capability or to take care of contingencies beyond that indicated in a(i) above\n3.6. Planning Data.\n3.7. Implementation of Transmission Plan.\nPart 4\nConnection Code\n4.1. Introduction.\n4.2. Objective.\n(a) To ensure the safe operation, integrity and reliability of the grid.\n(b) That the basic rules for connectivity are complied with in order to treat all users in a non-discriminatory manner.\n(c) Any new or modified connections, when established, shall neither suffer unacceptable effects due to its connectivity to the ISTS nor impose unacceptable effects on the system of any other connected User or STU.\n(d) Any person seeking a new connection to the grid is required to be aware, in advance, of the procedure for connectivity to the ISTS and also the standards and conditions his system has to meet for being integrated into the grid.\n4.3. Scope.\n4.4. Procedure for connection.\n4.5. Connection Agreement.\n4.6. Important Technical Requirements for Connectivity to the Grid\n4.6.1 Reactive Power Compensation.\n(b) The person already connected to the grid shall also provide additional reactive compensation as per the quantum and time frame decided by respective RPC in consultation with RLDC. The Users and STUs shall provide information to RPC and RLDC regarding the installation and healthiness of the reactive compensation equipment on regular basis. RPC shall regularly monitor the status in this regard.\n4.6.2 Data and Communication Facilities.\n4.6.3 System Recording Instruments.\n4.6.4 Responsibilities for safety.\n4.6.5 Cyber Security.\n4.7. International Connections to ISTS.\n4.8. Schedule of assets of Regional Grid.\nPart 5\nOperating Code\n5.1. Operating philosophy.\n(b) Overall operation of the National / inter-regional grid shall be supervised from the National Load Despatch Centre (NLDC). Operation of the Regional grid shall be supervised from the Regional Load Despatch Centre (RLDC). The roles of NLDC,RLDC, RPC and SLDC shall be in accordance with the provisions made in Part-2 of the IEGC.\n(c) All persons shall comply with this Operating Code, for deriving maximum benefits from the integrated operation and for equitable sharing of obligations.\n(d) All licensees, generating company, generating station and any other person connected with the operation power system shall comply with the directions issued by the respective RLDC /SLDC to ensure integrated grid operation and for achieving the maximum economy and efficiency in the operation of the power system.\n(e) A set of detailed operating procedures for the National grid shall be developed and maintained by the NLDC in consultation with the RLDCs, for guidance of the staff of the NLDC and it shall be consistent with IEGC to enable compliance with the requirement of this IEGC.\n(f) A set of detailed operating procedures for each regional grid shall be developed and maintained by the respective RLDC in consultation with the regional entities for guidance of the staff of RLDC. and shall be consistent with IEGC to enable compliance with the requirement of this IEGC.\n(g) A set of detailed operating procedures for each state grid shall be developed and maintained by the respective SLDC in consultation with the concerned persons for guidance of the staff of SLDC and shall be consistent with IEGC to facilitate compliance with the requirement of this IEGC.\n(h) The control rooms of the NLDC, RLDC, all SLDCs, power plants, substation of 132 kV and above, and any other control centers of all regional entities shall be manned round the clock by qualified and adequately trained personnel. Training requirements may be notified by the Commission from time to time, by orders.\n5.2. System Security Aspects.\n(b) No part of the grid shall be deliberately isolated from the rest of the National/Regional grid, except (i) under an emergency, and conditions in which such isolation would prevent a total grid collapse and/or would enable early restoration of power supply, (ii) for safety of human life (iii) when serious damage to a costly equipment is imminent and such isolation would prevent it, (iv) when such isolation is specifically instructed by RLDC. Complete synchronization of grid shall be restored as soon as the conditions again permit it. The restoration process shall be supervised by RLDC, in co-ordination with NLDC /SLDC in accordance with operating procedures separately formulated NLDC/RLDC.