Section 23 • THE ANDHRA PRADESH MUNICIPAL TRAMWAYS (CONSTRUCTION, OPERATION AND MAINTENANCE) ACT, 2008
Section 23. Inspection of tramway before opening
23. Inspection of tramway before opening - A tramway system, or portion or extension of, or addition to a tramway system, shall not be opened for public traffic until it has been inspected and certified to be fit for such traffic by the Safety Commissioner appointed by the State Government under section 30.
{
"act_title": "THE ANDHRA PRADESH MUNICIPAL TRAMWAYS (CONSTRUCTION, OPERATION AND MAINTENANCE) ACT, 2008",
"act_slug": "the-andhra-pradesh-municipal-tramways-construction-operation-and-maintenance-act-2008",
"section_label": "Section",
"section": {
"number": "23",
"title": "Section 23. Inspection of tramway before opening",
"chapter": null,
"content": "23. Inspection of tramway before opening - A tramway system, or portion or extension of, or addition to a tramway system, shall not be opened for public traffic until it has been inspected and certified to be fit for such traffic by the Safety Commissioner appointed by the State Government under section 30.",
"footnote": "",
"is_definition": false,
"sort_order": 1470
},
"prev_section": "22",
"next_section": "24"
}