104. Maintenance of Inspection Book.

105.
106.
(i) printed fabrics shall be thoroughly dried by passing them over drying cans or through a hot flue or other equally effective means, before the same are allowed to pass through the polymerising machine ;
(ii) the exhaust flap or damper shall be provided with a hole or opening so that at least 2/3 of it is always open ;
(iii) infra-red ray heaters of the machines shall be cut off while running the prints :
(iv) the electrical heaters shall be connected to a separate circuit and shall be provided with an isolation switch so as to ensure that it is completely cut off in an emergency ;
(v) the electrical heater shall be so located that if thee is any dropping of the solvent due to condensation, it does not directly come in contact with the heaters;
(vi) the drive of the exhaust fan shall be interlocked with the main drive of the machine in such a way that if the exhaust motor stops, the machine including all heating devices shall also stop ;
(vii) the electrical heater shall have thermostats to regulate the temperature so that heater shall automatically cut off, if the temperature rises above the pre-set value ;
(viii) adequate flaps shall be provided on top of the machine which can open and let off the fumes outside the work room in case of an explosion or in case any pressure is built up ;
(ix) filter gauze shall be cleansed at least once a week ;
(x) exhaust dust shall be cleansed at least once a week ;
(xi) tension of the V belt drive of the fans shall be checked every week.
Schedule XIV
Process of extracting oil and fats from vegetable and animal sources in solvent extraction plants
Process of extracting oil and fats from vegetable and animal sources in solvent extraction plants
(a) "solvent extrication plant" means a plant in which the process of extracting oil and fats from vegetable and animal sources by use of solvents is carried on ;
(b) "solvent" means an inflammable liquid such as pentanel, hexane and heptane is used for recovery of vegetable oils ;
(c) "flame-proof enclosure' as applied to electrical machinery or apparatus means an enclosure that will withstand when covers or other access doors are properly secured as internal explosion of the flammable gas or vapour which may enter or which may originate inside the enclosure without suffering damage and without communcating internal inflammation or explosion to the external flammable gas or vapour;
(d) "competent person" for the purpose of this Schedule shall be at least a member of the Institution of Engineers (India) or, an Associate Member of the said Institution with 10 years' experience in a responsible position as may be approved by the Chief Inspector :
Chapter XI
Forms Prescribed Under The Rules
Form No. 1
Form No. 1
[Prescribed under Rule 3]
Application for permeation to construct, extend or take into use any building as a factory.
Application for permeation to construct, extend or take into use any building as a factory.
Applicant's calling...........
Applicant's address .............
State......
District........
Town or village............
Nearest Railway Station or Steamer ghat...............
Signature of applicant
Note. -This application shall be accompanied by the following documents :
Note.
(a) a flow chart of the manufacturing process supplemented by a brief description of the process in its various stages ;
(b) plans, in duplicate, drawn to scale, showing-
(i) the site of the factory and immediate surrounding including adjacent buildings and other structures, roads, drains etc; and
(ii) the plan, elevation and necessary cross-section of the various buildings, indicating all relevant details relating to natural lighting, ventilation and means of escape in case of fire. The plans shall also clearly indicate the position of plant and machinery, aisles and passageways ;
(c) such other particulars as the Chief Inspector of Factories may require.
Form No. 2
Form No. 2
[Prescribed under Rules 4 and 7]
(b) Full address to which communication relating to the factory should be sent............
(a) carried on in the factory during the last 12 moths (in the case of the factories already in existence) ...........
(b) to be carried on in the factory during the next 12 months (in the case of all the factories)...........
(ii) Maximum number of workers employed on any one day during the last 12 months...........
(iii) Number of workers to be ordinarily employed in the factory.........
(ii) Maximum amount of power (H.P.) proposed to be used..................
(i) the proprietor of the factory in case of private firm/proprietary concern................
(ii) directors in case of a public limited liability Company/Firm.......
(iii) where a managing agent has been appointed the name of managing agents and Directors thereof..............
(iv) shareholders in case of a private company where no managing agents have been appointed................
(v) the Chief Administrative Head in case of a Government or local fund factorv.............
(a) reference No. and date of approval of the plans for site whether for old or new building and for construction or extension of a factory by the State Government/Chief Inspector....................
(b) reference No. and date of approval of the arrangements, if any, made for the disposal of trade waste and effluents and the name of the authority granting such approval................
(i) paid in......................(Treasury on.................vide challan No...........enclosed).
(ii) transmitted by crossed cheque/postal Order No dated on the bank/ on the post office drawn in favour of the Chief Inspector of Factories.
Signature of occupier
Date...................
Signature of Manager
Date..................
Note. -1. This form should be completed in ink in block letters or typed.
Note.