\n(c) No important element of the National/Regional grid shall be deliberately opened or removed from service at any time, except when specifically instructed by RLDC or with specific and prior clearance of RLDC. The list of such important grid elements on which the above stipulations apply shall be prepared by the RLDC in consultation with the concerned Users, CTU and STUs, and be available at the websites of NLDC/RLDC/SLDCs. In case of opening/removal of any important element of the grid under an emergency situation, the same shall be communicated to RLDC at the earliest possible time after the event. RLDC shall inform the opening/removal of the important elements of the regional grid, to NLDC, and to the concerned Regional Entities (whose grid would be affected by it) as specified in the detailed operating procedure by NLDC.\n(d) Any tripping, whether manual or automatic, of any of the above elements of Regional grid shall be precisely intimated by the concerned SLDC/CTU/User to RLDC as soon as possible, say within ten minutes of the event. The reason (to the extent determined) and the likely time of restoration shall also be intimated. All reasonable attempts shall be made for the elements' restoration as soon as possible. RLDC shall inform the tripping of the important elements of the regional grid, to NLDC, and to the concerned Regional Entities (whose grid would be affected by it) as specified in the detailed operating procedure by NLDC.\n(e) Any prolonged outage of power system elements of any User/CTU/STU, which is causing or likely to cause danger to the grid or sub-optimal operation of the grid shall regularly be monitored by RLDC. RLDC shall report such outages to RPC. RPC shall finalise action plan and give instructions to restore such elements in a specified time period.\n(f) All thermal generating units of 200 MW and above and all hydro units of 10 MW and above, which are synchronized with the grid, irrespective of their ownership, shall have their governors in operation at all times in accordance with the following provisions:\nGovernor Action\nGovernor Action\n(i) Following Thermal and hydro (except those with upto three hours pondage) generating units shall be operated under restricted governor mode of operation with effect from the date 'given below:\n(a) Thermal generating units of 200 MW and above,\n(1) Software based Electro Hydraulic Governor (EHG) system 01.08.2010\n(2) Hardware based EHG system 01.08.2010\n(b) Hydro units of 10 MW and above 01.08.2010\n(ii) The restricted governor mode of operation shall essentially have the following features:\n(a) There should not be any reduction in generation in case of improvement in grid frequency below 50.2 Hz. (for example if grid frequency changes from 49.3 to 49.4 Hz. then there shall not be any reduction in generation). Whereas for any fall in grid frequency, generation from the unit should increase by 5% limited to 105 % of the MCR of the unit subject to machine capability.\n(b) Ripple filter of +/- 0.03 Hz. shall be provided so that small changes in frequency are ignored for load correction, in order to prevent governor hunting.\n(c) If any of these generating units is required to be operated without its governor in operation as specified above, the RLDC shall be immediately advised about the reason and duration of such operation. All governors shall have a droop setting of between 3% and 6%.\n(d) After stablisation of frequency around 50 Hz, the CERC may review the above provision regarding the restricted governor mode of operation and free governor mode of operation may be introduced.\n(iii) All other generating units including the poundage up to 3 hours Gas turbine/Combined Cycle Power Plants, wind and solar generators and Nuclear Power Stations shall be exempted from Sections 5.2 (f) ,5.2 (g), 5.2 (h) and ,5.2(i) till the Commission reviews the situation.\n(g) Facilities available with/in load limiters, Automatic Turbine Runup System (ATRS), Turbine supervisory control, coordinated control system, etc., shall not be used to suppress the normal governor action in any manner and no dead bands and/or time delays shall be deliberately introduced except as specified in para 5.2(f) above.\n(h) All thermal generating units of 200 MW and above and all hydro units of 10 MW and above operating at or up to 100% of their Maximum Continuous Rating (MCR) shall normally be capable of (and shall not in any way be prevented from) instantaneously picking up to 105% and 110% of their MCR , respectively, when frequency falls suddenly. After an increase in generation as above, a generating unit may ramp back to the original level at a rate of about one percent (1%) per minute, in case continued operation at the increased level is not sustainable. Any generating unit not complying with the above requirements, shall be kept in operation (synchronized with the Regional grid) only after obtaining the permission of RLDC.\n(i) The recommended rate for changing the governor setting, i.e., supplementary control for increasing or decreasing the output (generation level) for all generating units, irrespective of their type and size, would be one (ID) per cent per minute or as per manufacturer's limits. However, if frequency falls below 49.7Hz, all partly loaded generating units shall pick up additional load at a faster rate, according to their capability.