[Scheme for Construction of [Field-Channels]
20A. [Scheme for construction of [field-channels] .
(i) the object of the scheme;
(ii) the area to which the scheme is applicable;
(iii) the proposed [field-channel] and the most suitable alignment thereof;
(iv) the [***] area which is likely to be needed for construction of the proposed [field-channel] and the plan indicating such area;
(v) survey numbers and acreage of each of the lands to be benefited by the [field-channel] and the names of the holders thereof;
(vi) period within which each holder of the land mentioned in item (v) should construct either by himself or jointly with other holders [the [field-channel] for the carriage of the water from the canal to his land;
(vii) approximate cost of the acquisition of land, if any, to be occupied by the [field-channel] ;
(viii) approximate cost of the construction of the [field-channel] , (including the cost of the acquisition of the land, if any,) in case the holders of land fail to come forward to construct the [field-channel] ;
(ix) the extent of the liability of each holder of land to construct the [field-channel] , and in the event of the holder not intimating under clause (d) of sub-section (5) that he is willing to construct the [field-channel] himself for jointly with others or intimating that he is not willing to do so, the extent of the liability of such holder of land to pay the cost of the construction of the [field-channel] ;
(x) such other particulars as may be prescribed by rules.
(a) sanction the draft scheme with or without modifications,
(b) publish the sanctioned scheme [in such manner] as may be prescribed by rules [***] .
(c) send [a copy of the sanctioned scheme so published to the Collector, and]
[(d) issue notice in the prescribed form and manner to each holder of the land mentioned in the sanctioned scheme, requiring the holder to intimate the Canal-officer in writing, within one week from the receipt of the notice his willingness to construct by himself for jointly with other holders the [field-channel] for the carriage of water from the canal to his land.]
Section 20 • The Bombay Irrigation Act, 1879
20. Procedure after construction of [field-channel] .
the-bombay-irrigation-act-1879-sec-20.json
•
Section 20
{
"act_title": "The Bombay Irrigation Act, 1879",
"act_slug": "the-bombay-irrigation-act-1879",
"section_label": "Section",
"section": {
"number": "20",
"title": "20. Procedure after construction of [field-channel] .",
"chapter": null,
"content": "[Scheme for Construction of [Field-Channels]\n20A. [Scheme for construction of [field-channels] .\n(i) the object of the scheme;\n(ii) the area to which the scheme is applicable;\n(iii) the proposed [field-channel] and the most suitable alignment thereof;\n(iv) the [***] area which is likely to be needed for construction of the proposed [field-channel] and the plan indicating such area;\n(v) survey numbers and acreage of each of the lands to be benefited by the [field-channel] and the names of the holders thereof;\n(vi) period within which each holder of the land mentioned in item (v) should construct either by himself or jointly with other holders [the [field-channel] for the carriage of the water from the canal to his land;\n(vii) approximate cost of the acquisition of land, if any, to be occupied by the [field-channel] ;\n(viii) approximate cost of the construction of the [field-channel] , (including the cost of the acquisition of the land, if any,) in case the holders of land fail to come forward to construct the [field-channel] ;\n(ix) the extent of the liability of each holder of land to construct the [field-channel] , and in the event of the holder not intimating under clause (d) of sub-section (5) that he is willing to construct the [field-channel] himself for jointly with others or intimating that he is not willing to do so, the extent of the liability of such holder of land to pay the cost of the construction of the [field-channel] ;\n(x) such other particulars as may be prescribed by rules.\n(a) sanction the draft scheme with or without modifications,\n(b) publish the sanctioned scheme [in such manner] as may be prescribed by rules [***] .\n(c) send [a copy of the sanctioned scheme so published to the Collector, and]\n[(d) issue notice in the prescribed form and manner to each holder of the land mentioned in the sanctioned scheme, requiring the holder to intimate the Canal-officer in writing, within one week from the receipt of the notice his willingness to construct by himself for jointly with other holders the [field-channel] for the carriage of water from the canal to his land.]",
"footnote": "",
"is_definition": false,
"sort_order": 18
},
"prev_section": "19",
"next_section": "20B"
}