9.02. Maintenance of line.
(a) programme and arrange maintenance works during non-traffic hours after obtaining power block on third rail;
(b) see that his length of line or works in his charge is efficiently maintained;
(c) promptly report to the Engineer-in-Charge all accidents or defects in the way or works, which he considers likely to interfere with the safe running of trains, at the same time taking such action as may be necessary to prevent accidents, and
(d) co-ordinate with Signal Inspector so that CATC and other track equipments are not damaged or become defective while undertaking maintenance and repair works as required.
9.03. Keeping of materials.
9.04. Inspection of permanent way and works.
9.05. Works involving danger to trains or traffic.
9.06.
Emergency repairs to track and structure
(i) give order to stop train services over the affected sections;
(ii) inform the concerned Inspector of permanent way or works to proceed to the site of occurrence;
(iii) have the traction current on the affected portion switched off before the work is commenced;
(iv) resume train services over the affected section in accordance with special instructions after the concerned structure or track has been attended and certified fit by the competent engineering official not lower than the rank of Permanent Way Inspector in case of track work or Inspector of Works in case of structures.
(b) Work under conditions of impaired visibility - No rails shall be displaced and no other work which is likely to cause unsafe condition to traffic shall be performed in poor lighting or visibility conditions within the tunnel. In open sections/elevated structures in foggy or tempestuous weather impairing visibility, no rails shall be displaced and no work which is likely to cause unsafe conditions to the passage of trains shall be performed.
Work under conditions of impaired visibility
9.07. Precautions before commencing operation which would obstruct the line.
(a) possession of the track has been taken over from the traffic controller by the authorised engineering official in accordance with special instructions;
(b) all safety precautions for staff have been taken;
(c) the engineering official-in-charge superintending the work at site has ensured that the traction current has been switched off, if necessary; and
(d) the site of work is protected in accordance with special instructions.
9.08. Showing of signals to control train speeds.
(a) a stop and proceed board or a speed indicator with a warning board of approved shape and size shall be provided for traffic in both directions under special instructions;
(b) the driving motorman of approaching train shall be served with a caution order, informing him of the restriction and the details thereof; and
(c) in addition to (a) & (b) above, for section equipped with CATC system, speed codes on the affected portion shall be arranged to be transmitted in such a way as to enable the train to follow the speed restriction automatically while driving in 'ATO' or 'CMM' mode. In case the train is being driven in RMM mode, it will be the exclusive responsibility of the motorman to obey the speed restriction.
9.09. Supervision of work.
9.10. Knowledge of signals and equipment of gang.
(a) that every gangman and gangmate employed under him has a correct knowledge of hand signals;
(b) that every gang employed in his length Of line is supplied with a permanent way gauge, and two hand signal lamps in addition to such other tools or implements as laid down in special instructions;and
(c) that every Gangman/Trolleyman/PWM is periodically tested for his competence as laid down in special instruction and is in possession of competency certificate to perform his work.
9.11. Inspection of gauges, signals, tools and implements.
9.12. Responsibility of PWM as to safety of line.
(a) that his length of line is kept safe for passage of trains;
(b) that the hand signals, tools and implements supplied are kept in proper order and ready for use; and
(c) that all the men working with him have a correct knowledge of hand signals.
9.13. Putting in or removing points or crossings.
9.14. Working of lorries, trollies and motor trollies.
(b) Such official-in-charge shall be present at the site when it is used and shall be personally responsible for its proper protection, and removal from the line after use.
(a) during non-traffic hours under conditions of clear visibility and under power block or
(b) during traffic hours when track possession has also been taken of that section by the engineering official-in-charge and traction Power Controller has confirmed that the traction current on the section has been switched off.
(b) A lorry or material/push trolley/Motor trolley when not in use, shall be placed at safe place clear of the line and the wheels thereof be secured with a chain and pad lock.