\n(j) Except under an emergency, or to prevent an imminent damage to a costly equipment, no User shall suddenly reduce his generating imit output by more than one hundred (100) MW (20 MW in case of NER) without prior intimation to and consent of the RLDC, particularly when frequency is falling or is below 49.5 Hz.. Similarly, no User / SEB shall cause a sudden variation in its load by more than one himdred (100 MW) without prior intimation to and consent of the RLDC.\n(k) All generating units shall normally have their automatic voltage regulators (AVRs) in operation. In particular, if a generating unit of over fifty (50) MW size is required to be operated without its AVR in service, the RLDC shall be immediately intimated about the reason and duration, and its permission obtained. Power System Stabilizers (PSS) in AVRs of generating units (wherever provided), shall be got properly tuned by the respective generating unit owner as per a plan prepared for the purpose by the CTU/RPC from time to time. CTU /RPC will be allowed to carry out checking of PSS and further tuning it, wherever considered necessary.\n(l) Provision of protections and relay settings shall be coordinated periodically throughout the Regional grid, as per a plan to be separately finalized by the Protection sub-Committee of the RPC.\n(m) All Users, SEB, SLDCs, RLDCs, and NLDC shall take all possible measures to ensure that the grid frequency always remains within the 49.5 - 50.2 Hz band.\n(n) All SEBS, distribution licensees / STUs shall provide automatic under-frequency and df/dt relays for load shedding in their respective systems, to arrest frequency decline that could result in a collapse/disintegration of the grid, as per the plan separately finalized by the concerned RPC and shall ensure its effective application to prevent cascade tripping of generating units in case of any contingency. All, SEBs, distribution licensees, CTU STUs and SLDCs shall ensure that the above under-frequency and df/dt load shedding/islanding schemes are always functional.RLDC shall inform RPC Secretariat about instances when the desired load relief is not obtained through these relays in real time operation. The provisions regarding under frequency and df/dt relays of relevant CEA Regulations shall be complied with. SLDC shall furnish monthly report of UFR and df/dt relay operation in their respective system to the respective RPC.\n(o) All Users, STU/SLDC, CTU/RLDC and NLDC, shall also facilitate ' identification, installation and commissioning of System Protection Schemes (SPS) (including inter-tripping and run-back) in the power system to operate the transmission system closer to their limits and to protect against situations such as voltage collapse and cascade tripping, tripping of important corridors/flow-gates etc.. Such schemes would be finalized by the concerned RPC forum, and shall always be kept in service.If any SPS is to be taken out of service, permission of RLDC shall be obtained indicating reason and duration of anticipated outage from service.\n(p) Procedures shall be developed to recover from partial / total collapse of the grid in accordance with CEA (Grid Standards)Regulations as and when the same comes into force and periodically update the same in accordance with the requirements given under section 5.8. These procedures shall be followed by all the Users , STU/SLDC and CTU,RLDC to ensure consistent, reliable and quick restoration.\n(q) Each User, STU, RLDC, NLDC and CTU shall provide and maintain adequate and reliable communication facility internally and with other Users/STUs /RLDC/SLDC to ensure exchange of data/information necessary to maintain reliability and security of the grid. Wherever possible, redundancy and alternate path shall be maintained for communication along important routes, e.g., SLDC to RLDC to NLDC.\n(r) All the Users , STU/SLDC and CTU shall send information/data including disturbance recorder/sequential event recorder output to RLDC within one week for purpose of analysis of any grid disturbance/event. No User,SLDC/STU or CTU shall block any data/information required by the RLDC and RPC for maintaining reliability and security of the grid and for analysis of an event.\n(s) All Users, RLDC, SLDC STUs, CTU and NLDC shall take all possible measures to ensure that the grid voltage always remains within the following operating range.\nVoltage - (kV rms)\nVoltage - (kV rms)\nNominal\nNominal\nMaximum\nMaximum\nMinimum\nMinimum\n765\n800\n728\n400\n420\n380\n220\n245\n198\n132\n145\n122\n110\n121\n99\n66\n72\n60\n33\n36\n30\n(t) All Users, CTU and STUs shall provide adequate voltage control measures through voltage relay as finalized by RPC, to prevent voltage collapse and shall ensure its effective application to prevent voltage collapse/cascade tripping.