(a) specifying, as nearly as possible, the source of supply, situation and limits of the Second-class Irrigation Work notified under sub-section (3) of section 73;
(b) stating that this Part applies to the work so notified from the date of the notification published under sub-section (3) of section 73; and
(c) fixing a period of not less than three months from the date of such proclamation, and requiring every person claiming any right in the work so notified either to present to the Collector within such period a written notice specifying, or to appear before him and state, the nature of such right.
Section 74 • The Bombay Irrigation Act, 1879
74. Proclamation by the Collector.
the-bombay-irrigation-act-1879-sec-74.json
•
Section 74
{
"act_title": "The Bombay Irrigation Act, 1879",
"act_slug": "the-bombay-irrigation-act-1879",
"section_label": "Section",
"section": {
"number": "74",
"title": "74. Proclamation by the Collector.",
"chapter": null,
"content": "(a) specifying, as nearly as possible, the source of supply, situation and limits of the Second-class Irrigation Work notified under sub-section (3) of section 73;\n(b) stating that this Part applies to the work so notified from the date of the notification published under sub-section (3) of section 73; and\n(c) fixing a period of not less than three months from the date of such proclamation, and requiring every person claiming any right in the work so notified either to present to the Collector within such period a written notice specifying, or to appear before him and state, the nature of such right.",
"footnote": "",
"is_definition": false,
"sort_order": 81
},
"prev_section": "73",
"next_section": "75"
}