Chapter - X
Power Supply and Traction
Current Arrangements
Section 9 • The Calcutta Metro Railway General Rules, 2000
9. Condition of permanent way and works.
the-calcutta-metro-railway-general-rules-2000-sec-9.json
•
Section 9
{
"act_title": "The Calcutta Metro Railway General Rules, 2000",
"act_slug": "the-calcutta-metro-railway-general-rules-2000",
"section_label": "Section",
"section": {
"number": "9",
"title": "9. Condition of permanent way and works.",
"chapter": null,
"content": "9.02. Maintenance of line.\n(a) programme and arrange maintenance works during non-traffic hours after obtaining power block on third rail;\n(b) see that his length of line or works in his charge is efficiently maintained;\n(c) promptly report to the Engineer-in-Charge all accidents or defects in the way or works, which he considers likely to interfere with the safe running of trains, at the same time taking such action as may be necessary to prevent accidents, and\n(d) co-ordinate with Signal Inspector so that CATC and other track equipments are not damaged or become defective while undertaking maintenance and repair works as required.\n9.03. Keeping of materials.\n9.04. Inspection of permanent way and works.\n9.05. Works involving danger to trains or traffic.\n9.06.\nEmergency repairs to track and structure\n(i) give order to stop train services over the affected sections;\n(ii) inform the concerned Inspector of permanent way or works to proceed to the site of occurrence;\n(iii) have the traction current on the affected portion switched off before the work is commenced;\n(iv) resume train services over the affected section in accordance with special instructions after the concerned structure or track has been attended and certified fit by the competent engineering official not lower than the rank of Permanent Way Inspector in case of track work or Inspector of Works in case of structures.\n(b) Work under conditions of impaired visibility - No rails shall be displaced and no other work which is likely to cause unsafe condition to traffic shall be performed in poor lighting or visibility conditions within the tunnel. In open sections/elevated structures in foggy or tempestuous weather impairing visibility, no rails shall be displaced and no work which is likely to cause unsafe conditions to the passage of trains shall be performed.\nWork under conditions of impaired visibility\n9.07. Precautions before commencing operation which would obstruct the line.\n(a) possession of the track has been taken over from the traffic controller by the authorised engineering official in accordance with special instructions;\n(b) all safety precautions for staff have been taken;\n(c) the engineering official-in-charge superintending the work at site has ensured that the traction current has been switched off, if necessary; and\n(d) the site of work is protected in accordance with special instructions.\n9.08. Showing of signals to control train speeds.\n(a) a stop and proceed board or a speed indicator with a warning board of approved shape and size shall be provided for traffic in both directions under special instructions;\n(b) the driving motorman of approaching train shall be served with a caution order, informing him of the restriction and the details thereof; and\n(c) in addition to (a) & (b) above, for section equipped with CATC system, speed codes on the affected portion shall be arranged to be transmitted in such a way as to enable the train to follow the speed restriction automatically while driving in 'ATO' or 'CMM' mode. In case the train is being driven in RMM mode, it will be the exclusive responsibility of the motorman to obey the speed restriction.\n9.09. Supervision of work.\n9.10. Knowledge of signals and equipment of gang.\n(a) that every gangman and gangmate employed under him has a correct knowledge of hand signals;\n(b) that every gang employed in his length Of line is supplied with a permanent way gauge, and two hand signal lamps in addition to such other tools or implements as laid down in special instructions;and\n(c) that every Gangman/Trolleyman/PWM is periodically tested for his competence as laid down in special instruction and is in possession of competency certificate to perform his work.\n9.11. Inspection of gauges, signals, tools and implements.\n9.12. Responsibility of PWM as to safety of line.\n(a) that his length of line is kept safe for passage of trains;\n(b) that the hand signals, tools and implements supplied are kept in proper order and ready for use; and\n(c) that all the men working with him have a correct knowledge of hand signals.\n9.13. Putting in or removing points or crossings.\n9.14. Working of lorries, trollies and motor trollies.\n(b) Such official-in-charge shall be present at the site when it is used and shall be personally responsible for its proper protection, and removal from the line after use.\n(a) during non-traffic hours under conditions of clear visibility and under power block or\n(b) during traffic hours when track possession has also been taken of that section by the engineering official-in-charge and traction Power Controller has confirmed that the traction current on the section has been switched off.\n(b) A lorry or material/push trolley/Motor trolley when not in use, shall be placed at safe place clear of the line and the wheels thereof be secured with a chain and pad lock.\nChapter - X\nPower Supply and Traction\nCurrent Arrangements",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
"prev_section": "8",
"next_section": "10"
}