\n(u) Special requirements for Solar/ wind generators\n(i) SLDC/RLDC may direct a wind farm to curtail its VAr drawl/ injection in case the security of grid or safety of any equipment or personnel is endangered.\n(ii) During the wind generator start-up, the wind generator shall ensure that the reactive power drawl (inrush currents incase of induction generators) shall not affect the grid performance.\n5.3. Demand Estimation for Operational Purposes.\n(b) The demand estimation is to be done on daily/weekly/monthly /yearly basis for current year for load - generation balance planning. The SLDC shall carry out system studies for operational planning purposes using this demand estimate.\n(c) Each SLDC shall develop methodologies/mechanisms for daily/weekly/ monthly/yearly demand estimation (MW, MVAr and MWh) for operational purposes. Based on this demand estimate and the estimated availability from different sources, SLDC shall plan demand management measures like load shedding, power cuts, etc. and shall ensure that the same is implemented by the SEB/distribution licensees. SLDCs. All SEBs/distribution licensees shall abide by the demand management measures of the SLDCs and shall also maintain historical database for demand estimation.\n(d) Each SLDC shall carry out its own demand estimation from the historical data and weather forecast data from time to time. All distribution licensees and other concerned persons shall provide relevant data and other information as required by SLDC for demand estimate.\n(e) While the demand estimation for operational purposes is to be done on a daily/weekly/monthly basis initially, mechanisms and facilities at SLDCs shall be created at the earliest but not later than 1.1.2011 to facilitate on-line estimation of demand for daily operational use for each 15 minutes block.\n(f) The monthly estimated demand by the SLDC shall be provided to RLDC and RPC for better operation planning\n(g) The SLDC shall take into account the Wind Energy forecasting to meet the active and reactive power requirement.\n(h) In order to facilitate estimation of Total Transfer Capability /Available Transfer Capability on three month ahead basis, the SLDC shall furnish estimated demand and availability data to RLDCs.\n5.4. Demand Management.\n5.4.1 Introduction.\n5.4.2 Demand Disconnection.\n(b) The SLDC/ SEB/distribution licensee and bulk consumer shall ensure that requisite load shedding is carried out in its control area so that there is no overdrawl when frequency is 49.5 Hz. or below.\n(c) Each User/STU/SLDC shall formulate contingency procedures and make arrangements that will enable demand disconnection to take place, as instructed by the RLDC/SLDC, under normal and/or contingent conditions. These contingency procedures and arrangements shall regularly be / updated by User/STU and monitored by RLDC/SLDC. RLDC/SLDC may direct any User/STU to modify the above procedures/arrangement, if required, in the interest of grid security and the concerned User/STU shall abide by these directions.\n(d) The SLDC through respective State Electricity Boards/Distribution Licensees shall also formulate and implement state-of-the-art demand management schemes for automatic demand management like rotational load shedding, demand response (which may include lower tariff for interruptible loads) etc. before 01.01.2011, to reduce overdrawl in order to comply para 5.4.2 (a) and (b). A Report detailing the scheme and periodic reports on progress of implementation of the schemes shall be sent to the Central Commission by the concerned SLDC.\n(e) In order to maintain the frequency within the stipulated band and maintaining the network security, the interruptible loads shall be arranged in four groups of loads, for scheduled power cuts/load shedding, loads for unscheduled load shedding, loads to be shed through under frequency relays/df/dt relays and loads to be shed under any System Protection Scheme identified at the RPC level. These loads shall be grouped in such a manner, that there is no overlapping between different Groups of loads. In case of certain contingencies and/or threat to system security, the RLDC may direct any SLDC/ SEB/distribution licensee or bulk consumer connected to the ISTS to decrease drawal of its control area by a certain quantum. Such directions shall immediately be acted upon. SLDC shall send compliance report immediately after compliance of these directions to RLDC.\n(f) To comply with the direction of RLDC, SLDC may direct any SEB/distribution licensee/bulk consumer connected to the STU to curtail drawal from grid. SLDC shall monitor the action taken by the concerned entity and ensure the reduction of drawal from the grid as directed by RLDC.