(a) (i) Operations Control Center;
(ii) each station;
(iii) each rake maintenance depot, traction depot, permanent way depot and signal depot; and
(iv) such other offices as may be specified under special instructions; and
(b) each employee of the Bangalore Metro Railway on whom any definite responsibility has been placed by these rules, or of such portions of rules as relate to his duties.
Section 3 • The Bangalore Metro Railway (General) Rules, 2011
3. Supply of copies of rules.
the-bangalore-metro-railway-general-rules-2011-sec-3.json
•
Section 3
{
"act_title": "The Bangalore Metro Railway (General) Rules, 2011",
"act_slug": "the-bangalore-metro-railway-general-rules-2011",
"section_label": "Section",
"section": {
"number": "3",
"title": "3. Supply of copies of rules.",
"chapter": null,
"content": "(a) (i) Operations Control Center;\n(ii) each station;\n(iii) each rake maintenance depot, traction depot, permanent way depot and signal depot; and\n(iv) such other offices as may be specified under special instructions; and\n(b) each employee of the Bangalore Metro Railway on whom any definite responsibility has been placed by these rules, or of such portions of rules as relate to his duties.",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
"prev_section": "2",
"next_section": "4"
}