(a) damaged or dislodged fixed equipment within the railway right of way;
(b) broken or buckled rails;
(c) displaced or damaged third rail power conductors;
(d) construction activities adjacent to the track including use of cranes which can swing within Sm of the track;
(e) road accidents which might cause or have caused damage to bridges and viaducts;
(f) road accidents which might cause or have caused vehicles or their loads to encroach on the railway right of way; and
(g) any other obstruction on the track.
Section 53 • The Bangalore Metro Railway (General) Rules, 2011
53. Other unsafe conditions.
the-bangalore-metro-railway-general-rules-2011-sec-53.json
•
Section 53
{
"act_title": "The Bangalore Metro Railway (General) Rules, 2011",
"act_slug": "the-bangalore-metro-railway-general-rules-2011",
"section_label": "Section",
"section": {
"number": "53",
"title": "53. Other unsafe conditions.",
"chapter": null,
"content": "(a) damaged or dislodged fixed equipment within the railway right of way;\n(b) broken or buckled rails;\n(c) displaced or damaged third rail power conductors;\n(d) construction activities adjacent to the track including use of cranes which can swing within Sm of the track;\n(e) road accidents which might cause or have caused damage to bridges and viaducts;\n(f) road accidents which might cause or have caused vehicles or their loads to encroach on the railway right of way; and\n(g) any other obstruction on the track.",
"footnote": "",
"is_definition": false,
"sort_order": 52
},
"prev_section": "52",
"next_section": "54"
}