\n(g) RLDCs shall devise standard, instantaneous, message formats in order to give directions in case of contingencies and /or threat to the system security to reduce overdrawl by the bulk consumer , SLDC/ State at different overdrawal conditions depending upon the severity of the overdrawal. The concerned SLDC shall ensure immediate compliance with these directions of RLDC and send a compliance report to the concerned RLDC.\n(h) All Users, SLDC / SEB/distribution licensee or bulk consumer shall comply with direction of RLDC/SLDC and carry out requisite load shedding or backing down of generation in case of congestion in transmission system to ensure safety and reliability of the system. The procedure for application of measures to relieve congestion in real time as well as provisions of withdrawl of congestion shall be in accordance with Central Electricity Regulatory Commission (Measures to relieve congestion in real time operation) Regulations, 2009.\n(i) The measures taken by the User's, SLDC SEB/distribution licensee or bulk consumer shall not be withdrawn as long as the frequency remains at a level lower than the limits specified in para 5.2 or congestion continues, unless specifically permitted by the RLDC/SLDC.\n5.5. Periodic Reports.\n(b) A daily report covering the performance of the regional grid shall be prepared by each RLDC based on the inputs received from SLDCs/Users and shall be put on its website. This report shall also cover the wind power generation and injection in to grid.\n(c) A weekly report shall be put on its website by RLDC and shall cover the performance of the Regional grid for the previous week. Such weekly report shall also be available on the website of the RLDC concerned for at least 12 weeks.\n(a) Frequency profile\n(b) Voltage profile of important substations and sub-stations normally having low /high voltages\n(c) Major Generation and Transmission Outages\n(d) Transmission Constraints\n(e) Instances of persistent/significant non-compliance of IEGC.\n(f) Instances of congestion in transmission system\n(g) Instances of inordinate delays in restoration of trans-mission elements and generating units\n(h) Non-compliance of instructions of SLDC by SEB/distribution licenses/bulk consumers, to curtail drawal resulting in non-compliance of IEGC.\n5.5.2 Other Reports.\n(b) The RLDC shall also provide information/report to the RPC in the interest of smooth operation of ISTS.\n5.6. Operational Liaison\n5.6.1 Introduction.\n(b) The Operational liaison function is a mandatory built-in hierarchical function of the NLDC, RLDC, SLDC and Users, to facilitate quick transfer of information to operational staff. It will correlate the required inputs for optimization of decision making and actions.\n5.6.2 Procedure for Operational Liaison.\n• Before any Operation is carried out on Regional grid, the RLDC will inform each User/SLDC/CTU, whose system may, or will, experience an operational effect, and give details of the operation to be carried out.\n• Immediately following an event on Regional grid, the RLDC will inform each User/SLDC/CTU, whose system may, or will, experience an operational effect following the event, and give details of what has happened in the event.\n• Any operation in a region having impact on other region(s) shall be intimated by the concerned RLDC to NLDC.\n• Immediately following an event in the National / integrated Grid, NLDC would keep all RLDCs informed about such events.\n(b) Operations and events on a User/STU/ system.\n• Before any operation is carried out on a User/STU system, the User's/SLDC will inform the RLDC, in case the Regional grid may, or will, experience an Operational effect, and give details of the operation to be carried out. In case such operation is likely to have impact on other regions, the RLDC of those Regions shall also be informed through NLDC\n• Immediately following an event on User's/STU system, the User's/SLDC will inform the RLDC, in case the Regional grid may, or will, experience an operational effect following the event, and give details of what has happened in the event but not the reasons why. In case such event is likely to have impact on other regions, the RLDCs of concerned those regions shall also be informed through NLDC.\n• \"Forced outages of important network elements in the grid shall be closely monitored at the RPC level. RPC shall send a monthly report of prolonged outage of generators or transmission facilities to the Commission.\n5.7 Outage Planning\n5.7.1 Introduction.\n(b) The generation output and transmission system should be adequate after taking into account the outages to achieve the security standards.