(a) on the expiry of the period for which it was granted ; or
(b) when any accident occurs to the boiler ; or
(c) when the boiler is moved, the boiler not being a vertical boiler the heating surface of which is less than two hundred square feet, or a portable or vehicular boiler ; or
(d) when any structural alteration, addition or renewal is made in or to the boiler ; or
(e) if the Chief Inspector in any particular case so directs, when any structural alteration, addition or renewal is made in or to any steam-pipe attached to the boiler ; or
(f) on the communication to the owner of the boiler of an order of the Chief Inspector or Inspector prohibiting its use on the ground that it or any steam-pipe attached thereto is in a dangerous condition.
(a) proposes to issue any certificate-
(i) having validity for a less period than the period entered in the application, or
(ii) increasing or reducing the maximum pressure at which the boiler may be used, or
(b) proposes to order any structural alteration, addition or renewal to be made in or the boiler or any steam-pipe attached thereto, or
(c) is of opinion that the boiler is not fit for use, the Inspector shall, within forty-eight hours of making the examination, inform the owner of the boiler in writing of his opinion and the reasons therefor, and shall forthwith report the case for orders to the Chief Inspector.
Section 8 • The Boilers Act, 1991 (1934 A. D.)
8. Renewal of certificate.
the-boilers-act-1991-1934-a-d-sec-8.json
•
Section 8
{
"act_title": "The Boilers Act, 1991 (1934 A. D.)",
"act_slug": "the-boilers-act-1991-1934-a-d",
"section_label": "Section",
"section": {
"number": "8",
"title": "8. Renewal of certificate.",
"chapter": null,
"content": "(a) on the expiry of the period for which it was granted ; or\n(b) when any accident occurs to the boiler ; or\n(c) when the boiler is moved, the boiler not being a vertical boiler the heating surface of which is less than two hundred square feet, or a portable or vehicular boiler ; or\n(d) when any structural alteration, addition or renewal is made in or to the boiler ; or\n(e) if the Chief Inspector in any particular case so directs, when any structural alteration, addition or renewal is made in or to any steam-pipe attached to the boiler ; or\n(f) on the communication to the owner of the boiler of an order of the Chief Inspector or Inspector prohibiting its use on the ground that it or any steam-pipe attached thereto is in a dangerous condition.\n(a) proposes to issue any certificate-\n(i) having validity for a less period than the period entered in the application, or\n(ii) increasing or reducing the maximum pressure at which the boiler may be used, or\n(b) proposes to order any structural alteration, addition or renewal to be made in or the boiler or any steam-pipe attached thereto, or\n(c) is of opinion that the boiler is not fit for use, the Inspector shall, within forty-eight hours of making the examination, inform the owner of the boiler in writing of his opinion and the reasons therefor, and shall forthwith report the case for orders to the Chief Inspector.",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
"prev_section": "7",
"next_section": "9"
}