(a) cost of coal including freight, transport, loading/unloading charges;
(b) expense incurred on moulding of kacha bricks, including expense on sand, clay and water;
(c) expense in loading and unloading bricks from kiln and stocking in the premises of the bricks kiln;
(d) Mistri and labour charges for firing kiln;
(e) maintenance of temporary labour huts, chimney and bricks kiln equipment;
(f) cost of firewood and igniting coal;
(g) tax and overheads;
(h) natural damages to bricks; and
(i) profit not exceeding fifteen per cent.
Section 9 • The Bihar Bricks Control Order, 1983
9. Price of bricks.
the-bihar-bricks-control-order-1983-1983-sec-9.json
•
Section 9
{
"act_title": "The Bihar Bricks Control Order, 1983",
"act_slug": "the-bihar-bricks-control-order-1983-1983",
"section_label": "Section",
"section": {
"number": "9",
"title": "9. Price of bricks.",
"chapter": null,
"content": "(a) cost of coal including freight, transport, loading/unloading charges;\n(b) expense incurred on moulding of kacha bricks, including expense on sand, clay and water;\n(c) expense in loading and unloading bricks from kiln and stocking in the premises of the bricks kiln;\n(d) Mistri and labour charges for firing kiln;\n(e) maintenance of temporary labour huts, chimney and bricks kiln equipment;\n(f) cost of firewood and igniting coal;\n(g) tax and overheads;\n(h) natural damages to bricks; and\n(i) profit not exceeding fifteen per cent.",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
"prev_section": "8",
"next_section": "10"
}