\n(c) Annual outage plan shall be prepared in advance for the financial year by the RPC Secretariat in consultation with NLDC and RLDC and reviewed during the year on quarterly and Monthly basis. All,Users,CTU,STU etc shall follow these annual outage plans. If any deviation is required the same shall be with prior permission of concerned RPC and RLDC. The outage planning of run-of-the-river hydro plant, wind and solar power plant and its associated evacuation network shall be planned to extract maximum power from these renewable sources of energy. Outage of wind generator should be planned during lean wind season, outage of solar, if required during the rainy season and outage of run-of-the river hydro power plant in the lean water season.\n5.7.2 Objective.\n(b) To minimise surplus or deficits, if any, in the system requirement of power and energy and help operate system within Security Standards.\n(c) To optimize the transmission outages of the elements of the National/Regional grid without adversely affecting the grid operation but taking into account the Generation Outage Schedule, outages of User/STU/CTU systems and maintaining system security standards.\n5.7.3 Scope.\n5.7.4 Outage Planning Process.\n(b) All SEBs/STUs, transmission licensees, CTU, ISGS IPPs, MPPs and other generating stations shall provide RPC Secretariat their proposed outage programmes in writing for the next financial year by 30th November of each year. These shall contain identification of each generating unit/line/ICT, the preferred date for each outage and its duration and where there is flexibility, the earliest start date and latest finishing date.\n(c) RPC Secretariat shall then come out with a draft outage programme for the next financial year by 31st December of each year for the Regional grid taking into account the available resources in an optimal manner and to maintain security standards. This will be done after carrying out necessary system studies and, if necessary, the outage programmes shall be rescheduled. Adequate balance between generation and load requirement shall be ensured while finalising outage programmes. The same shall be uploaded by the RPCs on their website.\n(d) The outage plan shall be finalized in consultation with NLDC and RLDCs. The final outage plan shall be intimated to NLDC, Users, STUs, CTU, other generating stations connected to ISTS and the RLDC for implementation by 31st January of each year.\n(e) The above annual outage plan shall be reviewed by RPC Secretariat on quarterly and monthly basis in coordination with all parties concerned, and adjustments made wherever found to be necessary.\n(f) In case of emergency in the system, viz., loss of generation, break down of transmission line affecting the system, grid disturbances, system isolation, RLDC may conduct studies again before clearance of the planned outage.\n(g) NLDC/RLDC are authorized to defer the planned outage in case of any of the following, taking into account the statutory requirements:\n(i) grid disturbances\n(ii) System isolation\n(iii) Partial Black out in a state\n(iv) Any other event in the system that may have an adverse impact on the system security by the proposed outage.\n(h) The detailed generation and transmission outage programmes shall be based on the latest annual outage plan (with all adjustments made to date).\n(i) Each User, CTU and STU shall obtain the final approval from RLDC prior to availing an outage.\n(j) RPCs shall submit quarterly, half-yearly reports to the Commission indicating deviation in outages from the plan alongwith reasons. These reports shall also be put up on the RPC website.\n5.8. Recovery Procedures.\n(b) Detailed plans and procedures for restoration after partial/total blackout of each User's /STU / CTU system within a Region, will be finalized by the concerned User's/STU/CTU in coordination with the RLDC. The procedure will be reviewed, confirmed and/or revised once every subsequent year. Mock trial runs of the procedure for different subsystems shall be carried out by the Users/CTU/STU at least once every six months under intimation to the RLDC. Diesel Generator sets for black start would be tested on weekly basis and test report shall be sent to RLDC on quarterly basis.\n(c) List of generating stations with black start facility, inter-State/ interregional ties, synchronizing points and essential loads to be restored on priority, shall be prepared and be available with NLDC, RLDC and SLDC.\n(d) The RLDC is authorized during the restoration process following a black out, to operate with reduced security standards for voltage and frequency as necessary in order to achieve the fastest possible recovery of the grid.\n(e) All communication channels required for restoration process shall be used for operational communication only, till grid normalcy is restored.\n5.9. Event Information\n5.9.1 Introduction.\n5.9.2 Objective.\n5.9.3 Scope.\n5.9.4 Responsibility.