← Back to The Bombay Highways Rules, 1958

5. Purpose for which permission is sought (give full details).

6. * Particulars of land on which the work is to be carried out -
(a) Survey No.
(b) Hissa No. Pot Hissa No.
(c) Total area of the plot in possession of the applicant.
(d) Area of the land to be used out of (c) above for the work.
* Notes. - (1) A rough sketch showing all the particulars against items 6 and 7 of the form and the distance between the site of the work and the highway boundary should accompany the application.
* Notes.
(2) Applications pertaining to construction, reconstruction, extension of or material alterations to buildings should be accompanied by a detailed plan of the structure existing old or proposed as the case may be, and the proposed additions and alterations, if any, duly certified by an architect.
7. * Name of the highway along which the property is situated, with mile number and furlong number.