16. Appeal against the order of Superintending Engineer under Section 9(1).

(b) An appeal under sub-section (1) of Section 9 may be preferred before the appellate authority by filing a memorandum of appeal. The memorandum shall have to filed within 15 (fifteen) days of passing of order under Section 8 (2) and in the manner as laid down in Rule 15 (a).
(c) The memorandum of appeal shall be accompanied by an additional copy of memorandum.
(d) On receipt of the memorandum the appellate authority shall send the additional copy to the Superintending Engineer to forward within 7 (seven) days from the date of receipt of the appellate authority's requisition, and the records of the case along with a report from the Superintending Engineer on the memorandum.
(e) On receipt of the records from the Superintending Engineer whose order is appealed against, the appellate authority may, for reasons to be recorded in writing, reject the memorandum or may make further enquiry or direct such enquiry to be made by any other officer subordinate to him, specifying the points on which such enquiry is necessary. For the purpose of such enquiry, the appellate authority or the officer aforesaid shall have the power to examine on oath or affirmation any person summoned by it or him, to reduce into writing any statement made by the person so examined and also to enter upon and inspect any land.
(f) Pending decision of the appeal preferred under Section 9(1), the appellate authority may, on sufficient grounds being shown, stay the order of Superintending Engineer. When such order is made a copy thereof shall forthwith be forwarded to the concerned Superintending Engineer and Irrigation Officer.
(g) At the hearing of the appeal the appellate authority may hear arguments of the appellant or his agent duly authorised by him in writing in that behalf and record its decision, in the appeal. An authenticated copy of the appellate authority's final decision under sub-section (2) of Section 9 shall be sent to the Superintending Engineer and Irrigation Officer concerned within 7 (seven) days from the date of such decision.
17.
(b) All expenditure to be incurred for implementation of the scheme shall be initially borne out of the revolving fund to be provided by the Government or shall be booked under miscellaneous advance and subsequently adjusted on receipt of payment from the Bank. Cost of unsuccessful tube-well shall be borne by the Government.
(c) Sufficient stock of materials like pipe, strainer etc. shall be maintained by the Department so that the execution of work is not delayed for want of such materials.
(d) The work shall be executed as per departmental norm.
(e) As far as practicable the Irrigation Officer may execute the work through 'Irrigation group' and in such case the rate allotted shall be the estimated rate.
(f) For arranging after sale, proper service brand of pump in case of shallow tube-well shall be fixed block wise and the Irrigation Officer shall accordingly indicate the brand in the draft scheme itself.
(g) The tube-well assembly particularly in case of shallow tube-well shall be lowered in presence of the authorised member and measurement taken in his presence. The authorised member shall sign the necessary certificates in this regard as per Annexure 'C' in duplicate.
(h) Physical demonstration in the presence of the authorised member about discharge of the shallow tube-well shall be given for (4) four hours continuous run and thereafter the discharge shall be measured which will be taken as discharge of shallow tube-well and the authorised member shall sign the certificate as per Annexure 'D' in duplicate, shallow tube-well giving discharge of less than 5,000 gallons per hour shall be considered as unsuccessful.
(i) Performance certificate of the pump shall be obtained by the supplier in triplicate from the authorised member after giving proper demonstration in the presence of Department Officer and handed over two copies to the Irrigation Officer.
(j) The completion certificate of the scheme as a whole shall be obtained in duplicate as per Annexure 'E' and signed by the authorised member or the Secretary of the group.
(k) The Irrigation Officer (Executive Engineer or Sub-divisional Officer) shall submit bill to the concerned Bank within 10 (ten) days of completion of scheme. One copy of certificate as mentioned in sub-rules (7), (8), (9) and (10) above shall have to be enclosed with the bill.
(l) The Bank shall make payment within 10 (ten) days of receiving the bill from the Irrigation Officer.
(m) Necessary guidelines for the estimate may be issued by the Department from time to time as it deems fit.
(n) Any dispute in regard to implementation between the Irrigation Officer and the group shall be settled as per provision laid down under Sections 8 (1) and (2) and 9 (1) and (2).