\n(b) All Users, STU,CTU and the SLDC shall be responsible for collection and reporting of all necessary data to NLDC,RLDC and RPC Secretariat for monitoring, reporting and event analysis as the case may be.\n5.9.5 Reportable Events.\n(i) Violation of security standards.\n(ii) Grid indiscipline.\n(iii) Non-compliance of RLDC's instructions.\n(iv) System islanding/system split\n(v) Regional black out/partial system black out\n(vi) Protection failure on any element of ISTS, and on any item on the \"agreed list\" of the intra-State systems.\n(vii) Power system instability viii) Tripping of any element of the Regional grid, ix) Sudden load rejection by any User\n5.9.6 Reporting Procedure.\n(b) Written Reporting of Events by RLDC to Users, STU,CTU and SLDC In the case of an event which was initially reported by RLDC to Users, STU, CTU SLDC, NLDC orally, the RLDC will give a written report to the Users, STU,CTU,SLDC,NLDC in accordance with this section.\n(c) Form of Written Reports. - A written report shall be sent to NLDC, RLDC, a User, STU,CTU ,SLDC, as the case may be, in the reporting formats as devised by the appropriate load despatch Centre and will confirm the oral notification together with the following details of the event:\n(i) Time and date of event\n(ii) Location\n(iii) Plant and/or Equipment directly involved\n(iv) Description and cause of event\n(v) Antecedent conditions of load and generation, including frequency, voltage and the flows in the affected area at the time of tripping including Weather Condition prior to the event\n(vi) Duration of interruption and Demand and/or Generation (in MW and MWh) interrupted\n(vii) All Relevant system data including copies of records of all recording instruments including Disturbance Recorder, Event Logger, DAS etc\n(viii) Sequence of trippings with time.\n(ix) Details of Relay Flags.\n(x) Remedial measures.\nPart 6\nScheduling and Despatch Code\nScheduling and Despatch Code\n6.1. Introduction.\n(a) Demarcation of responsibilities between various regional entities, SLDC, RLDC and NLDC in scheduling and despatch\n(b) the procedure for scheduling and despatch\n(c) the reactive power and voltage control mechanism\n(d) Complementary commercial mechanisms (in the Annexure-1)\n6.2. Objective.\n6.3. Scope.\n6.4. Demarcation of responsibilities.\n(a) Central Generating Stations (excluding stations where full Share is allocated to host state),\n(b) Ultra-Mega power projects\n(c) In other cases, the control area shall be decided on the following criteria:\n(i) If a generating station is connected only to the ISTS, RLDC shall coordinate the scheduling, except for Central Generating Stations where full Share is allocated to one State.\n(ii) If a generating station is connected only to the State transmission network, the SLDC shall coordinate scheduling, except for the case as at (a) above.\n(iii) If a generating station is connected both to ISTS and the State network, scheduling and other functions performed by the system operator of a control area will be done by SLDC, only if state has more than 50% Share of power. The role of concerned RLDC, in such a case, shall be limited to consideration of the schedule for inter state exchange of power on account of this ISGS while determining the net drawal schedules of the respective states. If the State has a Share of 50% or less, the scheduling and other functions shall be performed by RLDC.\n(iv) In case commissioning of a plant is done in stages the decision regarding scheduling and other functions performed by the system operator of a control area would be taken on the basis of above criteria depending on generating capacity put into commercial operation at that point of time. Therefore it could happen that the plant may be in one control area (i.e. SLDC) at one point of time and another control area (i.e. RLDC) at another point of time. The switch over of control area would be done expeditiously after the change, w.e.f. the next billing period.\n(i) scheduling/despatching their own generation (including generation of their embedded licensees),\n(ii) regulating the demand of its control area,\n(iii) scheduling their drawal from the ISGS (within their share in the respective plant's expected capability),\n(iv) permitting long term access, medium term and short term open access transactions for embedded generators/consumers, in accordance with the contracts and\n(v) regulating the net drawal of their control area from the regional grid in accordance with the respective regulations of the CERC.\n6.5. Scheduling and Despatch procedure for long-term access, medium-term and short-term open access (to be read with provisions of Open Access Regulations 2008 as amended from time to time",
"footnote": "",
"is_definition": true,
"sort_order": 1
},
"prev_section": "1",
"next_section": "1"
}