35. Power of revocation and modification of permission to develop.

(a) where the permission relates to the carrying out of building or other operations no such order;
(i) shall affect such of the operations as have been previously carried out;
(ii) shall be passed after these operations have been completed;
(b) where permission relates to a change of use of land, no such order shall be passed at any time after the change has taken place.